What was found
DURING HEAVY MAINTENANCE, EA A26-699-01, CENTER FUSELAGE, FR36 LH PRESSURE PANEL ATTACHMENT HOLES CRACKED. TIME LIMITED REPAIR (CONSIDERED AS A MAJOR REPAIR)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING HEAVY MAINTENANCE, EA A26-699-01, CENTER FUSELAGE, FR36 LH PRESSURE PANEL ATTACHMENT HOLES CRACKED. TIME LIMITED REPAIR (CONSIDERED AS A MAJOR REPAIR)