What was found
LIGHTNING STRIKE DAMAGE TO LT TOP AFT SURFACE OF LT ELEVATOR. LIGHTNING STRIKE DAMAGE REPAIRED IAW B717 SRM 51-70-13 REPAIR 1. CALCULATED WEIGHT AND BALANCE MOMENT CHANGE IS 0.336 IN LBS PER SRM 51-60-02 NO CHANGE TO DATA TAG REQUIRED WITHIN LIMITS AT -695.5 IN LBSLTW WATCH REQUIRED FOR VISUAL INSPECTION EVERY 3000 CYCLES FOR DAMAGE TOLERANCE MAINTENANCE REQUIREMENTS AREA PRIMED AND PAINTED AS REQUIRED. OK FOR SERVICE.