Service bulletin · Eurocopter

On this page

Copies · 2

Copies of this document that the FAA filed in AD dockets on regulations.gov, newest revision first. A newer revision may exist.

No revision namedAirbus Helicopters Alert Service Bulletin EC135-53A-029 Rev 1 · 8 pages · 2.3 MB

© Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2026-0733, the docket of AD 2026-03-02. Not covered by OpenAirDocs’ CC0 dedication.

Docket FAA-2026-0733 (document 0002) · AD 2026-03-02

No revision namedEurocopter ASB EC135-53A-029 Rev 0 · 7 pages · 440 KB

© Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2014-0440; AD 2014-13-09 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Docket FAA-2014-0440 (document 0002) · AD 2014-13-09

Manufacturer
Airbus Helicopters
As issued by
Eurocopter
Type
Alert Service Bulletin
Number
EC135-53A-029

A newer revision may exist than any OpenAirDocs knows of: check with the manufacturer.

ADs that cite it · 1

Newest first, with the revision each names, as OpenAirDocs read it from the AD’s text: check it against the AD.

Text · 8OCR

No revision named, the newest copy. This text is OCR from a scan. OCR can misread letters and numbers. © Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2026-0733, the docket of AD 2026-03-02. Not covered by OpenAirDocs’ CC0 dedication.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '2d7bbc1f8e87b2d93f2dfa184dde0951d0df774bd052d0a10442f5894ba72e52'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Page 1OCROpen in PDF

AIRBUS HELICOPTERS ASB EC135-53A-029 Valid for Version(s): T1, T2, T2+, T3, P1, P2, P2+, P3, 635 T1, 635 12+, 635 P2+

ALERT SERVICE BULLETIN

PROTECTIVE MEASURE FUSELAGE - Rear Structure Visual inspection of ring frame X9227 (with blind rivet with rounded head design) between rear structure tube and Fenestron housing for cracks For the attention of Revision No. Date of issue Revision O 2013-11-19 Revision 1 2025-07-31 Summary:

In addition to the visual pre-flight check i.a.w. FLM EC135, a visual inspection of the ring frame X9227 for cracks is introduced.

Reason for Revision:

Recently, during a pre-flight check, a pilot detected a crack which ran along six rivets of the ring frame.

With Revision 1 of the ASB, the compliance time of the ASB is reduced from 50 Fh to 25 Fh (+5 Fh margin) and the procedure is updated. Additionally, it is now mandatory to accomplish SB EC135-53-030 by June 30, 2027.

Compliance:

Compliance with this Alert Service Bulletin is mandatory.

Export Control:

US Export Control - No US content. This Item does not contain any U.S. origin ITAR or EAR content.

GE Export Control - Not Listed. This Item is not listed against the EC regulations in the EU/GE Revision 1, 2025-07-31 PAGE 1 of 8 This document is available on the internet: www.airbushelicopters.com/techpub/

Page 2OCROpen in PDF

AIRBUS HELICOPTERS ASB EC135-53A-029 1 PLANNING INFORMATION

1.A EFFECTIVITY

1.A.1 Helicopters/ installed equipment

a) EC135, T1, T2, T2+, T3, P1, P2, P2+, P3, 635 T1, 635 T2+, 635 P2+, all S/N with more than 100 Fh TSN

b) Ring frame X9227 without frame reinforcement (SB EC135-53-030) (View A, Figure 1):

P/N L535H2120301 P/N L535H2120303 P/N L535H2120304 NOTE Ring frames with frame reinforcement L535H2100201 (post SB EC135-53-030) (View B, Figure 1) are not affected.

1.A.2 Non-installed equipment Not applicable.

1.B ASSOCIATED REQUIREMENTS Not applicable.

1.C REASON The rear structure tube is connected to the Fenestron housing by means of a ring frame attached by two rivet rows each. During pre-flight checks, cracks have been discovered which ran between several rivets over the ring frame.

1.D DESCRIPTION Inspect ring frame P/N L535H2120301, L535H2120303 and L535H2120304 for cracks.

PAGE 2 of 8 Revision 1, 2025-07-31 This document is available on the internet: www.airbushelicopters.com/techpub/ Export Control: US_EC_NoUScontent - GE_EC_NotListed

Page 3OCROpen in PDF

AIRBUS HELICOPTERS ASB EC135-53A-029

1.E COMPLIANCE

1.E.1 Compliance in service Helicopters/installed equipment and parts:

a) After receipt of Revision 1 of this ASB the visual inspection of ring frame X9227

i.a.w. Section 3.B must be accomplished by the maintenance personnel:

- Within 25 Fh (+5 Fh margin), but do not exceed

- 50 Fh since the last inspection i.a.w. Revision 0 of this ASB.

b) Until Service Bulletin EC135-53-030 has been accomplished, the visual inspection of the ring frame X9227 must be repeated every 25 Fh (+5 Fh margin) i.a.w.

Section 3.B

c) SB EC135-53-030 must be accomplished by June 30, 2027 at the latest.

Non-installed equipment and parts:

Not applicable.

1.F APPROVAL Approval of this document:

The technical content of this document is approved under the authority of the Design Organization Approval ref. EASA.21J.700.

1.G MANPOWER Not applicable.

1.H WEIGHT AND BALANCE Not applicable.

1.l EFFECT ON ELECTRICAL LOADS Not applicable.

1.J SOFTWARE MODIFICATION EMBODIMENT RECORD Not applicable.

1.K REFERENCES Not applicable.

1.L DOCUMENTS AFFECTED The visual pre-flight check of ring frame X9227 according to FLM EC135 remains unchanged.

1.M INTERCHANGEABILITY OR MIXABILITY OF PARTS Interchangeability:

Not applicable.

Mixability:

Not applicable.

Revision 1, 2025-07-31 PAGE 3 of 8 This document is available on the internet: www.airbushelicopters.com/techpub/ Export Control: US_EC_NoUScontent - GE_EC_NotListed

Page 4OCROpen in PDF

AIRBUS HELICOPTERS ASB EC135-53A-029

MATERIAL INFORMATION

2.A MATERIAL: PRICE - AVAILABILITY - PROCUREMENT Not applicable.

2.B INFORMATION CONCERNING INDUSTRIAL SUPPORT Not applicable.

2.C MATERIAL REQUIRED FOR EACH HELICOPTER/COMPONENT Not applicable.

2.D MATERIAL TO BE RETURNED Not applicable.

PAGE 4 of 8 Revision 1, 2025-07-31 This document is available on the internet: www.airbushelicopters.com/techpub/ Export Control: US_EC_NoUScontent - GE_EC_NotListed

Page 5OCROpen in PDF

AIRBUS HELICOPTERS ASB EC135-53A-029

ACCOMPLISHMENT INSTRUCTIONS З.А GENERAL Not applicable.

З.В WORK STEPS З.В.1 Procedure

a) Clean the transition area of the ring frame (Figure 2) (MTC 20-04-01-102).

b) Do the visual inspection for cracks on the ring frame. Ensure adequate lighting of the workplace, if necessary use a flashlight. A magnifying glass (at least x10 magnification) can be used.

NOTE The transition area ring frame/rear structure tube and Fenestron housing is sealed with a flexible sealing compound. Thus, paint cracks can form in this area (View C, Figure 2).

c) Cracks within the ring frame (3, Figure 2) and between the rivet heads are not permissible.

If cracks are detected in this area, fill the questionnaire in SB Insight with the QR-Code or the hypertext link to create a TE, refer to section 3.C.

If no cracks are detected within the ring frame (/3, Figure 2) or only paint cracks (/1, /2, Figure 2) are detected proceed with Section 3.C.

Revision 1, 2025-07-31 PAGE 5 of 8 This document is available on the internet: www.airbushelicopters.com/techpub/ Export Control: US_EC_NoUScontent - GE_EC_NotListed

Page 6OCROpen in PDF

AIRBUS HELICOPTERS ASB EC135-53A-029 VIEW A

RING FRAME WITHOUT

FRAME REINFORCEMENT FW D

• VIEW B NOT AFFECTED:

RING FRAME WITH FRAME REINFORCEMENT L535H2100201 POST SB EC135-53-030 FW D 1 Transition area ring frame/rear structure tube.

2 Transition area ring frame/Fenestron housing.

Identification of Ring Frame X9227

• Figure 1 PAGE 6 of 8 Revision 1, 2025-07-31 This document is available on the internet: www.airbushelicopters.com/techpub/ Export Control: US_EG_NoUScontent - GE_EG_NotListed

Page 7OCROpen in PDF

AIRBUS HELICOPTERS ASB EC135-53A-029 VIEW C

PAINT CRACKS AT THE

TRANSITIONS OF THE RING FRAME FW D permitted permitted Paint crack Paint crack approx. 13 cm to the end of the ring frame

(5.12 inches) approx. 4,8 cm to the beginning of the ring frame (1.9 inches)

• Transition area ring frame/rear structure tube.

• Transition area ring frame/Fenestron housing.

Cracks within the ring frame (red) are not permitted.

Visual Check of Ring Frame X9227 for Cracks Figure 2 Revision 1, 2025-07-31 PAGE 7 of 8 This document is available on the internet: www.airbushelicopters.com/techpub/ Export Control: US_EC_NoUScontent - GE_EC_NotListed

Page 8OCROpen in PDF

AIRBUS HELICOPTERS ASB EC135-53A-029 З.С COMPLIANCE CONFIRMATION Compliance with this document:

Record full compliance with this ASB, with the revision number, in the helicopter documents.

Record the full compliance with this ASB:

QR-Code or hypertext link NOTE The recording of compliance with ASBs in the SB Insight tool does not replace the recording in the helicopter documents.

ASB EC135-53A-029

3.D OPERATING AND MAINTENANCE INSTRUCTIONS Flight Manual (FLM):

Not applicable.

Aircraft Maintenance Manual (AMM):

Not applicable.

4 APPENDIX None.

PAGE 8 of 8 Revision 1, 2025-07-31 This document is available on the internet: www.airbushelicopters.com/techpub/ Export Control: US_EG_NoUScontent - GE_EG_NotListed