Service bulletin · Airbus Helicopters

On this page

Copies · 2

Copies of this document that the FAA filed in AD dockets on regulations.gov, newest revision first. A newer revision may exist.

Revision 3Airbus Helicopters ASB No. SA330-05.103 Rev 3 · 20 pages · 730 KB

© Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2022-0888, the docket of AD 2022-20-07. Not covered by OpenAirDocs’ CC0 dedication.

Docket FAA-2022-0888 (document 0004) · AD 2022-20-07

Airbus Helciopters ASB SA330 05.103 Rev 1Airbus Helciopters ASB SA330 05.103 Rev 1 · 14 pages · 368 KB

© Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2021-0105, the docket of AD 2021-10-10. Not covered by OpenAirDocs’ CC0 dedication.

Docket FAA-2021-0105 (document 0004) · AD 2021-10-10

Manufacturer
Airbus Helicopters
Type
Alert Service Bulletin
Number
SA330-05.103
Latest revision known
SA330-05.103, Revision 3, dated October 4, 2021

A newer revision may exist than any OpenAirDocs knows of: check with the manufacturer.

ADs that cite it · 1

Newest first, with the revision each names, as OpenAirDocs read it from the AD’s text: check it against the AD.

Also cited in 1 proposed AD.

Text · 20OCR

Revision 3, the newest copy. This text is OCR from a scan. OCR can misread letters and numbers. © Airbus Helicopters. Filed by the FAA in regulations.gov docket FAA-2022-0888, the docket of AD 2022-20-07. Not covered by OpenAirDocs’ CC0 dedication.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '4853dd9d8c1a5e269c46d22983a3986e0e059944aaf5984635897dec3558c2c9'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Page 1OCROpen in PDF

AIRBUS HELICOPTERS No. SA330-05.103 Civil version(S):

ALERT SERVICE BULLETIN

PROTECTIVE MEASURE TIME LIMITS - MAINTENANCE CHECKS - Main rotor drive Check of the MGB oil sump and particle detector For the attention of Revision No. Date of issue Revision 0 2018-03-20 Revision 1 2018-12-10 Revision 2 2021-01-13 Revision 3 2021-10-04 Summary:

The purpose of this ALERT SERVICE BULLETIN is to modify the verification criteria of the particles collected in the lubrication circuit of the MGB.

Reason for last revision:

The purpose of Revision 3 of this ALERT SERVICE BULLETIN is to extend from 45 flight hours to 100 flight hours the check of the MGB oil sump for the helicopters which have complied with the ALERT SERVICE BULLETIN No. 65.139 (correspond to embodiment of modification 0751091).

Compliance:

Airbus Helicopters makes compliance with this ALERT SERVICE BULLETIN mandatory.

Revision 0 2018-03-20 Page 1/20 Revision 3 2021-10-04 This document is available on the Internet: www.airbushelicopters.com/techpub/

Page 2OCROpen in PDF

AIRBUS HELICOPTERS No. SA330-05.103

1. PLANNING INFORMATION

1.A. EFFECTIVITY

1.A.1. Helicopters/installed equipment or parts SA330 helicopters, version J.

1.A.2. Non-installed equipment or parts MGBs which have logged flight hours since the last overhaul.

1.B. ASSOCIATED REQUIREMENTS Not applicable.

1.C. REASON Revision 0:

Following Airbus Helicopters' commitment to a global fleet improvement process, resulting from technical insight gained following the 2016 EC225 accident in Norway, the company is applying a fleet-wide improvement process and has now released an ALERT SERVICE BULLETIN for the legacy SA330 aircraft.

This is part of Airbus Helicopters' commitment to lead the industry in setting new standards in safety and ensures the right precautionary measures are in place to support our global fleet.

As a precautionary measure, Airbus Helicopters provides updated particle assessment criteria aligned with the standards set for EC225/AS332 L2 helicopters.

Revision 1:

The purpose of Revision 1 is to introduce a periodic check of the MGB oil sump to make sure that there are no particles.

Revision 1 does not affect compliance with revision 0 of this ALERT SERVICE BULLETIN Revision 2:

The purpose of revision 2 is to introduce a new tool (MGB particle catcher, P/N: X632P5202101), (Figure 1) to simplify the periodic check of the MGB oil sump without removal of the sump (if no particles are collected).

Revision 2 of this ALERT SERVICE BULLETIN does not affect compliance with the previous revisions of this ALERT SERVICE BULLETIN.

Figure 1 Revision 0 2018-03-20 Page 2/20 Revision 3 2021-10-04 This document is available on the Internet: www.airbush elicopters.com/techpub/

Page 3OCROpen in PDF

AIRBUS HELICOPTERS No. SA330-05.103 Revision 3:

The purpose of Revision 3 of this ALERT SERVICE BULLETIN is to extend from 45 flight hours to 100 flight hours the check of the MGB oil sump for the helicopters which have complied with the ALERT SERVICE BULLETIN No. 65.139 (correspond to embodiment of modification 0751091).

NOTE 1 Modification 0751091 consists to replace the current planet gears assemblies, installed on MGBs by planet gears assemblies Part Number 330A32-9861-02.

1.D. DESCRIPTION This ALERT SERVICE BULLETIN consists in:

- Periodically checking the MGB particle detector.

- Periodically checking the MGB oil sump to make sure that there are no particles.

- If necessary, analyzing the particles as per Appendix 4.A.

1.E. COMPLIANCE

1.E.1. Compliance at H/C manufacturer level Not applicable.

1.E.2. Compliance in service Helicopters/installed equipment or parts:

Airbus Helicopters makes compliance with this ALERT SERVICE BULLETIN mandatory.

The work must be performed on helicopter by the Operator.

- For all helicopters, . Comply with paragraph 3.B.2.a.:

.. After the last flight of the day following receipt of revision 0 of this ALERT SERVICE BULLETIN, Then, .. at each last flight of the day, without exceeding 10 flight hours.

- For helicopters which have not complied with the ALERT SERVICE BULLETIN No. 65.139, . Comply with paragraph 3.B.2.b. or 3.B.2.c. or 3.B.2.d. (see NOTE 2):

.. Within 45 flight hours following receipt of revision 1 of this ALERT SERVICE BULLETIN, Then, .. every 45 flight hours.

- For helicopters which have complied with the ALERT SERVICE BULLETIN No. 65.139, . Comply with paragraph 3.B.2.b. or 3.B.2.c. or 3.B.2.d. (see NOTE 2):

.. Within 100 flight hours following compliance with ALERT SERVICE BULLETIN No. 65.139, Then, .. Every 100 flight hours.

Revision 0 2018-03-20 Page 3/20 Revision 3 2021-10-04 This document is available on the Internet: www.airbushelicopters.com/techpub/

Page 4OCROpen in PDF

AIRBUS HELICOPTERS No. SA330-05.103 NOTEZ Paragraph 3.B.2.b. proposes a procedure with removal of Paragraph 3.B.2.c. proposes a procedure without removal of the MGB oil sump and with removal of the blanking plate of Paragraph 3.B.2.d. proposes a procedure with the dedicated tool, without removal of the MGB oil sump and without removal of the blanking plate of the MGB oil sump (Figures 2 to 6 and 8).

Non-installed equipment or parts:

For MGBs listed in paragraph 1.A.2., comply with paragraph 3.B.2.b. or 3.B.2.c. or 3.B.2.d. before installation on the helicopter.

1.F. APPROVAL Approval of modifications:

Not applicable.

Approval of this document:

The technical information contained in this ALERT SERVICE BULLETIN Revision 0 was approved on March 20, 2018 under the authority of EASA Design Organization Approval No. 21J.700 for helicopters of civil versions subject to an Airworthiness Certificate.

The technical information contained in this ALERT SERVICE BULLETIN Revision 1 was approved on December 10, 2018 under the authority of EASA Design Organization Approval No. 21J.700 for civil version helicopters subject to an Airworthiness Certificate.

The technical information contained in this ALERT SERVICE BULLETIN Revision 2 was approved on January 12, 2021 under the authority of EASA Design Organization Approval No. 21J.700 for civil version helicopters subject to an Airworthiness Certificate.

The technical information contained in this ALERT SERVICE BULLETIN Revision 3 was approved on September 24, 2021 under the authority of EASA Design Organization Approval No. 21J.700 for civil version helicopters subject to an Airworthiness Certificate.

Revision 0 2018-03-20 Page 4/20 Revision 3 2021-10-04 This document is available on the Internet: www.airbushelicopters.com/techpub/

Page 5OCROpen in PDF

AIRBUS HELICOPTERS No. SA330-05.103

1.G. MANPOWER For compliance with this ALERT SERVICE BULLETIN, Airbus Helicopters recommends the following staff qualifications:

Qualifications: - 1 Mechanical Technician

- 1 Pilot (for compliance with paragraph 3.D.).

The Estimated Man-hours are indicated for reference purposes only and based on a standard helicopter configuration.

Estimated Man-hours: - 15 minutes for checking the particle detector (paragraph 3.B.2.a.), excluding access time

- 4 hours for:

• draining the MGB, . removing the MGB blanking plate or oil sump, . installing the MGB blanking plate or oil sump, . filling the MGB.

- 1 hour for:

. removing the drag damper hydraulic assembly, . checking the MGB oil sump with the MGB particle catcher,

• installing the drag damper hydraulic assembly.

Estimated helicopter downtime is indicated for reference purposes only, based on a standard helicopter configuration.

Helicopter downtime is estimated at 1 day.

1.H. WEIGHT AND BALANCE Not applicable.

1.I. POWER CONSUMPTION Not applicable.

1.J. SOFTWARE UPGRADES/UPDATES Not applicable.

Revision 0 2018-03-20 Page 5/20 Revision 3 2021-10-04 This document is available on the Internet: www.airbushelicopters.com/techpub/

Page 6OCROpen in PDF

AIRBUS HELICOPTERS No. SA330-05.103

1.K. REFERENCES The following documents are required for compliance with this ALERT SERVICE BULLETIN:

Maintenance Manual (MDE):

MDE: 5-53-203: SPECIAL CHECK ON GEAR BOXES (after oil contamination), MDE: 65-32-301: Filling the main gearbox with oil MDE: 65-32-302: Draining the MGB lubrication system MDE: 65-32-409: Removal and installation of the M.G.B. lower casing cover (oil sump) MDE: 65-32-410: Removal-installation of the oil sampling valve and its flanged cup MDE: 65-32-602: Main gearbox: Checking the magnetic element Standard Practices Manual (MTC):

MTC: 20-02-06-402: Safetying with lockwire - Safetying and locking assemblies MTC: 20-07-02-201: Helicopter parked in a repair shop - Safety instructions MTC: 20-07-03-408: Appearance checks on an aircraft after an inspection or repair - Technical instructions MTC: 20-08-01-601: Monitoring of lubricating oil contamination on mechanical assemblies equipped with magnetic plugs - Periodical monitoring of lubricating oil checking elements Information Notices (IN):

IN No. 2832-1-00: Procedure for returning parts to Airbus Helicopters for overhaul/repair/technical investigation/core unit return (not attached to this ALERT SERVICE BULLETIN) IN No. 3481-1-00: The Marketplace: an AirbusWorld Ordering service IN No. 3643-1-00: Introduction of the digital Service Bulletin reporting R-Tex Safety Information Notices (SIN):

SIN No. 3095-S-63: Collecting, characterizing and following up particles in dynamic component lubrication systems (not attached to this ALERT SERVICE BULLETIN)

1.L. OTHER AFFECTED PUBLICATIONS Not applicable.

1.M. PART INTERCHANGEABILITY OR MIXABILITY Not applicable.

Revision 0 2018-03-20 Page 6/20 Revision 3 2021-10-04 This document is available on the Internet: www.airbushelicopters.com/techpub/

Page 7OCROpen in PDF

AIRBUS HELICOPTERS No. SA330-05.103

2. EQUIPMENT OR PARTS INFORMATION

2.A. EQUIPMENT OR PARTS: PRICE - AVAILABILITY - PROCUREMENT Not applicable.

2.B. LOGISTIC INFORMATION Not applicable.

2.C. EQUIPMENT OR PARTS REQUIRED PER HELICOPTER/COMPONENT Consumables to be ordered separately:

As per Work Cards mentioned in this ALERT SERVICE BULLETIN and list below.

Key Word Qty P/N Item DC SEA 602/B Cleaning agent A/R 208 1 (White Spirit) Lockwire A/R EN3628-0.80 776 2 You can order the consumables from the AirbusWorld Marketplace through e-ordering (IN No. 3481-1-00).

If you cannot get access to e-ordering, please contact your Logistic Focal Point.

Special tools:

As per Work Cards mentioned in this ALERT SERVICE BULLETIN and list below:

Key Word Qty Tooling P/N or equivalent Item Syringe Commercial ZZ Magnetic rod Commercial УУ Round magnet Dia 10mm Thickness 5mm more than 1 Tesla (INED0012) 1 Commercial xX Glove (TOUCHNTUFF 92-600) Commercial ww MGB particles catcher X632P5202101 VV

2.D. EQUIPMENT OR PARTS TO BE RETURNED Return the equipment or parts as per the procedure described in Information Notice No. 2832-1-00.

Revision 0 2018-03-20 Page 7/20 Revision 3 2021-10-04 This document is available on the Internet: www.airbushelicopters.com/techpub/

Page 8OCROpen in PDF

AIRBUS HELICOPTERS No. SA330-05.103

3. ACCOMPLISHMENT INSTRUCTIONS

3.A. GENERAL

CAUTION

AIRBUS HELICOPTERS REMINDS YOU THAT IT IS

MANDATORY CONTACT

AIRBUS HELICOPTERS IF THE CRITERIA SPECIFIED IN MTC WORK CARD 20-08-01-601 ARE EXCEEDED.

- As per Work Card 20-07-02-201 (MTC), read and comply with the general instructions for helicopters parked in a repair shop.

3.B. WORK STEPS

3.B.1. Preliminary steps

- Park the helicopter in a maintenance shop.

- Install appropriate access equipment.

- Remove all equipment and furnishings as required for access to the different work zones.

3.B.2. Procedure

3.B.2.a. Check of the MGB particle detector

- Make sure there is no metal particle on the MGB bottom detector as per Work Card 65-32-602 (MDE).

- Refer to Appendix 4.A. for the measures to be taken, in case of detection of particles.

CAUTION

DURING COMPLIANCE WITH WORK CARD 5-53-203 (MDE), DO NOT FILTER THE OIL. DRAIN THE OIL IN A CLEAN AND

TRANSPARENT CONTAINER AND COLLECT THE

PARTICLES USING A MAGNETIC ELEMENT AS

RECOMMENDED WORK CARD 20-08-01-601.

Revision 0 2018-03-20 Page 8/20 Revision 3 2021-10-04 This document is available on the Internet: www.airbushelicopters.com/techpub/

Page 9OCROpen in PDF

AIRBUS HELICOPTERS No. SA330-05.103

3.B.2.b. Check of the MGB oil sump (with removal of the sump) (Figure 2)

- Drain the MGB as per the principles of Work Card 65-32-302 (MDE).

- Collect the drained oil in a clean container of light color and appropriate capacity.

- Flush the MGB drain line with cleaning agent (1) to collect particles which possibly remained inside the

- Collect the oil and cleaning agent (1) from the drain line in a clean container of light color and appropriate capacity.

- Remove the MGB oil sump as per the principles of Work Card 65-32-409 (MDE).

- Collect the remaining oil on the bottom of the MGB oil sump and add it to the previously drained oil of the MGB.

NOTE 1 The remaining oil on the bottom of the MGB oil sump can be collected with a syringe (zz), for example.

- With a clean magnetic rod (yy), collect the particles in:

. the MGB oil sump, . the drained oil from the MGB,

• the liquids collected during flushing of the drain line.

- If there are no particles:

. clean the MGB oil sump, . install the MGB oil sump as per the principles of Work Card 65-32-409 (MDE), . fill the MGB with oil as per the principles of Work Card 65-32-301 (MDE),

• perform the final steps and a ground run.

- If there are particles:

. refer to Appendix 4.A. for the measures to be taken, . if it is authorized to continue flights after compliance with the flow chart in Appendix 4.A.:

.. clean the MGB oil sump, .. install the MGB oil sump as per the principles of Work Card 65-32-409 (MDE), .. fill the MGB with oil as per the principles of Work Card 65-32-301 (MDE), .. perform the final steps and a ground run.

3.B.2.c. Check of the MGB oil sump (without removal of the sump) (Figure 7)

- Drain the MGB as per the principles of Work Card 65-32-302 (MDE).

- Collect the drained oil in a clean container of light color and appropriate capacity.

- Flush the MGB drain line with cleaning agent (1) to collect particles which possibly remained inside the drain line.

- Collect the oil and cleaning agent (1) from the drain line in a clean container of light color and appropriate capacity.

WARNING

WHEN REMOVING THE BLANKING PLATE, WATCH

FOR THE RISK OF SPLASHING OF OIL WHICH

REMAINED ON THE BOTTOM OF THE MGB OIL SUMP.

- Remove the blanking plate of the MGB oil sump as per the principles of Work Card 65-32-410 (MDE).

- Collect the remaining oil on the bottom of the MGB oil sump and add it to the previously drained oil of the MGB.

Revision 0 2018-03-20 Page 9/20 Revision 3 2021-10-04 This document is available on the Internet: www.airbu helicopters.com/techpub/

Page 10OCROpen in PDF

AIRBUS HELICOPTERS No. SA330-05.103

- With a clean magnetic rod (Vy), collect the particles in:

. the drained oil from the MGB,

• the liquids collected during flushing of the drain line.

- Place round magnet (xx) inside glove (ww).

- Put on glove (ww).

- Pass your hand through the hole in the blanking plate.

- Make sure that there are no particles on the whole surface of the MGB sump, (Figure 7):

• in Area A (Figure 7), . in Area B (Figure 7).

- If in doubt on the efficiency of the particle collection with magnet and glove, comply with paragraph 3.B.2.b.

- If there are no particles:

. install the blanking plate of the MGB oil sump as per the principles of Work Card 65-32-410 (MDE), . fill the MGB with oil as per the principles of Work Card 65-32-301 (MDE), . perform the final steps and a ground run.

- If there are particles:

. refer to Appendix 4.A. for the measures to be taken, . if it is authorized to continue flights after compliance with the flow chart as per Appendix 4.A.:

.. install the blanking plate of the MGB oil sump as per the principles of Work Card 65-32-410 (MDE), .. fill the MGB with oil as per the principles of Work Card 65-32-301 (MDE), .. perform the final steps and a ground run.

3.B.2.d. Check of the MGB oil sump (without removal of the sump) with the tool (vv), (Figures 2 to 6 and 8)

- Remove and discard the lockwire (a) (Details A and B, Figure 8).

- Loosen the nut (b).

- Remove the clip (c) that secures the drag damper hydraulic reservoir (d) to its support.

CAUTION

TAKE CARE NOT TO STRETCH THE HYDRAULIC HOSES.

- Move the drag damper hydraulic reservoir (d) to the forward position to clear a space of approximately 10 cm (3.93 in.).

Revision 0 2018-03-20 Page 10/20 Revision 3 2021-10-04 This document is available on the Internet: www.airbushelicopters.com/techpub/

Page 11OCROpen in PDF

AIRBUS HELICOPTERS No. SA330-05.103

CAUTION MAKE SURE THAT TOOL (vv) IS CLEAN BEFORE

INSTALLATION TO PREVENT ANY FOD OR POLLUTION IN THE MGB.

- Remove the cap (not shown) from the cup (f) (Figure 6).

- Install the tool (vv) on the main rotor mast (Figure 2).

Figure 2

- Put the external magnet in the center of the cover of the MGB oil sump (Figure 3).

NOTE 2 Make sure that the cable is retracted and locked.

External magnet Figure 3 Revision 0 2018-03-20 Page 11/20 Revision 3 2021-10-04 This document is available on the Internet: www.airbushelicopters.com/techpub/

Page 12OCROpen in PDF

AIRBUS HELICOPTERS No. SA330-05.103

- Take the internal magnet (Figures 3 and 4) down to the bottom of the MGB oil sump until synchronization with the external magnet.

NOTE 3 To make sure that the external magnet is synchronized with the internal magnet, check that the external magnet is self-maintained on the sump, (Figure 3).

Internal magnet Figure 4

- If synchronization is lost, put the external magnet in the center of the cover of the MGB oil sump and synchronize it again with the internal magnet.

NOTE 4 If a single operator performs the operation, it is possible to release the wire of the pole and to move back the internal magnet (approx. 20 cm (7.874 in.)) for subsequent synchronization with the external magnet. In this case, make sure that the wire is not retained / taut during the operation, by manually checking for correct synchronization over the whole travel.

Revision 0 2018-03-20 Page 12/20 Revision 3 2021-10-04 This document is available on the Internet: www.airbushelicopters.com/techpub/