Service difficulty report · Firewall · Airbus A320232

Difficulty date
May 19, 2025
Submitted
May 20, 2025
Operation
Air carrier
Aircraft
N591JB
Make and model
Airbus A320232
Aircraft serial
02246
Aircraft time
77,654 hours, 27,719 cycles
Part
Firewall
Condition
Damaged
Location
Zone 100
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DURING HEAVY MAINTENANCE: FUSELAGE / TAILCONE / FIREWALL / FR 81-83 LH & RH / DEVIATIONS TO SB A320-53-1500 (FIXATION OF APU AIR INTAKE DUCT MOD) - PERMANENT REPAIR; REFERENCES: /1/ AEROMAN EA 53-0014-25 REV. 0 (COVER + PART 1) /2/ AIRBUS MESSAGE 81559155/008 /3/ AIRBUS TD/81180000/006/2023#A /4/ AIRBUS RDAF 81559155/003/2025#A /5/ AIRBUS SB A320-53-1500 (JETBLUE EC/TC A320-53-1500). DURING THE CURRENT (4/2025) M3 CHECK FOR A/C N591JB IN SAL, AEROMAN REPORTED THAT DEVIATIONS WERE REQUIRED DURING THE ACCOMPLISHMENT OF THE REF /5/ SB +JB EC/TC FOR THE MODIFICATION OF THE APU AIR INTAKE DUCT ON THE TAILCONE FIREWALL BETWEEN FR 81-83 LH/RH SIDES. THE DEVIATIONS REQUIRED ARE AS FOLLOWS: DEVIATION 1 (LAYOUT) • REFER TO STEP 47 OF REF /5/ TC• LH FIREWALL CUTOUT BETWEEN FR 81-83 ADJUSTMENTS WERE NEEDED AT UPPER AND LOWER POSITION OF THE CUT-OUT FOR CORRECT ALIGNMENT. DEVIATION 2 (OPEN PILOT HOLES ON RHS COVER)• REFER TO STEPS 139-146 OF REF /5/ TC• 3 PILOT HOLES ON ITEM 42 (COVER P/N D53585529200) RHS WERE REPORTED.• HOLES TO BE PLUGGED IN ACCORDANCE WITH THE REF /3/TD USING BLIND. DEVIATION 3 (PART INTERCHANGEABILITY) THE FOLLOWING PARTS ARE REQUIRED TO USE ALTERNATES, DUE TO THE PNS RECEIVED IN THE SB KITS:• PN D5358551100400 INSTEAD OF D5358551100000 (REFER TO STEPS 64 & 73 OF REF /5/ TC)• PN D5358551500200 INSTEAD OF D5358551500000 (REFER TO STEPS 65 & 74 OF REF /5/ TC)• PN D5358551100600 INSTEAD OF D5358551100200 (REFER TO STEPS 124 & 134 OF REF /5/ TC)•PN D5358553200200 INSTEAD OF D5358553200000 (REFER TO STEPS 126 & 135 OF REF /5/ TC)• PN D5358550700200 INSTEAD OF D5358550700000 (REFER TO STEPS 202 & 206 OF REF /5/ TC). AIRBUS WAS CONTACTED FOR REPAIR DISPOSITION/APPROVAL FOR ALL DEVIATIONS. AIRBUS PROVIDED THE REF /2/ MESSAGE AND REF /3/ TD WITH INSTRUCTIONS TO PERFORM DEVIATIONS AS REQUESTED. ALL OTHER REQUIREMENTS SHOULD BE FOLLOWED PER REF /5/ SB +JB EC/TC. THESE INSTRUCTIONS ARE APPROVED BY THE REF /4/ RDAF AS PERMANENT, WITH NO POST REPAIR INSPECTIONS REQUIRED. THIS EC ACCOMPLISHES THE PERMANENT REPAIR PER THE REF /1/ EA AND COMPLIES WITH THE REF /4/ RDAF WITHOUT DEVIATION. SUBSTANTIATION: THIS PERMANENT, CATEGORY A, REPAIR HAS BEEN APPROVED VIA REF /4/ RDAF AND IS CLASSIFIED AS MAJOR.(E/C: A25-363-01)

More about the Airbus A320-232