Service difficulty report · Post · Airbus A320232

Difficulty date
August 1, 2024
Submitted
August 6, 2024
Operation
Air carrier
Aircraft
N556JB
Make and model
Airbus A320232
Aircraft serial
01904
Aircraft time
77,797 hours, 28,366 cycles
Part
Post
Condition
Cracked
Location
Windshield
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DURING CURRENT CHECK, AEM REPORTED CRACKS ON THE WINDSHIELD FRAMING CENTER POST LOWER ATTACHMENT ON BOTH SIDES OF AREAS C & D. DAMAGE REMOVED BY FOLLOWING CRACK ASSESSMENT GUIDELINES, REF /3/, FOR BOTH AREAS. AIRBUS WAS CONTACTED FOR ASSESSMENT AND DETERMINE AEM SHOULD FOLLOW REPAIR SOLUTIONS RS2 & RS7 OF. THE REPAIR CONSISTED OF MIRROR FITTING IMPLEMENTATION FOR AREAS C AND BUSHING REPAIRS FOR AREAS D, CONTINUITY FITTINGS HAD NO CRACKS BUT WERE REPLACED TO IMPROVE THE FATIGUE LIFE OF THE REPAIR, EC E24-909-01 IS ISSUED TO ACCOMPLISH THE PERMANENT REPAIR IAW EC E24-909-02 POST-REPAIR INSPECTIONS OF THE CONTINUITY FITTINGS TH = 29500 FC (FH NOT RELEVANT), INT = 8700 FC (FH NOT RELEVANT), HFEC AS PER NTM 53-11-29 AFTER SHIM REMOVAL. EC E24-909-03 IS ISSUED TO ACCOMPLISH THE POST-REPAIR INSPECTION OF THE WINDSHIELD FRAMING AT TH = 27000 FC (FH NOT RELEVANT), INT = 4700 FC (FH NOT RELEVANT), HFEC AS PER NTM 53-11-29 AFTER MIRROR FITTING REMOVAL. EC E24-909-04 IS ISSUED TO ACCOMPLISH THE INSPECTION OF THE MIRROR FITTING AND IS PENDING OEM APPROVAL TH = 60000 FC. EC E24-909-05 IS ISSUED TO ACCOMPLISH THE INSPECTION OF THE LT & RT HOLE D1 AND IS PENDING OEM APPROVAL TH = 60000 FC. THIS PERMANENT REPAIR IS APPROVED PER REF /6/, RDAF AND IS CLASSIFIED AS MAJOR (E/C: A24-909-01).