What was found
DURING CHECK-C MAINT FOUND MEMBRANE AT STA 240, RBL 46 IN, WAS CRACKED. NEW MEMBRANE FABRICATED IN SHOP PER INTER SHOP WORK TICKET 837502 AND DRAWING 9930538. INSTALLED MEMBRANE PER SPM 6-70-01 PAGE 3 ITEM 4B, AND DRAWING 9930538. CORROSION TREATED PER SRM 51-10-3.