Text
From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '355c60b0bb67155dbaa483d97bd0e23298c879133a5e09f023dd2a42e93879bf' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '355c60b0bb67155dbaa483d97bd0e23298c879133a5e09f023dd2a42e93879bf' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
BD500-282001
2019-06-06 Page 1
Service Bulletin Fuel - Distribution - Inspection of Engine Fuel Feed Tubes BD500-282001 Issue No. 004 Copyright © 2019 Airbus Canada Limited Partnership All rights reserved. No part of this work may be reproduced or copied in any form or by any means without written permission of Airbus Canada Limited Partnership.
The Airbus and A220 logos are registered trademarks of Airbus Canada Limited Partnership.
The information, technical data and the designs disclosed herein are the exclusive property of Airbus Canada Limited Partnership or contain proprietary rights of others and are not to be used or disclosed to others without the written consent of Airbus Canada Limited Partnership. The recipient of this document, by its retention and use, agrees to hold in confidence the technical data and designs contained herein. The foregoing shall not apply to persons having proprietary rights to such information, technical data or such designs to the extent that such rights exist.
Manufacturer:
Airbus Canada Limited Partnership Customer Services 13100 Henri-Fabre Blvd., Mirabel, Quebec Canada J7N 3C6 2018-12-17 Issue 004
BD500-282001
Intentionally left blank
2019-06-06 Page 2 2018-12-17 Issue 004
BD500-282001
2019-06-06 Page 1 Table of contents The listed documents are included in Issue 004, dated 2019-06-06, of this publication.
Document title Data module code Issue date Applicable to Fuel - Distribution - Inspection of Engine Fuel Feed Tubes - Service Bulletin BD500-A-J28-20-01-00AAA-930A-A 2019-06-06 50001-54999, 55001-59999 Inspection of Engine Fuel Feed Tubes - Material information BD500-A-J28-20-01-01AAA-934A-A 2019-06-06 50001-54999, 55001-59999 PART A - Inspection of Engine Fuel Feed Tubes (Left Side) - Accomplishment instruction BD500-A-J28-20-01-01AAA-933A-A 2019-06-06 50001-54999, 55001-59999 PART B - Inspection of Engine Fuel Feed Tubes (Right Side) - Accomplishment instruction BD500-A-J28-20-01-02AAA-933A-A 2019-06-06 50001-54999, 55001-59999 PART C - Repeat Inspection of Engine Fuel Feed Tubes (Left Side) - Accomplishment instruction BD500-A-J28-20-01-03AAA-933A-A 2019-06-06 50001-54999, 55001-59999 PART D - Repeat Inspection of Engine Fuel Feed Tubes (Right Side) - Accomplishment instruction BD500-A-J28-20-01-04AAA-933A-A 2019-06-06 50001-54999, 55001-59999 2018-12-17 Issue 004
BD500-282001
Intentionally left blank
2019-06-06 Page 2 2018-12-17 Issue 004
BD500-282001
See applicability on the first page of the DM BD500-A-J28-20-01-00AAA-930A-A BD500-A-J28-20-01-00AAA-930A-A 2019-06-06 Page 1 Fuel - Distribution - Inspection of Engine Fuel Feed Tubes - Service Bulletin
Applicability: 50001-54999, 55001-59999
Table of contents Page
Fuel - Distribution - Inspection of Engine Fuel Feed Tubes - Service Bulletin1
References1
Service Bulletin1
Common information1
1 Maintenance Publications8
2 Operational Publications8
List of tables Page
1 References1
References Table 1 References Data Module/Technical Publication Title BD500-A-J28-20-01-01AAA-934A-A Inspection of Engine Fuel Feed Tubes - Material information BD500-A-J28-20-01-01AAA-933A-A PART A - Inspection of Engine Fuel Feed Tubes (Left Side) - Accomplishment instruction BD500-A-J28-20-01-02AAA-933A-A PART B - Inspection of Engine Fuel Feed Tubes (Right Side) - Accomplishment instruction BD500-A-J28-20-01-03AAA-933A-A PART C - Repeat Inspection of Engine Fuel Feed Tubes (Left Side) - Accomplishment instruction BD500-A-J28-20-01-04AAA-933A-A PART D - Repeat Inspection of Engine Fuel Feed Tubes (Right Side) - Accomplishment instruction Service Bulletin Common information THIS SERVICE BULLETIN IS SENT TO EACH OPERATOR. IF THE OPERATOR HAS LEASED AIRCRAFT, SEND THE SERVICE BULLETIN TO THE LESSEE. IF THE OPERATOR
HAS SOLD AIRCRAFT OR TRANSFERRED SPARES IN THE LAST SIX MONTHS, SEND
THIS SERVICE BULLETIN TO THE NEW OWNER, UNLESS CONFIRMATION WAS
RECEIVED THAT BOMBARDIER COMMERCIAL AIRCRAFT HAS INCLUDED THE NEW OPERATOR ON THE DISTRIBUTION LIST.
2018-12-17 Issue 004
BD500-282001
See applicability on the first page of the DM BD500-A-J28-20-01-00AAA-930A-A BD500-A-J28-20-01-00AAA-930A-A 2019-06-06 Page 2 Management information Compliance category: Recommended (Service bulletin recommended to be accomplished to prevent significant operational disruptions) Task category: Inspection and repair Original issue date: 2018-12-17 Impact list Impact (Weight and balance):
Refer to the Weight and balance section of the Planning information section.
Accomplishment limits Time compliance: Repetitive interval Remarks:
Refer to the Compliance section of the Planning Information section.
Replacement service bulletin None Revision information Revision information The revision information letter transmits:
Issue 004 of Service Bulletin BD500-282001, dated 2019-06-06.
Additional work The changes in this revision have no effect on aircraft that have incorporated a previous issue of this service bulletin.
Revision reason Revise the Service Bulletin Referenced Documentation to:
Update the RSI C-500-000-28-0009 to Revision F Revised Accomplishment instructions:
To change the maximum wear tolerance in some steps in PART A, PART B, PART C and PART D.
To change the maximum wear tolerance in an illustration in PART A, PART B, PART C and PART D.
This revision also includes small editorial changes that do not have an effect on the technical content.
Revision history Issue 001, dated 2018-12-17 Issue 002, dated 2019-02-13 Issue 003, dated 2019-03-08 2018-12-17 Issue 004
BD500-282001
See applicability on the first page of the DM BD500-A-J28-20-01-00AAA-930A-A BD500-A-J28-20-01-00AAA-930A-A 2019-06-06 Page 3 Revision sequence Discard the copy of Service Bulletin BD500-282001, Issue 003, dated 2019-03-08. Replace with the copy attached.
Summary Applicability BD-500-1A10, Aircraft 50001 thru 54999 BD-500-1A11, Aircraft 55001 thru 59999 Reason It is possible that wear can occur on the fuel feed tubes (written as fuel tube(s)) in the areas where the bonding clamps are installed and at the fuel tube connections. The wear on the fuel feed tubes can cause possible fuel leaks.
Description This Service Bulletin is divided in four parts, PART A, PART B, PART C and PART D.
PART A − Inspection of the fuel tubes (left side) The aircraft is defueled and put in standard configuration for maintenance. The electrical power is removed from the aircraft. The access panels are removed. The fuel fumes are removed from the fuel tanks. The fuel tubes are removed and a visual inspection of the fuel tubes for damage is done. If necessary some saddle clamps are replaced. The fuel tubes are installed. The access panels are installed. The electrical power is applied and a return to service test is done.
PART B − Inspection of the fuel tubes (right side) The aircraft is defueled and put in standard configuration for maintenance. The electrical power is removed from the aircraft. The access panels are removed. The fuel fumes are removed from the fuel tanks. The fuel tubes are removed and a visual inspection of the fuel tubes for damage is done. If necessary some saddle clamps are replaced. The fuel tubes are installed. The access panels are installed. The electrical power is applied and a return to service test is done.
PART C − Repeat Inspection of the fuel tubes (left side) The aircraft is defueled and put in standard configuration for maintenance. The electrical power is removed from the aircraft. The access panels are removed. The fuel fumes are removed from the fuel tanks. The fuel tubes are removed and a visual inspection of the fuel tubes for damage is done. The fuel tubes are installed. The access panels are installed. The electrical power is applied and a return to service test is done.
PART D − Repeat Inspection of the fuel tubes (right side) The aircraft is defueled and put in standard configuration for maintenance. The electrical power is removed from the aircraft. The access panels are removed. The fuel fumes are removed from the fuel tanks. The fuel tubes are removed and a visual inspection of the fuel tubes for damage is done. The fuel tubes are installed. The access panels are installed. The electrical power is applied and a return to service test is done.
Concurrent requirements None 2018-12-17 Issue 004
BD500-282001
See applicability on the first page of the DM BD500-A-J28-20-01-00AAA-930A-A BD500-A-J28-20-01-00AAA-930A-A 2019-06-06 Page 4 Manpower It will take an estimated 34.0 h to complete PART A of this service bulletin.
It will take an estimated 34.0 h to complete PART B of this service bulletin.
It will take an estimated 34.0 h to complete PART C of this service bulletin.
It will take an estimated 34.0 h to complete PART D of this service bulletin.
Material information Refer to BD500-A-J28-20-01-01AAA-934A-A.
Planning information Applicability Aircraft affected:
AIRCRAFT MODEL SERVICE AIRCRAFT SERIAL NUMBER
PRODUCTION AIRCRAFT
SERIAL NUMBERS BD-500-1A10 50001 thru 54999 There is no production effectivity.
BD-500-1A11 55001 thru 59999 There is no production effectivity.
Note The instructions in this service bulletin are only applicable to the systems and parts installed at the time of delivery of the aircraft or as changed by Bombardier Service Bulletins. Before you do this service bulletin, examine all Supplemental Type Certificates (STCs), Supplemental Type Approvals (STAs), or equivalent action changes to make sure that you can complete this service bulletin.
Reason Problem and effect It is possible that wear can occur on the fuel feed tubes (written as fuel tube(s)) in the areas where the bonding clamps are installed and at the fuel tube connections. The wear on the fuel feed tubes can cause possible fuel leaks.
Objective/Solution This service bulletin gives the procedure to remove and examine the fuel tubes and the related attaching hardware for damage. If damage is found, the fuel tube and its attaching hardware are to be replaced. The fuel tubes are installed and the return to service test is done.
Description This Service Bulletin is divided in four parts, PART A, PART B, PART C and PART D.
PART A − Inspection of the fuel tubes (left side) The aircraft is defueled and put in standard configuration for maintenance. The electrical power is removed from the aircraft. The access panels are removed. The fuel fumes are removed from the fuel tanks. The fuel tubes are removed and a visual inspection of the fuel tubes for damage 2018-12-17 Issue 004
BD500-282001
See applicability on the first page of the DM BD500-A-J28-20-01-00AAA-930A-A BD500-A-J28-20-01-00AAA-930A-A 2019-06-06 Page 5 is done. If necessary some saddle clamps are replaced. The fuel tubes are installed. The access panels are installed. The electrical power is applied and a return to service test is done.
PART B − Inspection of the fuel tubes (right side) The aircraft is defueled and put in standard configuration for maintenance. The electrical power is removed from the aircraft. The access panels are removed. The fuel fumes are removed from the fuel tanks. The fuel tubes are removed and a visual inspection of the fuel tubes for damage is done. If necessary some saddle clamps are replaced. The fuel tubes are installed. The access panels are installed. The electrical power is applied and a return to service test is done.
PART C − Repeat Inspection of the fuel tubes (left side) The aircraft is defueled and put in standard configuration for maintenance. The electrical power is removed from the aircraft. The access panels are removed. The fuel fumes are removed from the fuel tanks. The fuel tubes are removed and a visual inspection of the fuel tubes for damage is done. The fuel tubes are installed. The access panels are installed. The electrical power is applied and a return to service test is done.
PART D − Repeat Inspection of the fuel tubes (Right side) The aircraft is defueled and put in standard configuration for maintenance. The electrical power is removed from the aircraft. The access panels are removed. The fuel fumes are removed from the fuel tanks. The fuel tubes are removed and a visual inspection of the fuel tubes for damage is done. The fuel tubes are installed. The access panels are installed. The electrical power is applied and a return to service test is done.
Compliance Recommended Service Bulletin Bombardier recommends that PART A and PART B of this service bulletin be done at no more than 1800 flight hours from the release date on this service bulletin, and PART C and PART D be repeated at intervals of 1800 flight hours, unless otherwise directed by the airworthiness authority of the operator.
Note The PART A and PART B are to be done at the same time and the PART C and PART D are to be done at the same time.
Note If it is not possible to complete all the instructions in this service bulletin because of the configuration of the aircraft, speak with a representative of Bombardier in the CRC at 1-844-272-2720 (1-844-CRC-CRC0) or 1-514-855-8500 or e-mail at crc_cseries@aero.bombardier.com for analysis and to get an approved disposition to complete this service bulletin.
Note This service bulletin does not affect Airworthiness Limitations Items (ALIs) or Damage Tolerance Inspections (DTIs).
Concurrent requirements None 2018-12-17 Issue 004
BD500-282001
See applicability on the first page of the DM BD500-A-J28-20-01-00AAA-930A-A BD500-A-J28-20-01-00AAA-930A-A 2019-06-06 Page 6 Approval The technical content of this service bulletin has been approved under the authority of the TC- CA Design Approval Organization No: DAO #93-Q-02.
Manpower The man-hours given below are estimates for direct labor done by an experienced crew on an aircraft prepared for maintenance.
These estimates do not include the time necessary for:
- Administrative functions such as planning, liaising, familiarization, and report writing.
- Non-productive elapsed time such as rest time, having meals, and crew shift changes.
- Elapsed time such as for paint to dry, sealant to cure, and fuel tank venting.
- Preparation for modification (unless specified in the Accomplishment Instructions) such as cleaning and getting parts, tools, consumables, and ground equipment.
- Quality assurance inspections, troubleshooting and/or correction of discrepancies found when a task is done.
- All other activities that are not considered by Bombardier as directly related to the accomplishment of this procedure.
It will take an estimated 34.0 h to complete PART A of this service bulletin. The man-hours are divided as shown in the table that follows:
TASK MAN-HOURS Job Set-Up 10.0 h Procedure 20.0 h Test 1.0 h Job Close-Up 3.0 h It will take an estimated 34.0 h to complete PART B of this service bulletin. The man-hours are divided as shown in the table that follows:
TASK MAN-HOURS Job Set-Up 10.0 h Procedure 20.0 h Test 1.0 h Job Close-Up 3.0 h It will take an estimated 34.0 h to complete PART C of this service bulletin. The man-hours are divided as shown in the table that follows:
TASK MAN-HOURS Job Set-Up 10.0 h 2018-12-17 Issue 004
BD500-282001
See applicability on the first page of the DM BD500-A-J28-20-01-00AAA-930A-A BD500-A-J28-20-01-00AAA-930A-A 2019-06-06 Page 7
TASK MAN-HOURS Procedure 20.0 h Test 1.0 h Job Close-Up 3.0 h It will take an estimated 34.0 h to complete PART D of this service bulletin. The man-hours are divided as shown in the table that follows:
TASK MAN-HOURS Job Set-Up 10.0 h Procedure 20.0 h Test 1.0 h Job Close-Up 3.0 h Weight and balance Applicability: 50010-50032, 55003-55053 Weight change when PART A and PART B completed WEIGHT ARM MOMENT1 + 0.35 lb 840.38 in. +0.2941 (1000 lb•in) + 0.16 kg 21.35 m +0.0034 (1000 kg•m) 1 The value in the Moment column is divided by 1000. Refer to Weight and Balance Manual.
Weight and balance For Aircraft 50001-50009, 50033-54999 and 55001, 55002 and 55054-59999 PART A and PART B and For all aircraft PART C and PART D Weight Not Changed Electrical load data Not changed Referenced documentation Refer to the SB Introduction document BD500-000000 for definition or explanation of service bulletin content.
Modification Summary 500T102557, Revision A 2018-12-17 Issue 004
BD500-282001
See applicability on the first page of the DM BD500-A-J28-20-01-00AAA-930A-A BD500-A-J28-20-01-00AAA-930A-A 2019-06-06 Page 8 For Bombardier reference only: Restriction and/or Special Instruction RSI C-500-000-28-0009, Revision F For Bombardier reference only: PCR 57512, 57293 Documentation affected 1 Maintenance Publications None 2 Operational Publications None Industry support information For on-site labor assistance, please speak with a Customer Response Centre (CRC) representative at 1-844-272-2720 (1-844-CRC-CRC0) or 1-514-855- 8500 or e-mail at crc_cseries@aero.bombardier.com.
Material information Refer to BD500-A-J28-20-01-01AAA-934A-A.
Accomplishment instructions Refer to BD500-A-J28-20-01-01AAA-933A-A.
Refer to BD500-A-J28-20-01-02AAA-933A-A.
Refer to BD500-A-J28-20-01-03AAA-933A-A.
Refer to BD500-A-J28-20-01-04AAA-933A-A.
Additional information Additional information
APPENDIX A
DATA SHEET OPERATOR NAME:
AIRCRAFT SERIAL NUMBER:
AIRCRAFT FLIGHT HOURS:
DATE (OF INSPECTION):
PART NUMBER LEFT ORRIGHT SIDE
NUMBER OF FLIGHT
CYCLES/FLIGHT
HOURS SINCE
PART INSTALLED
ON AIRCRAFT
DESCRIPTION
OF DAMAGE 2018-12-17 Issue 004