What was found
DURING ACCOMPLISHMENT OF AD 92-22-07 (DC-8 CORROSION PROGRAM) THE FOLLOWING INITIAL INSPECTIONS REVEALED LEVEL 2 CORROSION. UPPER CARGO DOOR HINGE ABOVE FWD SWIVEL DOOR AFT END. REPAIRED IAW APPLICABLE SRM'S, DWG., ETC. (X)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING ACCOMPLISHMENT OF AD 92-22-07 (DC-8 CORROSION PROGRAM) THE FOLLOWING INITIAL INSPECTIONS REVEALED LEVEL 2 CORROSION. UPPER CARGO DOOR HINGE ABOVE FWD SWIVEL DOOR AFT END. REPAIRED IAW APPLICABLE SRM'S, DWG., ETC. (X)