What was found
DURING CHECK-C MAINT FOUND CABIN FLOOR SUPPORT CORRODED AT STA 200, RBL 52 INCHES. FABRICATED NEW FLOOR SUPPORT PER SPM 6-70-01 PAGE 2, 4, A(1) AND DRAWING 9936531. CORROSION TREATED PART PER SRM 51-10-3. INSTALLED FLOOR SUPPORT PER SPM 6-70-01 PAGE 3 AND DRAWING 9936534 AND SRM 51-30-02. SEALED SUPPORT PER SRM 51-20-0.