What was found
DURING HEAVY MAINTENANCE: LH ELEVATOR DAMAGED BY ANOTHER AIRCRAFT; NEW H. STAB IS ASSEMBLED WITH TWO NEW ELEVATORS. REF EC AC24-969-11 INSTALLATION OF NEW H.STAB.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING HEAVY MAINTENANCE: LH ELEVATOR DAMAGED BY ANOTHER AIRCRAFT; NEW H. STAB IS ASSEMBLED WITH TWO NEW ELEVATORS. REF EC AC24-969-11 INSTALLATION OF NEW H.STAB.