Service difficulty report · Skin · Airbus A320232

Difficulty date
July 30, 2022
Submitted
August 2, 2022
Operation
Air carrier
Aircraft
N535JB
Make and model
Airbus A320232
Aircraft serial
01739
Aircraft time
76,093 hours, 27,546 cycles
System (JASC)
5711 · Wing Spar
Part
Skin
Condition
Corroded
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DURING HEAVY MAINTENANCE: CORROSION REAR SPAR LOC. TOP SKIN, LOWER SURFACE, OVERHANG BTW RIB14 T O RIB15 ON LH WING REFER TO THE MPD TASK 572179-01; PERFORMED INTERIM REPAIR ON TOP SKIN LOWER SURFACE OVERHANG LOC RIB 14 ON LH WING I.A.W. EC NO. A22-606-01, AND EA NO. 57-0204-22, PART 1 TO PART 12, WITH NO REPAIR CATEGORY, SOLUTION LIFE, OR LIMITATION. 6 MONTHS I.A.W. RDAF NO. 81076198/004/2022#A TOOL USED CALIPER P/N 500-464, S/N B17030932, DUE DATE NOV-29-2022 CALIPER, P/N:500-752-20 S/N: B21038259 DUE DATE: AUG -10-2022. EDDY CURRENT EQUIPMENT PN: NORTEC500D, SN: N500X1693P030456 DUE DATE: JAN 26 2023. ULTRASONIC EQUIPMENT PN: 45MG, SN: 130060401, DUE DATE: JAN 26 2023. ULTRASONIC THICKNESS INSTRUMENT P/N 45MG S/N 130066701 DUE DATE APR-08-2023. DIGITAL CALIPER :P/N: 500-197-30 S/N: A18229497 DUE DATE : SEP-21-2022 MICROMETER P/N : 293-340-30 ,S/N : 63324500; DUE DATE : SEP-24-2022 ULTRASONIC THICKNESS INSTRUMENT P/N: 35DL, S/N: 091419910, DUE DATE: JAN 26 2023. FLAP SPEED P/N FPK-PRO-104, S/N PRO-3446, DUE DATE JAN-12-2023 COMPLETED MAX-220 FROM BY CPCP PROGRAM ACCOMPLISHED ON AEROMAN W/O:2022 76/1 NRC: 2022 - 327730 TECH: S. MURCIA 8672520 INSP: INSP. S. ASCENCIO PERFORMED INTERIM REPAIR ON TOP SKIN LOWER SURFACE OVERHANG LOC RIB 14 ON LH WING I.A.W. EC NO. A22-606-01, AND EA NO. 57-0204-22, PART 1 TO PART 12, WITH NO REPAIR CATEGORY, SOLUTION LIFE, OR LIMITATION. 6 MONTHS I.A.W. RDAF NO. 81076198/004/2022#A TOOL USED CALIPER P/N 500-464, S/N B17030932, DUE DATE NOV-29-2022 CALIPER, P/N:500-752-20 S/N: B21038259 DUE DATE: AUG -10-2022. EDDY CURRENT EQUIPMENT PN: NORTEC500D, SN: N500X1693P030456 DUE DATE: JAN 26 2023. ULTRASONIC EQUIPMENT PN: 45MG, SN: 130060401, DUE DATE: JAN 26 2023. ULTRASONIC THICKNESS INSTRUMENT P/N 45MG S/N 130066701 DUE DATE APR-08-2023. DIGITAL CALIPER :P/N: 500-197-30 S/N: A18229497 DUE DATE : SEP-21-2022 MICROMETER P/N : 293-340-30 ,S/N : 63324500; DUE DATE : SEP-24-2022 ULTRASONIC THICKNESS INSTRUMENT P/N: 35DL, S/N: 091419910, DUE DATE: JAN 26 2023. FLAP SPEED P/N FPK-PRO-104, S/N PRO-3446, DUE DATE JAN-12-2023 COMPLETED MAX-220 FROM BY CPCP PROGRAM ACCOMPLISHED ON AEROMAN W/O:2022 76/1 NRC: 2022 - 327730 TECH: S. MURCIA 8672520 INSP: INSP. S. ASCENCIO (CONSIDERED AS A MAJOR REPAIR)

More about the Airbus A320-232