What was found
DURING CHECK-C MAINT FOUND DEEP CORROSION ON LONGERON 23R, WITH PITS IN BOTTOM END TIE, STA 1320 TO 1338. REPLACED LONGERON 23R WITH NEW. SEALED PART DURING INSTALLATION PER SRM 51-20-00. REPLACED EXISTING HI-LOKS WITH HL 329 AND HLT 429 PER SRM 51-60-0 FIG 4. REINSTALLED RIVETS PER SRM 51-30-02.