Service bulletin · Eurocopter

No revision namedU.S. DOT/FAA - Eurocopter EASB EC135-21A-013 Rev 0 · 11 pages · 1.7 MB

© Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2013-0634; AD 2014-01-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Docket FAA-2013-0634 (document 0004) · AD 2014-01-02

Manufacturer
Airbus Helicopters
As issued by
Eurocopter
Type
Emergency Alert Service Bulletin
Number
EC135-21A-013

A newer revision may exist than any OpenAirDocs knows of: check with the manufacturer.

On this page

ADs that cite it · 1

Newest first, with the revision each names, as OpenAirDocs read it from the AD’s text: check it against the AD.

Also cited in 1 proposed AD.

Text · 11OCR

This text is OCR from a scan. OCR can misread letters and numbers. © Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2013-0634; AD 2014-01-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '7eb72898d7a95b58cd254306fda60decbc1ebfd3c95daf0e1206f055764661e2'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Page 1OCROpen in PDF

EUROCOPTER AN EADS COMPANY ASB EC135-21A-013 Effective for version(s): T2+, P2+, 635 T2+, 635 P2+

EMERGENCY

ALERT SERVICE BULLETIN SUBJECT: AIR CONDITIONING - Mechanical air conditioning Inspection of the compressor bearing block For the attention of Revision number Issue date Revision 0 2011-06-06 Summary:

During the preflight check metallic parts have been found within the area of the air inlets of both engines. The following inspection showed that these parts were parts of the bearing cage of one of the ball bearings of the air conditioning compressor bearing block. Loose parts of the bearing cage have damaged the compressor stage of one of the two engines to such an extent that a basic overhaul was necessary. Therefore, this Alert Service Bulletin specifies an inspection of the affected ball bearing.

Compliance:

Compliance with this Alert Service Bulletin is prescribed. See Section 1.E.

Revision 0, 2011-06-06 PAGE 1 of 11 This document is available on the internet: www.eurocopter.com/techpub

Page 2OCROpen in PDF

EUROCOPTER AN EADS COMPANY ASB EC135-21A-013

1. PLANNING INFORMATION

1.A. EFFECTIVITY

1.A.1. Helicopters/installed equipment

(a) EC135/EC635, all models with mechanical air conditioning S/N 870, 872, 873, 879, 883, 884, 888, 893, 900, 905, 911, 914, 916, 917, 923, and 926.

(b) Compressor bearing block P/N L210M1872105*.

* The part number is on the place identified on Figure 1. Compressor bearing blocks L210M1872106 and L210M1872107 are not affected.

1.A.2. Non-installed equipment Not applicable

1.B. ASSOCIATED REQUIREMENTS Not applicable.

1.C. REASON During the preflight check metallic parts have been found within the area of the air inlets of both engines. The following inspection showed that these parts were parts of the bearing cage of one of the ball bearings of the air conditioning compressor bearing block. Loose parts of the bearing cage have damaged the compressor stage of one of the two engines to such an extent that a basic overhaul was necessary. Therefore, this Alert Service Bulletin specifies an inspection of the affected ball bearing.

1.D. DESCRIPTION Remove LH and RH transmission fairings. Open bearing block cover. Inspect bearing for condition. If necessary, deactivate air conditioning.

1.E. COMPLIANCE

1.E.1. Compliance at the works Not applicable.

1.E.2. Compliance in service Helicopters/installed equipment:

(a) The upper bearing must be inspected i.a.w. Section 3.B.2 within 25 th after receipt of this Alert Service Bulletin, but by June 30, 2011 at the latest.

(b) If water or corrosion is detected during the inspection i.a.w. Section 3.B.2 deactivate the air conditioning i.a.w. Section 3.B.3.

(c) If no water or corrosion is detected during the inspection i.a.w. Section 3.B.2 this inspection must be repeated every 100 fh (with a tolerance range of +/-10 fh) but after 3 months at the latest.

PAGE 2 of 11 Revision 0, 2011-06-06 This document is available on the internet: www.eurocopter.com/techpub

Page 3OCROpen in PDF

EUROCOPTER AN EADS COMPANY ASB EC135-21A-013

(d) If only condensation moisture (without formation of troplets) is detected during the inspection i.a.w. Section 3.B.2 the inspection must be repeated every 25 th (with a tolerance range of +/- 2.5 fh) but after 4 weeks at the latest.

Non-installed equipment:

Not applicable.

1.F. APPROVAL Approval of this document:

The technical content of this document is approved under the authority of DOA No. EASA.21J.034.

1.G. MANPOWER Qualification Mechanic Electrician Pilot Others Time for Section 3.B.2 approx. 4 h oh Oh Oh Time for Section approx. 6 h Oh Oh oh

3.B.3

1.H. WEIGHT AND BALANCE Not applicable.

1.I. EFFECT ON ELECTRICAL LOADS Not applicable.

1.J. SOFTWARE MODIFICATION EMBODIMENT RECORD Not applicable.

1.K. REFERENCES Not applicable.

1.L. OTHER DOCUMENTS AFFECTED AMM EC135 and AMM EC135/635.

1.M. INTERCHANGEABILITY OR MIXABILITY OF PARTS Interchangeability:

Not applicable.

Mixability:

Not applicable.

Revision 0, 2011-06-06 PAGE 3 of 11 This document is available on the internet: www.eurocopter.com/techpub

Page 4OCROpen in PDF

EUROCOPTER AN EADS COMPANY ASB EC135-21A-013

2. MATERIAL INFORMATION

2.A. MATERIAL: PRICE - AVAILABILITY - PROCUREMENT Not applicable.

2.B. INFORMATION CONCERNING INDUSTRIAL SUPPORT Not applicable.

2.C. MATERIAL REQUIRED FOR EACH HELICOPTER/COMPONENT Kits or components to be ordered for one helicopter or one assembly:

Material kit SB-135-21A-013-2C.

No. Keyword Qty New P/N Old P/N Remark 1 O-ring 1 0634313273 0634313273 2 Hexagon nut 6 LN9338-06 LN9338-06 Consumable material to be ordered separately:

Consumable materials must be separately ordered at the INTERTURBINE AVIATION LOGISTICS company. The given CM-numbers are i.a.w. the AMM List of Consumable Materials.

Website: http://www.interturbine.com Tel.: +49.41.91.809.300 AOG: +49.41.91.809.444 No. Keyword Qty Material Remark part number Acetone FED O-A-51 203 1 a.n.* TL 6810-003 2 Lockwire, Ø 0.63 mm a.n.* LN9424-1.4546.9-0,63 775 Corrosion preventive paste ECD CODE 62888 / 54456 518 MIL-PRF-8116

a.n.* WL 5.7070.0 CMS N4911651774 LN9368-5903 Sealing compound WL 5.5905.2 6050

a.n.* ECD CODE 810421 CMS N4915080001 5 Sealing compound a.n.* ECD CODE 658971 6056 WL 5.5904.2 *a.n. = as needed

2.D. MATERIAL TO BE RETURNED Not applicable.

PAGE 4 of 11 Revision 0, 2011-06-06 This document is available on the internet: www.eurocopter.com/techpub

Page 5OCROpen in PDF

EUROCOPTER AN EADS COMPANY ASB EC135-21A-013

3. ACCOMPLISHMENT INSTRUCTIONS

3.A. GENERAL INFORMATION Not applicable.

3.B. OPERATIONAL PROCEDURE

3.B.1. Preliminary steps:

(a) Remove the LH and RH transmission fairing i.a.w. AMM, 71-11-00, 4-4.

3.B.2. Inspect bearing:

NOTE On helicopters with sand filter the rotor mast seal must be removed previously.

(a) Remove lockwire (1, Figure 2).

(b) Remove screws (2) and washers (3).

(c) Remove cover (4).

(d) Accomplish a visual inspection of the bearing and the bearing housing 1 for humidity and corrosion.

(e) If signs of water or corrosion are detected, proceed i.a.w. Section 3.B.3.

NOTE If necessary, use a flashlight.

(f) If no signs of water or corrosion are detected, proceed as follows:

Clean sealing surface /2 on the cover (4) and on the compressor bearing block using a lint-tree cloth and acetone (CM 203).

Leave cleaned areas to air for approx. 10 minutes.

Apply sealing compound (CM 6056) and fit cover (4).

Apply corrosion preventive paste (CM 518) onto screws (2) and secure cover (4) using screws (2) and washers (3). Tightening torque of the screws: 4-5 Nm.

Safety screws (2) with lockwire (CM 775) i.a.w. Figure 2.

3.B.3. Deactivate air conditioning:

NOTE On helicopters with sand filter the rotor mast seal must be removed previously.

Remove the screw (2, Figure 3) installed on the LH aft side, as seen into forward flight direction, together with washers (3), nut (6) and the bracket (4) of the brake line (5).

(b) Remove the screw (12) installed on the RH aft side, as seen into forward flight direction, together with washers (3, 14), nut (6) and grounding strip (13).

Revision 0, 2011-06-06 PAGE 5 of 11 This document is available on the internet: www.eurocopter.com/techpub

Page 6OCROpen in PDF

EUROCOPTER AN EADS COMPANY ASB EC135-21A-013

(c) Remove the nuts (6) together with washers (3) from the LH and RH aft threaded bolt.

(d) Remove the nut (6) installed on the RH forward side, as seen into forward flight direction, together with the washer (3) from the threaded bolt.

(e) Remove the screw (6) installed on the LH forward side, as seen into forward flight direction, together with washer (3) and the bracket 10) of the brake line (5) from the LA forward threaded bolt.

(†) Discard all removed 6 nuts (6).

(g) Set brake line (5) aside.

CAUTION IF THE COMPRESSOR BEARING BLOCK (1) TILTS, THE CONNECTING SHAFT (9) MIGHT GET DAMAGED. CAREFULLY LOOSEN THE COMPRESSOR BEARING BLOCK (1)!

(n) The bearing block is installed with sealing compound. If necessary, detach the compressor bearing block (1) from the flange (7) on the main transmission using plastic wedges and with slight hammer strokes.

Lift the compressor bearing block (1) and keep it at a certain distance towards the main transmission using tensioning straps.

i) Remove connecting shaft (9).

(k) Remove the O-ring (8) on the lower side of the compressor bearing block (1) from the centering seat and discard.

(1) Apply lubricating oil CM 103 or lubricating oil CM 1001 onto new O-ring (8) and install it to the lower side of the compressor bearing block (1) in the groove of the O-ring on the centering seat.

(m) Clean flange (7) on the main transmission and on the compressor bearing block (1) using a lint-free cloth and acetone (CM 203).

(n) Leave cleaned area to air for approx. 10 minutes.

Evenly apply corrosion preventive paste (CM 518) onto the flange (7) of the main transmission and onto the four threaded bolts.

(p) Position the compressor bearing block (1) onto the flange (7) of the main transmission.

While doing so ensure that:

1 The four forward boreholes in the flange of the compressor bearing block (1) align with the four threaded bolts on the flange (7) of the main transmission.

2 The two aft boreholes in the flange of the compressor bearing block (1) align with the boreholes on the flange (7) of the main transmission.

(q) The previously discarded nuts (6) are replaced by 6 new nuts (6).

PAGE 6 of 11 Revision 0, 2011-06-06 This document is available on the internet: www.eurocopter.com/techpub

Page 7OCROpen in PDF

EUROCOPTER AN EADS COMPANY ASB EC135-21A-013

(r) Using nut (6) and washer (3), secure the bracket (10) on the threaded bolt installed on the LH forward side, as seen into forward flight direction.

(s) Torque-tighten nut (6) to 9 Nm - 10 Nm.

Install nut (6) and washer (3) onto the threaded bolt installed on the RH forward side, as seen into forward flight direction.

(u) Torque-tighten nut (6) to 9 Nm - 10 Nm.

(v) Install nuts (6) and washers (3) onto the two remaining threaded bolts.

(W) Torque-tighten nuts (6) to 9 Nm - 10 Nm.

(×> Using screw (2), washers (3) and nut (6), secure the bracket (4) of the brake line (5) to the borehole on the LH aft side, as seen into forward flight direction. While doing so, install the screw (2) with corrosion preventive paste (CM 518).

(y) Torque-tighten screw (2) and nut (6) to 9 Nm - 10 Nm.

(z) Using grounding strip (13), screw (12), washers (3, 14) and nut (6), prepare the grounding connection i.a.w. AMM, 20-00-00, 2-21. Install the screw (12) with corrosion preventive paste (CM 518).

(aa) Torque-tighten screw (12) and nut (6) to 9 Nm - 10 Nm.

(ab) Remove protruding corrosion preventive paste (CM 518) from flange (7) of the main transmission.

(ac) Remove protruded corrosion preventive paste (CM 518) also from the inner contour of the compressor bearing block (1).

(ad) Thoroughly clean the area around the flange (7) using a lint-free cloth and acetone (CM

203).

(ae) Leave cleaned area to air for approx. 10 minutes.

(af) Seal inner area of the compressor bearing block (1):

1 Apply CM 5003 corrosion preventive paste onto the surface of the main transmission and onto the inner contour of the compressor bearing block (1). Leave to dry i.a.w. the manufacturer's instructions.

2 Apply CM 526 corrosion preventive paste onto the surtace of the main transmission and onto the inner contour of the compressor bearing block (1). Leave to dry i.a.w. the manufacturer's instructions.

(ag) Protect grounding connection i.a.w. AMM, 20-00-00, 2-21.

(ah) Apply a sealing compound bead (CM 6050) around the outer contour of the flange (7).

(ai) Let sealing compound dry i.a.w. the manufacturer's instructions.

(a) Immediately after accomplishment of the measures of this Alert Service Bulletin the pilots must be informed of its contents and their attention must be drawn to the fact that the air conditioning is deactivated.

Revision 0, 2011-06-06 PAGE 7 of 11 This document is available on the internet: www.eurocopter.com/techpub

Page 8OCROpen in PDF

EUROCOPTER AN EADS COMPANY ASB EC135-21A-013

3.B.4. Final steps NOTE On helicopters with sand filters the rotor mast seal must be re-installed.

(a) Install the LH and RH transmission fairing i.a.w. AMM, 71-11-00, 4-4.

3.C. IDENTIFICATION Accomplishment of this document:

Confirm accomplishment of this Alert Service Bulletin by an entry in the historical record of the helicopter.

4. APPENDIX Not applicable.

PAGE 8 of 11 Revision 0, 2011-06-06 This document is available on the internet: www.eurocopter.com/techpub

Page 9OCROpen in PDF

EUROCOPTER AN EADS COMPANY ASB EC135-21A-013 View A 1 Bearing block 18603 1$.02.10 1210м1872105 C ECO_500 Part Number on the Bearing Block Figure 1 Revision 0, 2011-06-06 PAGE 9 of 11 This document is available on the internet: www.eurocopter.com/techpub

Page 10OCROpen in PDF

EUROCOPTER AN EADS COMPANY ASB EC135-21A-013 2, 3x4 /1 Visual inspection of the bearing housing and the ball bearing for humidity and corrosion.

Sealing surface of cover 1 Lockwire (CM 775) 2 Screw 3 Washer 4 Cover Inspection of Upper Bearing Figure 2 PAGE 10 of 11 Revision 0, 2011-06-06 This document is available on the internet: www.eurocopter.com/techpub

Page 11OCROpen in PDF

EUROCOPTER AN EADS COMPANY ASB EC135-21A-013 View A 1 Compressor bearing block 2 Screw 3 Washer 4 Bracket 5 Brake line 6 Nut LN9338-06 7 Flange 8 O-ring 0634313273 9 Connecting shaft 10 Bracket 11 Not applicable 12 Screw 13 Grounding strip ViewB 14 Washer View C 6x2 - 3x2 - 10 -

- 3 13 Removal of Connecting Shaft Figure 3 Revision 0, 2011-06-06 PAGE 11 of 11 This document is available on the internet: www.eurocopter.com/techpub