Service bulletin · Airbus Helicopters

No revision namedAirbus Helicopters SB No. EC120-53-018 Rev 0 · 29 pages · 1.3 MB

© Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2021-0887, the docket of AD 2022-02-13. Not covered by OpenAirDocs’ CC0 dedication.

Docket FAA-2021-0887 (document 0005) · AD 2022-02-13

Manufacturer
Airbus Helicopters
Type
Service Bulletin
Number
EC120-53-018

A newer revision may exist than any OpenAirDocs knows of: check with the manufacturer.

On this page

ADs that cite it · 1

Newest first, with the revision each names, as OpenAirDocs read it from the AD’s text: check it against the AD.

Text · 29Partly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers. © Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2021-0887, the docket of AD 2022-02-13. Not covered by OpenAirDocs’ CC0 dedication.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = 'f8e11f80f248ad98dae2e3ac2a22bed37b0cd1930aa574423d2d81fe03726ad1'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

No. EC120-53-018

Civil version(s): B

Revision 0 2020-11-26 Page 1/29 This document is available on the Internet: www.airbushelicopters.com/techpub/

SERVICE BULLETIN

CORRECTIVE MEASURE

FUSELAGE - Rear Fuselage Repair at the tail boom VHF attachment

Revision No. Date of issue Revision 0 2020-11-26

Summary:

The purpose of this Service Bulletin is to repair the tail boom due to corrosion and/or cracks at the VHF (Very High Frequency) antenna attachments.

Compliance:

Airbus Helicopters recommends compliance with this Service Bulletin.

SB EC120-53-018

For the attention of

No. EC120-53-018 Revision 0 2020-11-26 Page 2/29 This document is available on the Internet: www.airbushelicopters.com/techpub/

1. PLANNING INFORMATION

CAUTION

THIS SERVICE BULLETIN IS WRITTEN BASED ON

THE ORIGINAL HELICOPTER CONFIGURATION (AS DEFINED IN THE INDIVIDUAL INSPECTION LOG BOOK (RIC)). IT ALSO TAKES INTO

ACCOUNT ALL AIRBUS HELICOPTERS

APPROVED CONFIGURATION CHANGES MADE

AFTER DELIVERY, IF AIRBUS HELICOPTERS WAS INFORMED OF THEM. IT IS THE RESPONSIBILITY

OF THE OPERATOR TO CHECK THE

COMPATIBILITY OF ANY MODIFICATIONS WITH THE CURRENT HELICOPTER CONFIGURATION. IF

MODIFICATIONS ARE NOT COMPAT IBLE, IT IS

THE RESPONSIBILITY OF THE OPERATOR TO

DEFINE THE NECESSARY ADAPTATION WORK

AND HAVE THEM APPROVED BY THE AIR

TRANSPORT AUTHORITIES IN THE COUNTRY

CONCERNED, AND TO MAKE SURE THAT THEIR AIRWORTHINESS IS FOLLOWED UP.

1.A. EFFECTIVITY

1.A.1. Helicopters/installed equipment or parts

Helicopters EC120 all Serial Numbers.

1.A.2. Non-installed equipment or parts

Tail booms, all Part Numbers.

1.B. ASSOCIATED REQUIREMENTS

Not applicable.

No. EC120-53-018 Revision 0 2020-11-26 Page 3/29 This document is available on the Internet: www.airbushelicopters.com/techpub/

1.C. REASON

The purpose of this Service Bulletin is to repair the tail boom due to corrosion and/or cracks at the VHF (Very High Frequency) antenna attachments.

1.D. DESCRIPTION

This Service Bulletin consists in:

- removing the tail boom and the VHF antenna,

- repairing the damaged area,

- installing the tail boom and the VHF antenna.

1.E. COMPLIANCE

1.E.1. Compliance at H/C manufacturer level

Not applicable.

1.E.2. Compliance in service

Helicopters/installed equipment or parts:

The work must be performed on the helicopter by the operator.

Comply with paragraph 3. of this Service Bulletin.

Non-installed equipment or parts:

Modify stocks as required and as per paragraphs 3.B.2.b. to 3.B.2.e.

1.F. APPROVAL

Approval of modifications:

The information or instructions relate to modification A08023 Revision 2, which was approved on November 23, 2020 under the authority of EASA Design Organization Approval No. 21J.700 for civil version helicopters subject to an Airworthiness Certificate.

Approval of this document:

The technical information contained in this Service Bulletin Revision 0 was approved on November 25, 2020 under the authority of EASA Design Organization Approval No. 21J.700 for civil version helicopters subject to an Airworthiness Certificate.

No. EC120-53-018 Revision 0 2020-11-26 Page 4/29 This document is available on the Internet: www.airbushelicopters.com/techpub/

1.G. MANPOWER

For compliance with this Service Bulletin, Airbus Helicopters recommends the following staff qualification:

Qualifications: - 2 Airframe Sructure Technicians,

- 1 Electrical Technician.

The Estimated Man-hours are indicated for reference purposes only and based on a standard helicopter configuration.

Estimated Man-hours: - 12 hours for the Airframe Technicians (excluding curing time),

- 3 hours for the Electrical Technician.

Estimated helicopter downtime is indicated for reference purposes only, based on a standard helicopter configuration.

Helicopter downtime is estimated at two days (excluding curing time).

1.H. WEIGHT AND BALANCE

There is no change in weight and moment.

1.I. POWER CONSUMPTION

Not applicable.

1.J. SOFTWARE UPGRADES/UPDATES

Not applicable.

1.K. REFERENCES

The following documents are required for compliance with this Service Bulletin.

Standard Practices Manual MTC: 20-02-05-404: Assembly by screws and nuts - Joining MTC: 20-02-07-401: Electrical bonding procedure - Electrical bonding MTC: 20-02-07-407: Use of conductive paste CHO-LUB E117 - Electrical bonding MTC: 20-02-08-406: Replacement and installation of inserts in honeycomb panels - Replacement of components on structure and mechanical assemblies MTC: 20-03-02-405: Installation of blind bolts ASN-A 0026 - ASN-A 0027 and 0363 - General rivet replacement principles MTC: 20-03-06-401: Repair of sandwich structures - Structural repairs MTC: 20-03-06-406: Structural repairs: Vacuum bag techniques - Structural repairs MTC: 20-03-06-407: Repairs of metal structures - Structural repairs MTC: 20-04-01-102: Use of cleaning products on individual parts and on aircraft - Cleaning MTC: 20-04-04-401: Preparation of surfaces before painting - Surface treatment before painting MTC: 20-04-04-403: Touch-up of the Alodine 1200 protection (Bonderite M-Cr 1200) - Surface treatment before painting

No. EC120-53-018 Revision 0 2020-11-26 Page 5/29 This document is available on the Internet: www.airbushelicopters.com/techpub/

MTC: 20-04-05-402: Application of Primer EPOXY P05-P20 - Paint and primer application procedure MTC: 20-04-05-420: Use of Surfacer CA 8620 - Paint and primer application procedure MTC: 20-04-05-434: Application of metal primer scheme P50 - Paint and primer application procedure MTC: 20-05-01-222: Application of PR 1771 B2 sealant - General sealing procedures MTC: 20-05-01-223: Use of Sealing compounds sealing 1776 B2 / 1776 S - General sealing procedures MTC: 20-05-01-401: Use of THIXOFLEX and SLG products - General sealing procedures MTC: 20-06-01-101: General rules for bonding with adhesives - Bonding with adhesives MTC: 20-06-01-410: Application of MSW-3B or RTV 732 adhesive CM 674 - Bonding with adhesives MTC: 20-06-01-425: Application of EA 9392 Resin - Bonding with adhesives MTC: 20-06-04-305: Application of mixtures No. 16 and 17 - Use of bonding mixtures MTC: 20-07-03-406: Instructions applicable when working on an aircraft electrical circuit and power generating systems - Technical instructions.

MTC: 20-07-03-408: Appearance checks on an aircraft after an inspection or repair - Technical instructions.

MTC: 20-60-00-432: Audio control procedure by blade tapping - Blade standard practices

Aircraft Maintenance Manual AMM: 20-10-00,3-14: Method for application of sealants - Airframe AMM: 20-10-00,3-15: Bonding with adhesives - Airframe, AMM: 20-10-00,3-33: General riveting acceptance requirements - Airframe AMM: 20-10-00,3-34: Protection of electrical wiring during maintenance, repair or modification - Airframe AMM: 20-10-00,3-43: Monitoring of Equipment in Service, Marking and Specific Version Identification – Airframe AMM: 20-20-00,3-1: Standard Practices - Structure AMM: 20-20-00,4-2: Installation of rivets - Pitch and edge distance - Airframe AMM: 20-20-00,8-3: Repair of "Sandwich" structures - Airframe AMM: 20-20-00,8-4: Replacement and fitting of inserts in honeycomb panels - Airframe AMM: 23-13-02,4-1: Removal / Installation - Antenna on Tail Boom AMM: 23-13-02,5-1: Functional Tests - KY 196A VHF/AM System AMM: 53-00-00,3-1: General safety instructions - Fuselage AMM: 53-50-00,4-1: Removal / Installation - Aft fuselage

Information Notice IN: 3447-I-00: Introduction of the digital Service Bulletin reporting service R-TEX

No. EC120-53-018 Revision 0 2020-11-26 Page 6/29 This document is available on the Internet: www.airbushelicopters.com/techpub/

1.L. OTHER AFFECTED PUBLICATIONS

CAUTION

TO COMPLY WITH THIS SERVICE BULLETIN, THE

OPERATOR MUST MAKE SURE THAT ALL THE

MAINTENANCE DOCUMENTS REQUIRED FOR THE

MAINTENANCE OF THIS INSTALLATION ARE AVAILABLE. IF NOT, IT IS THE OPERATOR'S

RESPONSIBILITY TO OBTAIN THE DOCUMENTS

FROM THE USUAL AIRBUS HELICOPTERS CONTACT.

The modification will be integrated into the following manual:

Aircraft Maintenance Manual (AMM).

The AMM will be updated during a future revision.

1.M. PART INTERCHANGEABILITY OR MIXABILITY

Not applicable.

No. EC120-53-018 Revision 0 2020-11-26 Page 7/29 This document is available on the Internet: www.airbushelicopters.com/techpub/

2. EQUIPMENT OR PARTS INFORMATION

2.A. EQUIPMENT OR PARTS: PRICE - AVAILABILITY - PROCUREMENT

Price

For any information on the price of modification kits and/or components or for assistance, contact the Airbus Helicopters Network Sales and Customer Relations Department.

Availability

Delivery lead times will be indicated by the Sales and Customer Relations Department on the operator's request.

Procurement

Order the required quantity from the Airbus Helicopters Network Sales and Customer Relations Department:

Airbus Helicopters Etablissement de Marignane Direction des Ventes et Relation Client 13725 MARIGNANE CEDEX FRANCE

NOTE 1

On the purchase order, please specify the mode of transport, the destination and the serial numbers of the helicopters to modify.

2.B. LOGISTIC INFORMATION

The work can be performed by Airbus Helicopters Technicians on request. For any information, contact the Customer Support Sales Department.

No. EC120-53-018 Revision 0 2020-11-26 Page 8/29 This document is available on the Internet: www.airbushelicopters.com/techpub/

2.C. EQUIPMENT OR PARTS REQUIRED PER HELICOPTER/COMPONENT

Components to be ordered for one helicopter or one assembly:

Key Word Qty New P/N Item Old P/N → Instruction

External doubler

1 C008P0825201 1 Create the part

Internal doubler

1 C008P0825202 2 Create the part

Honeycomb plug

1 C008P0825203 3 Create the part

Bonding plate

4 C008P0825204 4 Create the part Insert 3 DHS443-152.21 5 Rivet 50 ASNA0363T0401 6 Screw 3 22256BC050012L 7 22256BC0500xxx Discard

NOTE 2

The e xternal doubler (1), internal doubler (2), and bonding plates (4) must be created using aluminum sheet 2024 (P/N: ASNA3010-8536) and as per the dimensions given in the corresponding Figures 1, 2 and 4.

The parts shown in these figures are not to scale.

NOTE 3

The honeycomb plug (3) must be creat ed using honeycomb (P/N: DHS251-142.12) and as per the dimensions and orientation given in the corresponding Figure 3.

The part shown in this figure is not to scale.

Equipment or parts to be ordered separately:

Key Word Qty New P/N Item Old P/N → Instruction

Aluminum sheet 1 m² ASNA3010-8536 8 Honeycomb 0.5 m² DHS251-142.12 9

No. EC120-53-018 Revision 0 2020-11-26 Page 9/29 This document is available on the Internet: www.airbushelicopters.com/techpub/

Consumables to be ordered separately:

As per Work Cards and Tasks indicated in this Service Bulletin and the list below:

Key Word Qty P/N CM Item Fiberglass AR ECS0030-27 7246 10 Adhesive AR ECS0010.10 616 11 Hollow filler AR BJO-0930 7931 12 Sealing compound AR ECS2068.10 6240 13 Adhesive AR ECS2055.10 6951 14 Conductive past AR ECS2241.20 132 15 Chemical conversion material AR ECS2338.10 316 16 Sealing compound AR ECS2253.10 6267 17 Sealing compound AR ECS2339.60 6068 18 Sealing mix AR Mixture No. 17 (11) + (12) / 19 Edging mix AR Mixture No. 16 (11) + (12) / 20

The consumables can be ordered separately from the following companies:

Aviatec global aviation Website: www.aviatec.net/.

Telephone: +33 1.34.46.45.24 or +49 4193.8803.630 Fax: +33 1.34.46.45.26 or +49 4193.8803.699 AOG: +49 4193.8803.660 AOG email: aog@aviatec.aero Gaches chimie Website: www.gaches.com Telephone: +33 5.61.31.64.45 Fax: +33 5.61.40.98.63 AOG email: marketplace@gaches.com BDSI Website : www.boeingdistribution.com Telephone: +1.305.925.2600 Fax: +1.305.507.7191 AOG: +1.305.471.8888 AOG email: AOGdesk@Boeingdistribution.com

Special tools:

As per Work Cards and Tasks mentioned in this Service Bulletin and the list below:

Key Word Qty Tool P/N or equivalent Item

Oven 1 Commercial zz Infrared lamp 1 Commercial yy Drill bit 1 Commercial xx

2.D. EQUIPMENT OR PARTS TO BE RETURNED

Not applicable.

No. EC120-53-018 Revision 0 2020-11-26 Page 10/29 This document is available on the Internet: www.airbushelicopters.com/techpub/

3. ACCOMPLISHMENT INSTRUCTIONS

3.A. GENERAL

- As per MTC Work Card 20-02-05-404, read and comply with the instructions for the assembly by screws and nuts.

- As per MTC Work Card 20-03-06-401, read and comply with the instructions for the repair of sandwich structures.

- As per MTC Work Card 20-04-01-102, read and comply with the instructions for the use of cleaning products on individual parts and on aircraft.

- As per MTC Work Card 20-06-01-425, read and comply with the instructions for the application of EA 9392 Resin.

- As per AMM Task 20-10-00,3-14, read and comply with the instructions on the method for application of sealants.

- As per AMM Task 20-10-00,3-15, read and comply with the instructions for bonding with adhesives.

- As per AMM Task 20-10-00,3-33, read and comply with the instructions on the general riveting acceptance requirements.

- As per AMM Task 20-10-00,3-34, read and comply with the instructions for the protection of electrical wiring during maintenance, repair or modification.

- As per AMM Task 20-20-00,3-1, read and comply with the instructions on standard practices.

- As per AMM Task 20-20-00,4-2, read and comply with the instructions for the installation of rivets.

- As per AMM Task 20-20-00,8-3, read and comply with the instructions for the repair of "Sandwich" structures.

- As per AMM Task 20-20-00,8-4, read and comply with the instructions for the replacement and installation of inserts in honeycomb panels.

- As per AMM Task 53-00-00,3-1, read and comply with the general safety instructions.

3.B. WORK STEPS

3.B.1. Preliminary steps

- Disconnect all the electrical power supplies as per Work Card 20-07-03-406 (MTC).

- Install the access equipment.

- Remove and/or open all cowlings, panels, doors and all equipment items to enable appropriate access to the various work areas.

3.B.2. Procedure

3.B.2.a. Removal of the tail boom

Remove the tail boom (a) as per Task 53-50-00,4-1 (AMM).

No. EC120-53-018 Revision 0 2020-11-26 Page 11/29 This document is available on the Internet: www.airbushelicopters.com/techpub/

3.B.2.b. Marking of the repair area(s) (Figure 6 and Figure 8)

- If necessary, remove the VHF antenna (c) as per Task 23-13-02,4-1 (AMM).

- Discard the three attachment screws (d) (not shown) of the VHF antenna (c) (Figure 7).

- Mark the internal and external limits of the repair areas.

- Mark the center and insert hole positions (D), on external repair area, in order to locate properly external doubler (Figure 6, Detail C).

3.B.2.c. Preparation of the area(s) (Figure 5, Section D-D)

CAUTION

DO NOT DAMAGE THE EXTERNAL SKIN AND INTERNAL SKIN.

CAUTION

DO NOT U SE AUTOMATIC TOOLS , SANDING BY HAND IS MANDATORY . BE CAREFUL TIME BEFORE BONDING IS 8 HOURS MAXIMUM.

- Sand the external then, the internal limit of the repair areas as per Work Card 20-04-04-401 (MTC).

NOTE 1

On the internal limit of the repair area only:

it is permitted to leave remaining protection up to 25% of the maximum surface (to avoid removing from the internal skin) as per photo below.

No. EC120-53-018 Revision 0 2020-11-26 Page 12/29 This document is available on the Internet: www.airbushelicopters.com/techpub/

- From the outside of the tail boom (a), cut a circle (A) in the external skin with its center located in the center point between the inserts (b) and perpendicular to the curve of the tail boom (a) as per Figure 5, Section D-D.

- Remove the disc (g) from the tail boom (a).

- From the inside of the tail boom (a), cut a circle (B) in the internal skin and the honeycomb without cutting the external skin as per Figure 5, Section D-D.

- Remove the disc (h), the inserts (b) and the honeycomb from the tail boom (a).

- Deburr the sharp edges of the internal skin and external skin of the tail boom (a) as per Work Card 20-04-04-401 (MTC).

- Clean the areas.

3.B.2.d. Creation of the doublers, the bonding plates and the honeycomb plug (Figures 1, 2, 3, 4 and 6)

NOTE 2

The external doubler (1), internal doubler (2), and bonding plates (4) must be created using aluminum sheet 2024 (P/N: ASNA3010-8536) and as per the dimensions given in the corresponding Figures 1, 2 and 4.

The parts shown in these figures are not to scale.

NOTE 3

The honeycomb plug (3) must be created using honeycomb (P/N: DHS251 -142.12) and as per the dimensions and orientation given in the corresponding Figure 3.

The part shown in this figure is not to scale.

- Create the external doubler (1) using aluminum sheet (8) as per Figure 1:

. manually shape the external doubler (1), . position the external doubler (1) on the external skin of the tail boom (a) using marks made previously with paragraph 3.B.2.b., . counter drill the rivets holes (C) to a diameter of 2.6 mm (.102 in) on the tail boom (a).

. deburr the sharp edges of the external doubler (1) as per Work Card 20-04-04-401 (MTC).

. deburr the rivet holes (C) on the tail boom (a) and the external doubler (1) as per Work Card 20-04-04-401 (MTC).

- Create the internal doubler (2) using aluminum sheet (8) as per Figure 2:

. manually shape the internal doubler (2), . deburr the sharp edges of the internal doubler (2) as per Work Card 20-04-04-401 (MTC).

- Create the bonding plates (4) using aluminum sheet (8) as per Figure 4.

- Position the bonding plates (4) on the external doubler (1) and on the tail boom (a) (Figure 6, Detail C).

- Mark and counter drill eight holes (C) to a diameter of 2.6 mm (.102 in) to match the bonding plates (4) and the external doubler (1).

- Create the honeycomb plug (3) with two additional cells using honeycomb (9) as per Work Card 20-03-06-407 (MTC) (Figure 3).

- Clean the tail boom (a).