Service bulletin · Airbus Helicopters

Revision 2Airbus Helicopters ASB No. EC225-71A019 Rev 2 · 20 pages · 850 KB

© Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2020-0904; AD 2021-05-03 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Docket FAA-2020-0904 (document 0013) · AD 2021-05-03

Manufacturer
Airbus Helicopters
Type
Alert Service Bulletin
Number
EC225-71A019
Latest revision known
EC225-71A019, Revision 2, dated May 21, 2021

A newer revision may exist than any OpenAirDocs knows of: check with the manufacturer.

On this page

ADs that cite it · 2

Newest first, with the revision each names, as OpenAirDocs read it from the AD’s text: check it against the AD.

Also cited in 2 proposed ADs.

Text · 20OCR

This text is OCR from a scan. OCR can misread letters and numbers. © Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2020-0904; AD 2021-05-03 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '230ae0da6ff38b6a421b3ce721b2eebecd628ad0cfac0da253fb9296fd2b4adb'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Page 1OCROpen in PDF

AIRBUS HELICOPTERS No. EC225-71A019 Civil version(s): LP

ALERT SERVICE BULLETIN

PROTECTIVE MEASURE POWER PLANT - LH power plant fuel supply hose Check of the fuel supply hose of the LH power plant For the attention of Revision No. Date of issue Revision 0 2019-02-26 Revision 1 2019-02-28 Revision 2 2021-05-21 Summary:

During the power check of the LH power plant in flight, the pilot noticed an inappropriate reaction of the LH power plant.

Following investigations, it was found that the fuel supply hose of the LH power plant was twisted.

Consequently, this ALERT SERVICE BULLETIN consists in checking that the fuel supply hose of the LH power plant is not twisted.

Reason for last revision:

Airbus Helicopters introduced modification 0728745 for the installation of a new fuel supply line. With its better design and thanks to a new adjusting tool, Airbus Helicopters decreases the risk to twist the fuel supply line during installation. Because of this, revision 2 of this ALERT SERVICE BULLETIN keeps the applicability of the instructions only to helicopters that have not embodied modification 0728745.

Compliance:

Compliance with this ALERT SERVICE BULLETIN is mandatory.

Revision 0 2019-02-26 Page 1/20 Revision 2 2021-05-21 This document is available on the Internet: www.airbushelicopters.com/techpub/

Page 2OCROpen in PDF

AIRBUS HELICOPTERS No. EC225-71A019

1. PLANNING INFORMATION

1.A. EFFECTIVITY

1.A.1. Helicopters/installed equipment or parts Helicopters equipped with a fuel supply hose P/N: 704A34416087 on the LH power plant.

NOTE 1 Refer to the Individual Inspection Log Book to identify the current modification status of the helicopter.

1.A.2. Non-installed equipment or parts Fuel supply hose P/N 704A34416087 of the LH power plant.

1.B. ASSOCIATED REQUIREMENTS Not applicable.

1.C. REASON Revision 0 During the power check of the LH power plant in flight, the pilot noticed an inappropriate reaction of the LH power plant.

Following investigations, it was found that the fuel supply hose of the LH power plant was twisted.

This deformation occurred during the installation of the LH power plant, following removal/installation of the tuel supply hose.

Also, the endoscopy of the fuel supply hose showed an internal deformation which was likely to cause a reduction in fuel flow of the LH power plant.

Consequently, this ALERT SERVICE BULLETIN consists in checking for external twisting of the fuel supply hose of the LH power plant.

If the fuel supply hose is twisted, perform an endoscopy of the fuel supply hose and, if necessary, replace the fuel supply hose.

Revision 1 The purpose of revision 1 of this ALERT SERVICE BULLETIN is to clarify compliance in service for non-installed equipment or parts.

Revision 1 does not affect compliance with the previous revision of this ALERT SERVICE BULLETIN.

Revision 0 2019-02-26 Page 2/20 Revision 2 2021-05-21 This document is available on the Internet: www.airbushelicopters.com/techpub/

Page 3OCROpen in PDF

AIRBUS HELICOPTERS No. EC225-71A019 Revision 2 Airbus Helicopters introduced modification 0728745 for the installation of a new fuel supply line. With its better design and thanks to a new adjusting tool, Airbus Helicopters decreases the risk to twist the fuel supply line during installation. Because of this, revision 2 of this ALERT SERVICE BULLETIN keeps the applicability of the instructions only to helicopters that have not embodied modification 0728745.

NOTE 2 You can embody modification 0728745 through compliance with ALERT SERVICE BULLETIN No. 28A026.

Revision 2 also makes the changes that follow:

- Updates the procurement details for the purchase of consumables in paragraph 2.C.

- Adds new hyperlinks and updates the initial hyperlinks in paragraph 3. for easier navigation in the document (refer to Information Notice No. 3218-1-00).

- Adds the reference to the Information Notice No. 3643-1-00 for the digital Service Bulletin reporting service R-TEX.

- Adds identification for the fuel supply hose in Figure 9.

Revision 2 has no effect on the work (given in former revisions of this ALERT SERVICE BULLETIN) if you completed it.

1.D. DESCRIPTION This ALERT SERVICE BULLETIN consists in:

- Performing a visual inspection of the fuel supply hose of the LH power plant.

- If in doubt:

. remove the LH power plant, . remove the fuel supply hose from the LH power plant, . perform an endoscopy of the fuel supply hose, . if necessary, replace the fuel supply hose, install the fuel supply hose only on the LH power plant, . install the LH power plant.

1.E. COMPLIANCE

1.E.1. Compliance at H/C manufacturer level Not applicable.

1.E.2. Compliance in service The work must be performed on the helicopter by the operator.

Helicopters/installed equipment or parts:

- For helicopters delivered before November 30, 2018 (inclusive):

. comply with paragraph 3. within 110 flight hours or 6 months (the first limit reached is applicable) following receipt of this ALERT SERVICE BULLETIN, issued on the date indicated at the bottom of the page.

Revision 0 2019-02-26 Page 3/20 Revision 2 2021-05-21 This document is available on the Internet: www.airbushelicopters.com/techpub/

Page 4OCROpen in PDF

AIRBUS HELICOPTERS No. EC225-71A019

- For helicopters delivered after December 01, 2018 (inclusive), on which the LH power plant was removed and/or the fuel supply hose replaced before the date of issue of this ALERT SERVICE BULLETIN indicated at the bottom of the page:

• comply with paragraph 3. within 110 flight hours or 6 months (the first limit reached is applicable) following receipt of this ALERT SERVICE BULLETIN, issued on the date indicated at the bottom of the Non-installed equipment or parts:

- Comply with paragraph 3.B.5. before installing on the helicopter used fuel supply hoses that were kept in storage at the time of receipt of this ALERT SERVICE BULLETIN.

- Compliance with paragraph 3.B.5. is not applicable to new fuel supply hoses.

1.F. APPROVAL Approval of modifications:

Not applicable.

Approval of this document:

The technical information contained in this ALERT SERVICE BULLETIN Revision 0 was approved on February 26, 2019 under the authority of EASA Design Organization Approval No. 21J.700 for civil version helicopters subject to an Airworthiness Certificate.

The technical information contained in this ALERT SERVICE BULLETIN Revision 0 was approved on February 26, 2019 under the prerogatives of the recognition of design capability FRA21J-002-DGA for French Government helicopters.

The technical information contained in this ALERT SERVICE BULLETIN Revision 1 was approved on February 28, 2019 under the authority of EASA Design Organization Approval No. 21J.700 for civil version helicopters subject to an Airworthiness Certificate.

The technical information contained in this ALERT SERVICE BULLETIN Revision 1 was approved on February 28, 2019 under the prerogatives of the recognition of design capability FRA21J-002-DGA for French Government helicopters.

The technical information contained in this ALERT SERVICE BULLETIN Revision 2 was approved on May 20, 2021 under the authority of EASA Design Organization Approval No. 21J.700 for civil version helicopters subject to an Airworthiness Certificate.

The technical information contained in this ALERT SERVICE BULLETIN Revision 2 was approved on May 20, 2021 under the prerogatives of the recognition of design capability FRA21J-002-DGA for French Government helicopters.

Revision 0 2019-02-26 Page 4/20 Revision 2 2021-05-21 This document is available on the Internet: www.airbushelicopters.com/techpub/

Page 5OCROpen in PDF

AIRBUS HELICOPTERS No. EC225-71A019

1.G. MANPOWER For compliance with this ALERT SERVICE BULLETIN, Airbus Helicopters recommends the following staff qualifications:

Qualification: 1 Mechanical Technician.

The Estimated Man-hours are indicated for reference purposes only and based on a standard helicopter configuration.

Time for the operations: - approximately 1 hour for 1 Mechanical Technician to perform the visual inspection of the fuel supply hose,

- approximately 8 hours for 1 Mechanical Technician if the LH power plant is removed.

1.H. WEIGHT AND BALANCE Not applicable.

1.I. POWER CONSUMPTION Not applicable.

1.J. SOFTWARE UPGRADES/UPDATES Not applicable.

1.K. REFERENCES The following documents are required for compliance with this ALERT SERVICE BULLETIN.

Aircraft Maintenance Manual (MMA)

- MMA: 28-00-00-212: Checking the leak-tightness of the self-sealing couplings - GENERAL

- MMA: 28-00-00-611: General instructions - GENERAL

- MMA: 71-00-00-051: Removal - Installation - POWER PLANT Standard Practices Manual (MTC

- MTC: 20-01-01-302: Use of oils - Miscellaneous products used on helicopters

• MTC: 20-01-01-304: Use of special products - Miscellaneous products used on helicopters

- MTC: 20-01-01-312: Use of dry lubricating films - Miscellaneous products used on helicopters

- MTC: 20-02-01-103: Installation of pipes - General

- MTC: 20-02-01-408: Installation of BNAE cylindrical couplings - General

- MTC: 20-02-06-402: Safetying with lockwire - Safetying and locking assemblies Information Notice (IN)

- IN: 3481-1-00: The Marketplace: an AirbusWorld Ordering service

- IN: 3643-1-00: Introduction of the digital Service Bulletin reporting service R-TEX Revision 0 2019-02-26 Page 5/20 Revision 2 2021-05-21 This document is available on the Internet: www.airbushelicopters.com/techpub/

Page 6OCROpen in PDF

AIRBUS HELICOPTERS No. EC225-71A019

1.L. OTHER AFFECTED PUBLICATIONS

- This ALERT SERVICE BULLETIN will give rise to modification by Airbus Helicopters of Tasks 71-00-00-051 (Removal - Installation - POWER PLANT) and 28-20-00-068 (Removal / Installation - LH engine fuel supply line - FUEL SUPPLY SYSTEM) of the Aircraft Maintenance Manual (MMA).

- The document concerned will be updated as part of a future revision.

1.M. PART INTERCHANGEABILITY OR MIXABILITY Not applicable.

Revision 0 2019-02-26 Page 6/20 Revision 2 2021-05-21 This document is available on the Internet: www.airbushelicopters.com/techpub/

Page 7OCROpen in PDF

AIRBUS HELICOPTERS No. EC225-71A019

2. EQUIPMENT OR PARTS INFORMATION

2.A. EQUIPMENT OR PARTS: PRICE - AVAILABILITY - PROCUREMENT Airbus Helicopters' Super Puma Program Department will inform customers of availability times for kits or components.

Airbus Helicopters Etablissement de Marignane Direction Ventes et Relations Client 13725 MARIGNANE CEDEX FRANCE NOTE 1 On the purchase order, please specify the mode of transport, the destination and the serial numbers of the helicopters to be modified.

NOTE 2 For ALERT SERVICE BULLETINS, order by:

Telex: HELICOP 410 969F Fax: +33 (0)4.42.85.99.96.

2.B. LOGISTIC INFORMATION Not applicable.

2.C. EQUIPMENT OR PARTS REQUIRED PER HELICOPTER/COMPONENT Kits to order for one helicopter or one assembly:

New Old Key Word Qty Item P/N P/N → Instruction Fuel supply hose AIR 704A34416087 1 704A34416087 Replace if necessary Revision 0 2019-02-26 Page 7/20 Revision 2 2021-05-21 This document is available on the Internet: www.airbushelicopters.com/techpub/

Page 8OCROpen in PDF

AIRBUS HELICOPTERS No. EC225-71A019 Consumables to be ordered separately:

As per Work Cards and Tasks indicated in this ALERT SERVICE BULLETIN Key Word Qty P/N Item Lockwire A/R EN3628-0.80 CM 776 2 Grease A/R CMS N4999757000 CM 164 3 Oil A/R O-155 CM 123 4 You can send an order for the consumables from the AirbusWorld Marketplace through e-ordering (IN 3481-1-00). If you cannot get access to e-ordering, please contact your Logistic Focal Point.

Special tools:

Key Word Qty P/N or equivalent Item Endoscope ICO 13-70-50-01 or equivalent ZZ available off the shelf

2.D. EQUIPMENT OR PARTS TO BE RETURNED Not applicable.

Revision 0 2019-02-26 Page 8/20 Revision 2 2021-05-21 This document is available on the Internet: www.airbushelicopters.com/techpub/

Page 9OCROpen in PDF

AIRBUS HELICOPTERS No. EC225-71A019

3. ACCOMPLISHMENT INSTRUCTIONS

3.A. GENERAL

- Read and comply with the fuel instructions as per Task 28-00-00-611 (MMA).

- Read and comply with the instructions for use of oils and products used on the helicopter as per Work Card 20-01-01-302 (MTC).

- Read and comply with the instructions for the use of special products as per Work Card 20-01-01-304 (MTC).

- Read and comply with the instructions for the use of dry lubricating films as per Work Card 20-01-01-312 (MTC).

- Read and comply with the general instructions for installing pipes as per Work Card 20-02-01-103 (MTC).

- Read and comply with the general instructions for installing BNAE cylindrical couplings as per Work Card 20-02-01-408 (MTC).

- Read and comply with the instructions for safetying and locking assemblies as per MTC Work Card 20-02-06-402 (MTC).

3.B. WORK STEPS

3.B.1. Preliminary steps

- Install the access equipment.

- Remove and/or open all cowlings, panels, doors and equipment as required for access to the different work areas.

3.B.2. Inspection of the fuel supply hose of the LH power plant (Figures 1 to 7)

3.B.2.a. Visual inspection of fuel supply hose (a) of the LH power plant (Figures 1 and 2)

- Make sure that fuel supply hose (a) is not twisted (Figures 1 and 2):

• If fuel supply hose (a) is not twisted:

.. perform the final steps as per paragraph 3.B.4. and continue flights.

• If twisting is found (Figure 1) or if in doubt:

.. perform an inspection of the inside of fuel supply hose (a) as per paragraph 3.B.2.b.

J. S. GALLONS Figure 1 Revision 0 2019-02-26 Page 9/20 Revision 2 2021-05-21 This document is available on the Internet: www.airbushelicopters.com/techpub/

Page 10OCROpen in PDF

AIRBUS HELICOPTERS No. EC225-71A019 NOTE 1 A folded fire protection of fuel supply hose (a) as per Figure 2 is not a reason for removal.

Folding Figure 2

3.B.2.b. Inspection of the inside of fuel supply hose (a) (Figures 3 to 7)

CAUTION

DO NOT MOVE THE LH POWER PLANT WHEN THE

SELF-SEALING UNION OF THE LH FUEL SUPPLY HOSE IS CONNECTED TO THE ENGINE DECK.

- Remove the LH power plant as per the principles of Task 71-00-00-051 (MMA).

- Remove and discard the lockwire.

- Remove fuel supply hose (a) (Figure 6, DETAIL A and Figure 7, DETAIL B).

Revision 0 2019-02-26 Page 10/20 Revision 2 2021-05-21 This document is available on the Internet: www.airbushelicopters.com/techpub/

Page 11OCROpen in PDF

AIRBUS HELICOPTERS No. EC225-71A019

- On a work bench, with an endoscope (zz) (Figure 3), check that fuel supply hose (a) is not twisted on the inside, over its whole length, as per Figures 4 and 5.

NOTE 2 The area which is particularly affected is located at approximately 8 cm (3.149 in) from the power plant intake side of the fuel supply hose.

Figure 3 Figure 4: example of a non-twisted hose Figure 5: example of a twisted hose

- If fuel supply hose (a) is not twisted on the inside:

. install fuel supply hose (a) as per paragraph 3.B.3.b., . perform the final steps as per paragraph 3.B.4., . comply with paragraph 3.C. and continue flights.

- If fuel supply hose (a) is twisted on the inside:

. complete the form in the APPENDIX and send it to the indicated address, . remove and keep self-sealing union assembly (b) or (f) (Figure 7, DETAILS C and D), . discard fuel supply hose (a),

• install a fuel supply hose (1) as per paragraph 3.B.3. (Figure 7, DETAIL B).

Revision 0 2019-02-26 Page 11/20 Revision 2 2021-05-21 This document is available on the Internet: www.airbushelicopters.com/techpub/

Page 12OCROpen in PDF

AIRBUS HELICOPTERS No. EC225-71A019

3.B.3. Installation of fuel supply hose (a) or (1) (Figures 7 to 9)

3.B.3.a. Replacement of fuel supply hose (a) (Figure 7)

- If fuel supply hose (a) is replaced, on a work bench (Figure 7, DETAIL B):

• PRE MOD OP-26934 (Figure 7, DETAIL C):

.. install self-sealing union assembly (f) on fuel supply hose (1), ..torque-tighten self-sealing union assembly (f) on fuel supply hose (1) as per Work Card 20-02-01-408 (MTC), .. safety self-sealing union assembly (f) with lockwire (2) on fuel supply hose (1).

. POST MOD OP-26934 (Figure 7, DETAIL D):

.. install self-sealing union assembly (b) on fuel supply hose (1), .. torque-tighten self-sealing union assembly (b) on fuel supply hose (1) as per MTC Work Card 20-02-01-408, .. safety self-sealing union assembly (b) with lockwire (2) on fuel supply hose (1).

NOTE 3 Safetying is performed with lockwire (2).

A CAUTION

COMPLIANCE INSTALLATION PROCEDURE OF FUEL SUPPLY HOSE (a) OR (1) IS MANDATORY. IT MAKES SURE THAT FUEL SUPPLY HOSE (a) OR (1) IS NOT TWISTED AFTER INSTALLATION.

Revision 0 2019-02-26 Page 12/20 Revision 2 2021-05-21 This document is available on the Internet: www.airbushelicopters.com/techpub/