What was found
DURING CHECK-C MAINT IN THE FWD CABIN, FOUND CORROSION ON FLOOR SUPPORT AT BL 56 INCHES, AND FROM STA 160 TO 200. REMOVED VISIBLE CORROSION PER SPM 6-80-01. NEW SUPPORT FABRICATED FROM EXTRUSION PER MATERIAL SPECIFICATIONS IN SRM 53-14-1, FIG 11. TREATED PART PER SRM 51-10-3.