What was found
DURING HEAVY MAINTENANCE: FUSELAGE / CENTER FUSELAGE / PRESSURE BULKHEAD @ FR 35 & STR30L / CRACKS AT FASTENER HOLES – TIME LIMITED REPAIR (A24-725-01) (CONSIDERED A MAJOR REPAIR)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING HEAVY MAINTENANCE: FUSELAGE / CENTER FUSELAGE / PRESSURE BULKHEAD @ FR 35 & STR30L / CRACKS AT FASTENER HOLES – TIME LIMITED REPAIR (A24-725-01) (CONSIDERED A MAJOR REPAIR)