What was found
FLT#591, BOS-TPA.'DURING OPS CHK OF EPSU SYS, BATT 11WL FAILED OPS CHECK; REMOVED AND REPLACED L/H OVERWING EPSU EMERG LIGHT BATT (11WL) IAW AMM 33-51-38. OPS CHECK GOOD. TEST PASSED. SYS OK FOR CONT SVC.'
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
FLT#591, BOS-TPA.'DURING OPS CHK OF EPSU SYS, BATT 11WL FAILED OPS CHECK; REMOVED AND REPLACED L/H OVERWING EPSU EMERG LIGHT BATT (11WL) IAW AMM 33-51-38. OPS CHECK GOOD. TEST PASSED. SYS OK FOR CONT SVC.'