Copy · SB A320-71-1069 Rev 01 · 79 pages

© Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2016-8185; AD 2017-13-10 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Text

From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = 'bcdd1b1f889716760befb72f55345094bbc5a1bc1780391a74d53a79bc1b22c4'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

@A318/A319/A320/A321

SERVICE BULLETIN

REVISION TRANSMITTAL SHEET AIRBUS

CUSTOMER SERVICES DIRECTORATE 1 Rond Point Maurice Bellonte 31707 BLAGNAC CEDEX FRANCE T e l:( 3 3 )56 19 33 33 3 Telex : AIRBU 530526F F a x:( 3 3 )56 19 34 25 1

MANDATORY

MANDATORY

MANDATORY ATA SYSTEM: 71 TITLE: POWER PLANT - FAN COWL DOORS - INTRODUCE NEW FAN COWL DOOR LATCH WITH KEY & FLAG ON IAE V2500 ENGINE.

MODIFICATION No.: 157516P14761 157520P14896 157718P14772 This page transmits Revision No.01 of Service Bulletin No.A320-71-1069

ADDITIONAL WORK **CONF ALL No additional work is required by this revision for aircraft modified by any previous issue.

REASON Revision No. 01 issue to add Config. 007 and 008 for aircraft on which MOD No. 157718P14772 is embodied in production.

CHANGES The main changes of this revision are:

- Aircraft operation affected has been updat ed in the GENERAL EVALUATION paragraph

- Accomplishment Timescale updated in COMPLIANCE paragraph

- Note for the Airworthiness Directive has been removed from ACCOMPLISHMENT INSTRUCTIONS paragraph

- Config. 007 and 008 have been added

- EFFECTIVITY paragraph has been updated

- Summary Graphi c A-FSAAC has been added

- PUBLICATION AFFECTED paragraph has been updated

- MATERIAL - PRICE AND AVAIL ABILITY paragraph has been updated

- Body Graphic A -FBAAC has been added DATE: Dec 18/15 SERVICE BULLETIN No.: A320-71-1069 REVISION No.: 01 - Apr 28/16 Page: 1 5 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A318/A319/A320/A321

SERVICE BULLETIN

REVISION TRANSMITTAL SHEET

- Retrofitted Modifications Table has been updated due to the addition of Config 007 and 008.

FRONT MATTER

POWER PLANT - FAN COWL DOORS -

INTRODUCE NEW FAN COWL DOOR

L A T C HW I T HK E Y&F L A GO NI A E V2500 ENGINE.

CONFIGURATION UPDATED R

SUMMARY

GENERAL EVALUATION

GENERAL EVALUATION TABLE UPDATED R

MATERIAL PRICE INFORMATION

MATERIAL PRICE INFORMATION TABLE

UPDATED R

MATERIAL PRICE INFORMATION TABLE

UPDATED R

MATERIAL PRICE INFORMATION TABLE

UPDATED R

MATERIAL PRICE INFORMATION TABLE

UPDATED R

MATERIAL PRICE INFORMATION TABLE

UPDATED R

MATERIAL PRICE INFORMATION TABLE

UPDATED R

MATERIAL PRICE INFORMATION TABLE ADDED N

MATERIAL PRICE INFORMATION TABLE ADDED N

EFFECTIVITY

OPERATOR LIST UPDATED R

MANPOWER

MANPOWER ADDED N

MANPOWER ADDED N Fig. A-FSAAC

FIGURE SOLUTION ADDED N Fig. A-FSAAC Sheet 01

SHEET ADDED N

PLANNING INFORMATION

EFFECTIVITY

EFFECTIVITY RELATED INFORMATION

UPDATED R Configuration definition

CONFIGURATION LIST UPDATED R CONF 001

CONFIGURATION DEFINITION UPDATED R CONF 002

CONFIGURATION DEFINITION UPDATED R CONF 004

CONFIGURATION DEFINITION UPDATED R CONF 005

CONFIGURATION DEFINITION UPDATED R CONF 006

CONFIGURATION DEFINITION UPDATED R CONF 007

CONFIGURATION ADDED N CONF 008

CONFIGURATION ADDED N Material Effectivity

MATERIAL EFFECTIVITY UPDATED

CONFIGURATION UPDATED R

MATERIAL EFFECTIVITY ADDED N

DESCRIPTION

DESCRIPTION UPDATED R

COMPLIANCE Accomplishment Timescale

ACCOMPLISHMENT TIMESCALE UPDATED R

MANPOWER

MANPOWER ADDED N

MANPOWER ADDED N DATE: Dec 18/15 SERVICE BULLETIN No.: A320-71-1069 REVISION No.: 01 - Apr 28/16 Page: 2 5 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A318/A319/A320/A321

SERVICE BULLETIN

REVISION TRANSMITTAL SHEET

WEIGHT AND BALANCE

CONFIGURATION UPDATED R

CONFIGURATION UPDATED R

REFERENCES

REFERENCED DOCUMENTATION ADDED N

REFERENCED DOCUMENTATION ADDED N

PUBLICATION AFFECTED

PUBLICATIONS AFFECTED UPDATED R

INTERCHANGEABILITY/MIXABILITY

INTERCHANGEABILITY/MIXABILITY ADDED N

INTERCHANGEABILITY/MIXABILITY ADDED N

MATERIAL INFORMATION

MATERIAL - PRICE AND AVAILABILITY Price and Availability

PRICE AND AVAILABILITY UPDATED

MATERIAL PRICE UPDATED R

LIST OF MATERIALS - OPERATOR

SUPPLIED Components Component COMPA01

PART MATERIAL SET UPDATED R

ACCOMPLISHMENT INSTRUCTIONS TASK 711069- 831-801-001-Modification

TASK SOLUTION UPDATED

NOTE UPDATED R Task associated data - 007

TASK ASSOCIATED DATA ADDED N Task associated data - 008

TASK ASSOCIATED DATA ADDED N Subtask 711069-910-001-002

SUBTASK SOLUTION ADDED N Subtask 711069-839-001-001

SUBTASK SOLUTION ADDED N Subtask 711069-910-001-002

SUBTASK SOLUTION ADDED N Subtask 711069-839-001-001

SUBTASK SOLUTION ADDED N Subtask 711069-941-001-001

SUBTASK SOLUTION ADDED N Subtask 711069-941-001-001

SUBTASK SOLUTION ADDED N Subtask 711069-831-002-001

SUBTASK SOLUTION UPDATED

MATERIAL LIST UPDATED R Subtask 711069-831-002-001

SUBTASK SOLUTION UPDATED

MATERIAL LIST UPDATED R Subtask 711069-831-002-001

SUBTASK SOLUTION UPDATED

MATERIAL LIST UPDATED R Subtask 711069-831-002-002

SUBTASK SOLUTION UPDATED

MATERIAL LIST UPDATED R Subtask 711069-831-002-002

SUBTASK SOLUTION UPDATED

MATERIAL LIST UPDATED R Subtask 711069-831-002-002

SUBTASK SOLUTION UPDATED

MATERIAL LIST UPDATED R Subtask 711069-831-001-002

SUBTASK SOLUTION ADDED N Subtask 711069-831-002-003

SUBTASK SOLUTION ADDED N Subtask 711069-831-001-002

SUBTASK SOLUTION ADDED N Subtask 711069-831-002-003

SUBTASK SOLUTION ADDED N Subtask 711069-942-001-001

SUBTASK SOLUTION ADDED N Subtask 711069-942-001-001

SUBTASK SOLUTION ADDED N Fig. A-FBAAC

FIGURE SOLUTION ADDED N Fig. A-FBAAC Sheet 01

SHEET ADDED N DATE: Dec 18/15 SERVICE BULLETIN No.: A320-71-1069 REVISION No.: 01 - Apr 28/16 Page: 3 5 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A318/A319/A320/A321

SERVICE BULLETIN

REVISION TRANSMITTAL SHEET Appendix 01 - Retrof itted Modifications

APPENDIX CONTENT

APPENDIX CONTENT UPDATED R

FILLING INSTRUCTIONS This Service Bulletin has been generated electronically and is reissued as a complete document.

Replace the complete document.

Put this Revision Transmittal Sheet in front of the Service Bulletin.

HISTORY OF PREVIOUS REVISIONS No previous revision

REVISION SEQUENCE ORIGINAL: Dec 18/15 REVISION No. : 01 - Apr 28/16 DATE: Dec 18/15 SERVICE BULLETIN No.: A320-71-1069 REVISION No.: 01 - Apr 28/16 Page: 4 5 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A318/A319/A320/A321

SERVICE BULLETIN

SUMMARY AIRBUS

CUSTOMER SERVICES DIRECTORATE 1 Rond Point Maurice Bellonte 31707 BLAGNAC CEDEX FRANCE T e l:( 3 3 )56 19 33 33 3 Telex : AIRBU 530526F F a x:( 3 3 )56 19 34 25 1 This summary is for information only and is not approved for modification of the aircraft.

MANDATORY

MANDATORY

MANDATORY ATA SYSTEM: 71 TITLE: POWER PLANT - FAN COWL DOORS - INTRODUCE NEW FAN COWL DOOR LATCH WITH KEY & FLAG ON IAE V2500 ENGINE.

**CONF ALL

MODIFICATIONS

MODIFICATION CLASSIFICATION MAJOR None MINOR 157516P14761 157520P14896 157718P14772 NOTE : As per EASA IR 21, a minor change is one that has no appreciable effect on the mass, balance, structural strength, reliability, operational characteristics affecting the airworthiness of the product. All other changes are major changes.

REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES Several Fan Cowl Door (FCD) losses have been experienced in service due to non-detection of FCD unlatched condition.

This modification introduces new FCD front latch and keeper on IAE V2500 engines. The proposed design solution contains for each nacelle:

- New FCD front latch and keeper assemblies:

The front latch and keeper are introduced at the front L1 location only. The other latches (L2/L3 and L4 for IAE nacelle) of the FCD remain unchanged

- A new key and flag assembly

- A reworked anti-swivel plate on the latch assembly side

- An additional bracket on the keeper assembly side

- Longer bumper bolt.

The new front latch includes a locking device. A specific key is necessary to open the latch and this key cannot be removed once the latch is opened. A flag "remove before flight" is attached to the key.

DATE: Dec 18/15 SERVICE BULLETIN No.: A320-71-1069 REVISION No.: 01 - Apr 28/16 Page: 1 5 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A318/A319/A320/A321

SERVICE BULLETIN

SUMMARY This flag increases the visibility of an unlatched condition.

The key and "remove before flight" flag assembly will be stored in the cockpit once FCD closure is secured.

The introduction of the new L1 front latch P/N HA2263-1 has led to a modification of the latch handle closing forces on L1, L2, L3 and L4 latches (was "45-55"Lbf -> will be "30-40"Lbf).

The Operational/Maintenance Consequences of this Service Bulletin are covered by the update of the affected publications detailed in "PLANNING INFORMATION".

GENERAL EVALUATION

EVALUATION TABLE

COMPLIANCE MANDATORY (1)

CANCELS INSPECTION SB NO

POTENTIAL AD YES

A/C OPERATION AFFECTED YES

RELIABILITY AFFECTED NO

PAX COMFORT AFFECTED NO

COST SAVING NO

ETOPS AFFECTED NO

STRUCTURAL LIFE EXTN NO

VENDOR SB INVOLVED YES NOTE

(1) : Service Bulletin must be accomplished.

MATERIAL PRICE INFORMATION **CONF 001

MATERIAL PRICE INFORMATION TABLE

MATERIAL SET

QTY PER A/C

PRICE PER

A/C (USD)

MAIN PARTS Component COMPA01 1

51.30 Placard **CONF 002

MATERIAL PRICE INFORMATION TABLE

MATERIAL SET

QTY PER A/C

PRICE PER

A/C (USD)

MAIN PARTS Component COMPA01 1

51.30 Placard **CONF 003

MATERIAL PRICE INFORMATION TABLE

MATERIAL SET

QTY PER A/C

PRICE PER

A/C (USD)

MAIN PARTS Component COMPA01 1

51.30 Placard DATE: Dec 18/15 SERVICE BULLETIN No.: A320-71-1069 REVISION No.: 01 - Apr 28/16 Page: 2 5 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A318/A319/A320/A321

SERVICE BULLETIN

SUMMARY **CONF 004

MATERIAL PRICE INFORMATION TABLE

MATERIAL SET

QTY PER A/C

PRICE PER

A/C (USD)

MAIN PARTS Component COMPA01 1

51.30 Placard **CONF 005

MATERIAL PRICE INFORMATION TABLE

MATERIAL SET

QTY PER A/C

PRICE PER

A/C (USD)

MAIN PARTS Component COMPA01 1

51.30 Placard **CONF 006

MATERIAL PRICE INFORMATION TABLE

MATERIAL SET

QTY PER A/C

PRICE PER

A/C (USD)

MAIN PARTS Component COMPA01 1

51.30 Placard **CONF 007 No Material **CONF 008 No Material

EFFECTIVITY **CONF ALL This Service Bulletin is applicable to this (these) operator(s) :

03Q 03X 15S 20Q 23R 29S 31V 31X 32Q 38W 40N 45O 46U 48P 53Z 66P 69X 74T 86P 87Q 94W 95V 98W 98X

AAL AAR

ABL ACI ADR AEE AIC AIJ ALK AMU ANZ ART ARU ASL ATR

AUH AVA AWC AWW AXM AZI BAW BGH BKP BRS BUC CBJ CCA

CES CHB CQN CSC CSN CSZ CTV DCS DKH DLH DNU DTR DWI EAA ELB ETD ETJ EVA F2I FHY FIN FJW FTZ G8E GAF GBB GCR GFA GMR GWI GZQ HDA HFY HKE HRM HVN I2L I2T IAW

IGO IRA IRC ISR IYE IZG JBU JJP JSA JST KFR KGL KHV

KKK KPM KZR LAN LFO LLC LLM LLP LMJ LMU MEA MHK MLD

MLR MMA MON MRJ MSR MXA MYX NIA NKS NMA NSR NVD NVR

NWS OHY ORF OZW PAL PIC QAF QTR RBA RCT

RJA RNA RYW

SAA SAI SAS SEY SGD

SGG SGQ

SHJ SKU SLK SND SVR SWM

SYR TAE TAI TAM TBZ TGW THA THD THY TNA TTW UAL UJX

UNA USA VAR VAX VIM VIP VIV VLG VOI VTI WGT WHT WOW

WRC WZZ DATE: Dec 18/15 SERVICE BULLETIN No.: A320-71-1069 REVISION No.: 01 - Apr 28/16 Page: 3 5 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A318/A319/A320/A321

SERVICE BULLETIN

SUMMARY

CONCURRENT REQUIREMENTS None

REFERENCES / REPERCUSSIONS TFU

71.13.00.060 OEB None AOT None SIL None ISI None

LINE MAINTENANCE AFFECTED YES

LIFE LIMIT None OTHER None

NATURE OF THE WORK

AIRCRAFT YES

EQUIPMENT YES HARD NO SOFT NO OBRM NO

MANPOWER **CONF 001 Task 711069-831-801-001: Modification

TOTAL MANHOURS

1.50

ELAPSED TIME (HOURS)

1.50 Additional manhours relat ed to Vendor SB; refer to:

Remove and Install the Fan Cowl Door Latch L1 and Keeper on Engines 1 and 2 as per VSB V2500- NAC-71-0331

GOODRICH AEROSTRUCTURES Service Bulletin No. V2500- NAC-71-0331 **CONF 002 Task 711069-831-801-001: Modification

TOTAL MANHOURS

1.50

ELAPSED TIME (HOURS)

1.50 Additional manhours relat ed to Vendor SB; refer to:

Remove and Install the Fan Cowl Door Latch L1 and Keeper on Engines 1 and 2 as per VSB V2500- NAC-71-0331

GOODRICH AEROSTRUCTURES Service Bulletin No. V2500- NAC-71-0331 DATE: Dec 18/15 SERVICE BULLETIN No.: A320-71-1069 REVISION No.: 01 - Apr 28/16 Page: 4 5 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A318/A319/A320/A321

SERVICE BULLETIN

SUMMARY **CONF 003 Task 711069-831-801-001: Modification

TOTAL MANHOURS

1.50

ELAPSED TIME (HOURS)

1.50 Additional manhours relat ed to Vendor SB; refer to:

Remove and Install the Fan Cowl Door Latch L1 and Keeper on Engines 1 and 2 as per VSB V2500- NAC-71-0331

GOODRICH AEROSTRUCTURES Service Bulletin No. V2500- NAC-71-0331 **CONF 004 Task 711069-831-801-001: Modification

TOTAL MANHOURS

1.50

ELAPSED TIME (HOURS)

1.50 Additional manhours relat ed to Vendor SB; refer to:

Remove and Install the Fan Cowl Door Latch L1 and Keeper on Engines 1 and 2 as per VSB V2500- NAC-71-0331

GOODRICH AEROSTRUCTURES Service Bulletin No. V2500- NAC-71-0331 **CONF 005 Task 711069-831-801-001: Modification

TOTAL MANHOURS

1.50

ELAPSED TIME (HOURS)

1.50 Additional manhours relat ed to Vendor SB; refer to:

Remove and Install the Fan Cowl Door Latch L1 and Keeper on Engines 1 and 2 as per VSB V2500- NAC-71-0331

GOODRICH AEROSTRUCTURES Service Bulletin No. V2500- NAC-71-0331 **CONF 006 Task 711069-831-801-001: Modification

TOTAL MANHOURS

1.50

ELAPSED TIME (HOURS)

1.50 Additional manhours relat ed to Vendor SB; refer to:

Remove and Install the Fan Cowl Door Latch L1 and Keeper on Engines 1 and 2 as per VSB V2500- NAC-71-0331

GOODRICH AEROSTRUCTURES Service Bulletin No. V2500- NAC-71-0331 **CONF 007 Task 711069-831-801-001 : Modification

TOTAL MANHOURS

1.25

ELAPSED TIME (HOURS)

1.25 DATE: Dec 18/15 SERVICE BULLETIN No.: A320-71-1069 REVISION No.: 01 - Apr 28/16 Page: 5 5 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A318/A319/A320/A321

SERVICE BULLETIN

SUMMARY Task 711069-831-801-001 : Modification Additional manhours relat ed to Vendor SB; refer to:

Remove and Install the Fan Cowl Door Latch L1 and Keeper on Engines 1 and 2 as per VSB V2500- NAC-71-0331

GOODRICH AEROSTRUCTURES Service Bulletin No. V2500- NAC-71-0331 **CONF 008 Task 711069-831-801-001 : Modification

TOTAL MANHOURS

1.25

ELAPSED TIME (HOURS)

1.25 Additional manhours relat ed to Vendor SB; refer to:

Remove and Install the Fan Cowl Door Latch L1 and Keeper on Engines 1 and 2 as per VSB V2500- NAC-71-0331

GOODRICH AEROSTRUCTURES Service Bulletin No. V2500- NAC-71-0331

APPENDICES **CONF ALL Appendix 01 - Retrofitted Modifications DATE: Dec 18/15 SERVICE BULLETIN No.: A320-71-1069 REVISION No.: 01 - Apr 28/16 Page: 6 5 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A318/A319/A320/A321

SERVICE BULLETIN

SUMMARY **CONF 001 thru 003 B

INSTALLATION OF LABEL, FCD KEY AND FLAG ONTO THE BOX LOCATED AT THE BOTTOM OF 120VU

TYPICAL A FR1 FR13 FR24 B B Z400 Z210 A Z400 MODIFICATION OF THE L1 LATCH AND KEEPER N_SB_711069_5_SAAA_01_04 Figure A-FSAAA - Sheet 01 DATE: Dec 18/15 SERVICE BULLETIN No.: A320-71-1069 REVISION No.: 01 - Apr 28/16 Page: 7 5 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A318/A319/A320/A321

SERVICE BULLETIN

SUMMARY **CONF 004 thru 006

INSTALLATION OF LABEL, FCD KEY AND FLAG ONTO

THE BOX LOCATED AT THE BOTTOM OF COAT STOWAGE A FR1 FR13 FR24 B

TYPICAL B B Z400 Z210 A Z400 MODIFICATION OF THE L1 LATCH AND KEEPER N_SB_711069_5_SAAB_01_04 Figure A-FSAAB - Sheet 01 DATE: Dec 18/15 SERVICE BULLETIN No.: A320-71-1069 REVISION No.: 01 - Apr 28/16 Page: 8 5 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

Pages 13–24 of 79