What was found
FLT SAN-BOS. CREW REPORTED DIRTY SOCK SMELL DURING LANDING. QUICKLY, R & R ENG 1 FAN SHAFT COVER PACKING IAW PWM 72-15-00. PERFORMED IDLE LEAK CHK, LEAK CHK OK. HIGH POWER RUN REQ'D ON L/P 4565076 ITEM 2.Y DISSIPATED; COMPLITED LEVEL A DECON. ON L/P'S 4565075 + 4565076 + 4565078 - 4565079 CHK OK PER AMM 21-00-00-617-803-A. PERFORMED HIGH POWER RUN IAW AMM 71-00-00 SEE DEFECT 4565079-2 FOR FURTHER MX ACTIONS IN REF TO TSI # 625259 (BSIX DECEN) PERFORMED LEVEL C STAGE 2 CLEANING OF PACK 1 IAW AMM 21-00-00-615-804-A. DEFECT REMAONS OPEN AT THIS TIME.PREFORMED LEVEL A DECON PER AMM 21-00-00 NO CABIN ODOR DETECTED