Copy · SB_A320-53-1257_r02 · 157 pages

© Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2019-0250, the docket of AD 2019-18-07. Not covered by OpenAirDocs’ CC0 dedication.

Text

From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '99beff1d24ef98e4fbc50e4906f81df652391ef1120c7372048422eba489ed32'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

@A318/A319/A320/A321

SERVICE BULLETIN

REVISION TRANSMITTAL SHEET AIRBUS

CUSTOMER SERVICES DIRECTORATE 1 Rond Point Maurice Bellonte 31707 BLAGNAC CEDEX FRANCE T e l:( 3 3 )56 19 33 33 3 Telex : AIRBU 530526F F a x:( 3 3 )56 19 34 25 1

MANDATORY

MANDATORY

MANDATORY ATA SYSTEM: 53 TITLE: FUSELAGE - INSPECTION OF TACK HOLES AT FR50-FR63 BETWEEN P33-P39 (LH ONLY) IN CARGO FLOOR AREA MODIFICATION No.: None This page transmits Revision No.02 of Service Bulletin No.A320-53-1257

ADDITIONAL WORK **CONF ALL No additional work is required by this revision for aircraft inspected by any previous issue.

REASON Revision No. 02 issued to:

- correct the inspection requirements on Frame 59 to make sure that the correct hole is inspected.

CHANGES The main changes of this revision are:

- Update the Service bulletin effectivity

- Update the R EASON paragraph

- Add reference to Service Bulletin Information Transmission (SBIT) 16-0070

- Amend the NOTE below the Accomplisment Timescale Table for configurations 004, 005, 006 and 007

- Include inspection thresholds for A319CJ aircraft

- Update the Accomplisment Timescale Table for configurations 005 and 007

- Update the Procurement Address

- Update COMPD01 and COMPD02

- Update the Accomplishment Instructions DATE: Dec 21/12 SERVICE BULLETIN No.: A320-53-1257 REVISION No.: 02 - Nov 29/16 Page: 1 6 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A318/A319/A320/A321

SERVICE BULLETIN

REVISION TRANSMITTAL SHEET

- Update Figure A-G BAAA - Sheet 02 and Figure A -GBAAB - Sheet 02

- Update Figure A-GFAAA and A-GFAAB - Flowchart

- Update Figure A-GAAAA and A- GAAAB - Inspection Report.

FRONT MATTER

FUSELAGE - INSPECTION OF TACK HOLES AT FR50-FR63 BETWEEN P33- P39 (LH ONLY) IN CARGO FLOOR AREA

CONFIGURATION UPDATED R

SUMMARY

REASON/DESCRIPTION/OPERATIONAL

CONSEQUENCES

REASON UPDATED R

MATERIAL PRICE INFORMATION

MATERIAL PRICE INFORMATION TABLE

UPDATED R

MATERIAL PRICE INFORMATION TABLE

UPDATED R

MATERIAL PRICE INFORMATION TABLE

UPDATED R

MATERIAL PRICE INFORMATION TABLE

UPDATED R

MATERIAL PRICE INFORMATION TABLE

UPDATED R

MATERIAL PRICE INFORMATION TABLE

UPDATED R

MATERIAL PRICE INFORMATION TABLE

UPDATED R

EFFECTIVITY

OPERATOR LIST UPDATED R

REFERENCES / REPERCUSSIONS

REFERENCES/REPERCUSSIONS TABLE

UPDATED R

PLANNING INFORMATION

EFFECTIVITY

EFFECTIVITY RELATED INFORMATION

UPDATED R Configuration definition CONF 001

CONFIGURATION DEFINITION UPDATED R CONF 002

CONFIGURATION DEFINITION UPDATED R CONF 005

CONFIGURATION DEFINITION UPDATED R CONF 006

CONFIGURATION DEFINITION UPDATED R CONF 007

CONFIGURATION DEFINITION UPDATED R REASON Advantages

ADVANTAGES UPDATED R

COMPLIANCE Accomplishment Timescale

ACCOMPLISHMENT TIMESCALE UPDATED R Accomplishment Timescale

ACCOMPLISHMENT TIMESCALE UPDATED R Accomplishment Timescale

ACCOMPLISHMENT TIMESCALE UPDATED R Accomplishment Timescale

ACCOMPLISHMENT TIMESCALE UPDATED R Accomplishment Timescale

ACCOMPLISHMENT TIMESCALE UPDATED R DATE: Dec 21/12 SERVICE BULLETIN No.: A320-53-1257 REVISION No.: 02 - Nov 29/16 Page: 2 6 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A318/A319/A320/A321

SERVICE BULLETIN

REVISION TRANSMITTAL SHEET Accomplishment Timescale

ACCOMPLISHMENT TIMESCALE UPDATED R

REFERENCES

REFERENCED DOCUMENTATION UPDATED R

REFERENCED DOCUMENTATION UPDATED R

REFERENCED DOCUMENTATION UPDATED R

REFERENCED DOCUMENTATION UPDATED R

MATERIAL INFORMATION

MATERIAL - PRICE AND AVAILABILITY Procurement Addresses

PROCUREMENT ADDRESSES UPDATED R

LIST OF MATERIALS - OPERATOR

SUPPLIED Components Component COMPD01

PART MATERIAL SET UPDATED

PART NUMBER UPDATED

QUANTITY UPDATED

KEYWORD UPDATED R Component COMPD02

PART MATERIAL SET UPDATED

QUANTITY UPDATED

PART NUMBER UPDATED

KEYWORD UPDATED R

ACCOMPLISHMENT INSTRUCTIONS TASK 531257- 832-848-001-Inspection Subtask 531257-831-201-001

SUBTASK SOLUTION UPDATED R Subtask 531257-832-201-001

SUBTASK SOLUTION UPDATED

NOTE UPDATED R Subtask 531257-831-204-001

SUBTASK SOLUTION UPDATED

QUANTITY UPDATED

MATERIAL LIST UPDATED R Subtask 531257-831-201-002

SUBTASK SOLUTION UPDATED R Subtask 531257-832-201-002

SUBTASK SOLUTION UPDATED

REFERENCED DOCUMENTATION UPDATED

NOTE UPDATED R Subtask 531257-831-204-002

SUBTASK SOLUTION UPDATED

PART NUMBER UPDATED

KEYWORD UPDATED

QUANTITY UPDATED

PART NUMBER DESCRIPTION UPDATED

MATERIAL LIST UPDATED R Subtask 531257-831-201-002

SUBTASK SOLUTION UPDATED R Subtask 531257-832-201-002

SUBTASK SOLUTION UPDATED

REFERENCED DOCUMENTATION UPDATED

NOTE UPDATED R Subtask 531257-831-204-002

SUBTASK SOLUTION UPDATED

PART NUMBER UPDATED

KEYWORD UPDATED

QUANTITY UPDATED

PART NUMBER DESCRIPTION UPDATED

MATERIAL LIST UPDATED R Subtask 531257-831-201-001

SUBTASK SOLUTION UPDATED R DATE: Dec 21/12 SERVICE BULLETIN No.: A320-53-1257 REVISION No.: 02 - Nov 29/16 Page: 3 6 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A318/A319/A320/A321

SERVICE BULLETIN

REVISION TRANSMITTAL SHEET Subtask 531257-832-201-001

SUBTASK SOLUTION UPDATED

NOTE UPDATED R Subtask 531257-831-204-001

SUBTASK SOLUTION UPDATED

QUANTITY UPDATED

MATERIAL LIST UPDATED R Subtask 531257-831-201-002

SUBTASK SOLUTION UPDATED R Subtask 531257-832-201-002

SUBTASK SOLUTION UPDATED

REFERENCED DOCUMENTATION UPDATED

NOTE UPDATED R Subtask 531257-831-204-002

SUBTASK SOLUTION UPDATED

PART NUMBER UPDATED

KEYWORD UPDATED

QUANTITY UPDATED

PART NUMBER DESCRIPTION UPDATED

MATERIAL LIST UPDATED R Subtask 531257-831-201-001

SUBTASK SOLUTION UPDATED R Subtask 531257-832-201-001

SUBTASK SOLUTION UPDATED

NOTE UPDATED R Subtask 531257-831-204-001

SUBTASK SOLUTION UPDATED

QUANTITY UPDATED

MATERIAL LIST UPDATED R Subtask 531257-831-201-002

SUBTASK SOLUTION UPDATED R Subtask 531257-832-201-002

SUBTASK SOLUTION UPDATED

REFERENCED DOCUMENTATION UPDATED

NOTE UPDATED R Subtask 531257-831-204-002

SUBTASK SOLUTION UPDATED

PART NUMBER UPDATED

KEYWORD UPDATED

QUANTITY UPDATED

PART NUMBER DESCRIPTION UPDATED

MATERIAL LIST UPDATED R Fig. A-GBAAA Fig. A-GBAAA Sheet 02

SHEET UPDATED R Fig. A-GBAAB Fig. A-GBAAB Sheet 02

SHEET UPDATED R Fig. A-GFAAA Fig. A-GFAAA Sheet 01

SHEET UPDATED R Fig. A-GFAAB Fig. A-GFAAB Sheet 01

SHEET UPDATED R Appendix 01 - Inspection Report Fig. A-GAAAA Fig. A-GAAAA Sheet 01

SHEET UPDATED R Fig. A-GAAAB Fig. A-GAAAB Sheet 01

SHEET UPDATED R DATE: Dec 21/12 SERVICE BULLETIN No.: A320-53-1257 REVISION No.: 02 - Nov 29/16 Page: 4 6 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A318/A319/A320/A321

SERVICE BULLETIN

REVISION TRANSMITTAL SHEET

FILING INSTRUCTIONS This Service Bulletin has been generated electronically and is reissued as a complete document.

Replace the complete document.

Put this Revision Transmittal Sheet in front of the Service Bulletin.

HISTORY OF PREVIOUS REVISIONS Revision No. 01 issued to:

Change the compliance from RECOMMENDED to MANDATORY Add configurations 003, 004, 005, 006 and 007 Update the Accomplishment Timescale figures considering sharklet incorporation on MSNs Update the access requirements as per floor panel layout Add the specification of the replacement fasteners after hole inspection (COMPD01 and COMPD02).

REVISION SEQUENCE ORIGINAL: Dec 21/12 REVISION No. : 01 - Apr 28/16 REVISION No. : 02 - Nov 29/16 DATE: Dec 21/12 SERVICE BULLETIN No.: A320-53-1257 REVISION No.: 02 - Nov 29/16 Page: 5 6 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A318/A319/A320/A321

SERVICE BULLETIN

REVISION TRANSMITTAL SHEET This Page Intentionally Left Blank DATE: Dec 21/12 SERVICE BULLETIN No.: A320-53-1257 REVISION No.: 02 - Nov 29/16 Page: 6 6 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A318/A319/A320/A321

SERVICE BULLETIN

SUMMARY AIRBUS

CUSTOMER SERVICES DIRECTORATE 1 Rond Point Maurice Bellonte 31707 BLAGNAC CEDEX FRANCE T e l:( 3 3 )56 19 33 33 3 Telex : AIRBU 530526F F a x:( 3 3 )56 19 34 25 1 This summary is for information only and is not approved for modification of the aircraft.

MANDATORY

MANDATORY

MANDATORY ATA SYSTEM: 53 TITLE: FUSELAGE - INSPECTION OF TACK HOLES AT FR50-FR63 BETWEEN P33-P39 (LH ONLY) IN CARGO FLOOR AREA **CONF ALL

MODIFICATIONS None

REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES During a full-scale fatigue test a two sided crack from a tooling hole was detected in section 17, FR 56, between stringers 33 to 34 (LHS).

This Inspection Service Bulletin mandates a Rototest inspection of the rivet holes and open holes of the fuselage frames below the cargo floor support fittings between FR50 and FR63 (LHS only) for A320/A321 aircraft and between Frame 53 and Frame 63 (LHS only) for A319 aircraft.

Accomplishment of this Service Bulletin will contribute to ensure the structural integrity of the fuselage frames and the cargo floor support fittings.

The accomplishment of the Service Bulletin No. A320-53-1261 or other Service Bulletins introducing Modification Nos. 153065K15435 and 153563K15481 will cancel the inspection requirements of this Service Bulletin for A319, A320 and A321 aircraft.

Refer to SBIT 16-0070 for further information on applicable Service Bulletin instructions.

Modification Nos. 153065K15435 and 153563K15481 are not applicable to A319CJ aircraft.

The Operational/Maintenance Consequences of this Service Bulletin are covered by the update of the affected publications detailed in ’PLANNING INFORMATION’.

GENERAL EVALUATION

EVALUATION TABLE

COMPLIANCE MANDATORY (1)

CANCELS INSPECTION SB NO

POTENTIAL AD YES

A/C OPERATION AFFECTED NO

RELIABILITY AFFECTED NO

PAX COMFORT AFFECTED NO DATE: Dec 21/12 SERVICE BULLETIN No.: A320-53-1257 REVISION No.: 02 - Nov 29/16 Page: 1 6 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A318/A319/A320/A321

SERVICE BULLETIN

SUMMARY

EVALUATION TABLE

COST SAVING NO

ETOPS AFFECTED NO

STRUCTURAL LIFE EXTN NO

VENDOR SB INVOLVED NO NOTE

(1) : Service Bulletin must be accomplished.

MATERIAL PRICE INFORMATION **CONF 001

MATERIAL PRICE INFORMATION TABLE

MATERIAL SET

QTY PER A/C

PRICE PER

A/C (USD)

MAIN PARTS Component COMPD01 1 See SB Screws, nuts, rivets **CONF 002

MATERIAL PRICE INFORMATION TABLE

MATERIAL SET

QTY PER A/C

PRICE PER

A/C (USD)

MAIN PARTS Component COMPD02 1 See SB Screws, nuts, rivets **CONF 003

MATERIAL PRICE INFORMATION TABLE

MATERIAL SET

QTY PER A/C

PRICE PER

A/C (USD)

MAIN PARTS Component COMPD02 1 See SB Screws, nuts, rivets **CONF 004

MATERIAL PRICE INFORMATION TABLE

MATERIAL SET

QTY PER A/C

PRICE PER

A/C (USD)

MAIN PARTS Component COMPD01 1 See SB Screws, nuts, rivets **CONF 005

MATERIAL PRICE INFORMATION TABLE

MATERIAL SET

QTY PER A/C

PRICE PER

A/C (USD)

MAIN PARTS Component COMPD02 1 See SB Screws, nuts, rivets **CONF 006

MATERIAL PRICE INFORMATION TABLE

MATERIAL SET

QTY PER A/C

PRICE PER

A/C (USD)

MAIN PARTS Component COMPD01 1 See SB Screws, nuts, rivets DATE: Dec 21/12 SERVICE BULLETIN No.: A320-53-1257 REVISION No.: 02 - Nov 29/16 Page: 2 6 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A318/A319/A320/A321

SERVICE BULLETIN

SUMMARY **CONF 007

MATERIAL PRICE INFORMATION TABLE

MATERIAL SET

QTY PER A/C

PRICE PER

A/C (USD)

MAIN PARTS Component COMPD02 1 See SB Screws, nuts, rivets

EFFECTIVITY **CONF ALL This Service Bulletin is applicable to this (these) operator(s) :

03Q 13Y 15T 16T 17M 17R 19V 20Q 23R 27V 28M 29S 31V 31X 32Q 36R 38W 40N 40S 41N 41S 45O 46U 47P 48O 48P 53Z 56O 59N 59Z 61W 66X 69X 73W 74T 76W 78X 80X 81P 82U 83O 83Q 85T 86P 86Z 87Q 89Q 89T 91X 95V 95W 96Q 98W 98X AAF AAL AAR AAW AAY ABL ABQ ABY ACA ACI ADR

AEE AFL AFR AHY AIB

AIC AIJ ALK AMC AMU ANA ANR ANZ

APJ ART ARU ASL ASV

ATR AUA AUH AVA AVJ

AWC AWW AXM AZA AZI B2V BAW BEC BEL BER BGF BGH BHP BIE BJN BKP BRS BSX BTK BTN BUC C2C CBG

CBJ CCA CCM CDC CEB CEF

CES CFG CGH

CHB CQH CQN CRK CSA CSC CSN CSZ CTN CTV

DAL DAT DCS DKH DLH DNU DQA DRK DTR DWI EAA EDW EIN

ELB ETD ETJ EVA EVE EVJ EWG EZY F2I FCB

FFT FHY FIA FIN FJW FLI FRN FTZ G4I G8E

GAF GAP GBB GCA

GCR GFA

GHT GLG GMI GOW GSW GWI GZQ HDA HFY HKE HKJ HRM HTU

HVN HYP I2L I2T IAW IBE IBS IGO IND IRA IRC IRM ISR

ISS IYE IZG JAD JAV JBU JBW JJP JSA JST JZR KAC KAY

KFR KHO KHV KKK KNE KPM KZR LAA LAN LAO LBT LFO LIM

LKE LLC LLM LLP LLX

LMJ LMU LUR

LWA LZB MAC MAU MEA

MJF MJN MLD MLM MLR MMA MON MOV MRJ MSC MSR MXA MYX

NIA NKS NLY NMA NMB NVD NVR NWS OAW OBS OHY OLY OMS

ONE ORF OTF

OZW PAL PGT PIA PIC PKZ PTI QAF QDA QQE QSM QTR R1T RBA RBG RCT RFJ RJA RJD RYW RZO SAA SAI

SAS SBI SDM SEY SFJ SFW SHJ SHU SKU SLK SND SNG SNX

SOL SSG

SUD SVA SVR SVW SWM SWR SYR TAE TAI TAM TAP

TAR TBA TBJ TBZ TCW TCX TDR TGW THD

THY TJS TNA TTW

UAE UAL UEA UJX UKN UNA USA UZB VAR VIM VIP VIV VJC

VKG VLG VNL VOE VOI VRD VRE VTI VVC WGT WHT WOW WRC WZZ

CONCURRENT REQUIREMENTS None

REFERENCES / REPERCUSSIONS TFU None OEB None AOT None SIL None ISI None DATE: Dec 21/12 SERVICE BULLETIN No.: A320-53-1257 REVISION No.: 02 - Nov 29/16 Page: 3 6 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A318/A319/A320/A321

SERVICE BULLETIN

SUMMARY

LINE MAINTENANCE AFFECTED No

LIFE LIMIT None OTHER SBIT 16-0070

NATURE OF THE WORK

AIRCRAFT YES

EQUIPMENT NO HARD NO SOFT NO OBRM NO

MANPOWER **CONF 001 Task 531257-832-848-001: Inspection

TOTAL MANHOURS

50.50

ELAPSED TIME (HOURS)

50.50 **CONF 002 Task 531257-832-848-001: Inspection

TOTAL MANHOURS

46.50

ELAPSED TIME (HOURS)

46.50 **CONF 003 Task 531257-832-848-001: Inspection

TOTAL MANHOURS

46.50

ELAPSED TIME (HOURS)

46.50 **CONF 004 Task 531257-832-848-001: Inspection

TOTAL MANHOURS

50.50

ELAPSED TIME (HOURS)

50.50 **CONF 005 Task 531257-832-848-001: Inspection

TOTAL MANHOURS

46.50

ELAPSED TIME (HOURS)

46.50 **CONF 006 Task 531257-832-848-001: Inspection

TOTAL MANHOURS

50.50

ELAPSED TIME (HOURS)

50.50 DATE: Dec 21/12 SERVICE BULLETIN No.: A320-53-1257 REVISION No.: 02 - Nov 29/16 Page: 4 6 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A318/A319/A320/A321

SERVICE BULLETIN

SUMMARY **CONF 007 Task 531257-832-848-001: Inspection

TOTAL MANHOURS

46.50

ELAPSED TIME (HOURS)

46.50

APPENDICES **CONF ALL Appendix 01 - Inspection Report DATE: Dec 21/12 SERVICE BULLETIN No.: A320-53-1257 REVISION No.: 02 - Nov 29/16 Page: 5 6 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A318/A319/A320/A321

SERVICE BULLETIN

SUMMARY **CONF 001, 004, 006 Z160 Z150 B A FR50 FR51 FR52 FR53 FR54 FR55 FR56 FR57 FR58 FR59 FR60 FR61 FR62 FR63 FR64 N_SB_531257_6_SAAA_01_00

INSPECTION AREA A B Figure A-GSAAA - Sheet 01 DATE: Dec 21/12 SERVICE BULLETIN No.: A320-53-1257 REVISION No.: 02 - Nov 29/16 Page: 6 6 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

Pages 13–24 of 157