What was found
DURING ACCOMPLISHMENT OF AD 92-22-07 (DC-8 CORROSION PROGRAM) THE FOLLOWING INITIAL INSPECTIONS REVEALED LEVEL 2 CORROSION. LT HOR O/B EXT. XE 271-273. XE 310-312.5. REPAIRED IAW APPLICABLE SRM'S, DWG., ETC. (X)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING ACCOMPLISHMENT OF AD 92-22-07 (DC-8 CORROSION PROGRAM) THE FOLLOWING INITIAL INSPECTIONS REVEALED LEVEL 2 CORROSION. LT HOR O/B EXT. XE 271-273. XE 310-312.5. REPAIRED IAW APPLICABLE SRM'S, DWG., ETC. (X)