What was found
DURING HEAVY MAINTENANCE: INITIAL INSPECTION CPCP FINDING: CORROSION ON SHEAR CLIP AT FUSELAGE INTERNAL STRUCTURE FRAME 82 BTW STR 28-29RH; CORROSION ON SHEAR CLIPAT FUSELAGE INTERNAL STRUCTURE FRAME 82 BTW STR 28-29RH WAS REMOVED AND EVALUATED, THEREFORE IT IS OUT LIMITS. SHEARCLIP WAS REPLACED BY A NEW ONE PER EMB190 SRM 51-41-02 AND SRM 51-43-01. ALL WORK WAS ACCOMPLISHED ON TOMX NR 00223. (CONSIDERED A MAJOR REPAIR)