What was found
DURING CHECK-C MAINT IN FWD CABIN FOUND CORROSION ON FLOOR SUPPORT AT STA 200, FROM RBL 9 INCHES THRU RBL 46 INCHES. FABRICATED NEW FLOOR SUPPORT PER DRAWING 9936534. APPLIED ALODINE PER SRM 51-10-3 PAGE 18. PRIMED AND TOP COAT PER SRM 51-10-3, PAGE 16. RE-INSTALLED NEW FLOOR SUPPORT PER SRM 51-30 AND SRM 5-10-4, AT STA 200, FROM RBL 9 IN TO RBL 46 INCHES.