As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
DURING HEAVY MAINTENANCE: INITIAL INSPECTION : INITIAL INSPECTION (CPCP FINDING) CORROSION ON SHEAR CLIP AT FR90 BTW STGR 27RH TO STGR 28RH AT CENTER FUSELAGE III; (RESOLVED ON W/O: 1267464 TASKCARD: NR-00060) REF WO#2452 N/R 00327 - R&R SHEAR CLIP AT FR90 BTW STGR 27RH TO STGR 28RH PER EMB-190 SRM 51-41-02 AND SRM 51-41-01.