Service difficulty report · Floor Support · Emb ERJ190100IGW

Difficulty date
November 19, 2021
Submitted
November 30, 2021
Operation
Air carrier
Aircraft
N318JB
Make and model
Emb ERJ190100IGW
Aircraft serial
364
Aircraft time
30,441 hours, 20,168 cycles
Part
Floor Support
Condition
Corroded
Location
Fwd Lav
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DURING HEAVY MAINTENANCE, INITIAL INSPECTION: (CPCP FINDING): CORROSION ON DOUBLER FLOOR STRUCTURE W1 (UNDER FWD. LAVATORY).; SUMMARY TOMEX WO 1708 NRC 00371: DOUBLER FLOOR STRUCTURE W1 ( UNDER FWD LAVATORY) WAS REPLACED PER EMB 190 SRM 51-41-02 PAR.4 & PAR.6. SUMMARY TOMEX WO 1708 NRC 00371: DOUBLER FLOOR STRUCTURE W1 ( UNDER FWD LAVATORY) WAS REPLACED PER EMB 190 SRM 51-41-02 PAR.4 & PAR.6.

More about the Emb ERJ 190-100 IGW