Copy · FAA-2015-8136_A330-53-3213 R00 · 42 pages

© Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2015-8136; AD 2016-08-04 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Text

From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = 'c4f6b99f46be75b36822cbc3e650f94f55045af4b217939ef35766f293495335'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

@A330

SERVICE BULLETIN

SUMMARY AIRBUS

CUSTOMER SERVICES DIRECTORATE 1 Rond Point Maurice Bellonte 31707 BLAGNAC CEDEX FRANCE T e l:( 3 3 )56 19 33 33 3 Telex : AIRBU 530526F F a x:( 3 3 )56 19 34 25 1 This summary is for information only and is not approved for modification of the aircraft.

MANDATORY

MANDATORY

MANDATORY ATA SYSTEM: 53 TITLE: FUSELAGE - REAR FUSELAG E - INSPECTION FOR SUSPECTED MISSING/NON-CONFORMING F ASTENERS AT SECTION 17 FROM FR59 TO FR66 **CONF ALL

MODIFICATIONS None

REASON/DESCRIPTION/OPERATIONAL CONSEQUENCES Prior to delivery of an A330-200F aircraft, fasteners were found missing at some locations in the rear fuselage area at Section 17, from Frame (FR)59 to FR66.

This Service Bulletin describes a detailed inspection of the fastener installation and condition at the affected locations. In the event that fasteners are missing, damaged or incorrectly installed, this Service Bulletin details the procedure to restore the structure to the approved design intent, with the accomplishment of Modification Service Bulletin No. A330-53-3218.

Accomplishment of this Service Bulletin will make sure that the aircraft will be restored to the original approved design integrity.

The inspection should be scheduled during an extended grounding time of the aircraft, because an evaluation of the inspection results by AIRBUS may be required before next flight.

GENERAL EVALUATION

EVALUATION TABLE

COMPLIANCE MANDATORY (1)

CANCELS INSPECTION SB NO

POTENTIAL AD YES

A/C OPERATION AFFECTED NO

RELIABILITY AFFECTED NO

PAX COMFORT AFFECTED NO

COST SAVING NO

ETOPS AFFECTED NO

STRUCTURAL LIFE EXTN NO

VENDOR SB INVOLVED NO NOTE

(1) : Service Bulletin must be accomplished.

DATE: May 06/14 SERVICE BULLETIN No.: A330-53-3213 REVISION No.: 00 - May 06/14 Page: 1 6 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A330

SERVICE BULLETIN

SUMMARY

MATERIAL PRICE INFORMATION No Material

EFFECTIVITY This Service Bulletin is applicable to this (these) operator(s) :

CRK ETD MAS MNB QTR THY TPA YZR

CONCURRENT REQUIREMENTS None

REFERENCES / REPERCUSSIONS TFU None OEB None AOT None SIL None

LINE MAINTENANCE AFFECTED No

LIFE LIMIT None OTHER None

NATURE OF THE WORK

AIRCRAFT YES

EQUIPMENT NO HARD NO SOFT NO OBRM NO

MANPOWER Task 533213-832-848-001: Inspection

TOTAL MANHOURS

10.25

ELAPSED TIME (HOURS)

10.25

APPENDICES None DATE: May 06/14 SERVICE BULLETIN No.: A330-53-3213 REVISION No.: 00 - May 06/14 Page: 2 6 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A330

SERVICE BULLETIN

SUMMARY **CONF ALL B Z150 A NOTE:

FR60 FR61 A FR59 STGR15LH STGR14LH

INSPECTION AREAS FR58 FR59 FR60 FR61 FR62 FR63 FR66 STGR22ARH STGR24RH STGR25RH STGR27RH STGR38RH STGR45RH FR60A STGR43RH STGR47RH FR59 FR60 FR65 FR66 STGR37RH FR64 FR65 STGR26RH B Z260 FR59A G_SB_533213_6_SAAA_01_02 Figure A-G SAAA - S heet 01 DATE: May 06/14 SERVICE BULLETIN No.: A330-53-3213 REVISION No.: 00 - May 06/14 Page: 3 6 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A330

SERVICE BULLETIN

SUMMARY This Page Intentionally Left Blank DATE: May 06/14 SERVICE BULLETIN No.: A330-53-3213 REVISION No.: 00 - May 06/14 Page: 4 6 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A330

SERVICE BULLETIN AIRBUS

CUSTOMER SERVICES DIRECTORATE 1 Rond Point Maurice Bellonte 31707 BLAGNAC CEDEX FRANCE T e l:( 3 3 )56 19 33 33 3 Telex : AIRBU 530526F F a x:( 3 3 )56 19 34 25 1

MANDATORY

MANDATORY

MANDATORY ATA SYSTEM: 53 TITLE: FUSELAGE - REAR FUSELAG E - INSPECTION FOR SUSPECTED MISSING/NON-CONFORMING F ASTENERS AT SECTION 17 FROM FR59 TO FR66 MODIFICATION No.: None This document contains AIRBUS PROPRIETARY INFORMATION and shall at all times remain the property of AIRBUS; no intellectual property right or licence is granted by AIRBUS in connection with any information contained in it. It is delivered on the express condition that said document and the information contained in it shall be treated as confidential, shall not be used for any purpose other than that for which it is hereby delivered. It shall not be disclosed in whole or in part to third parties and shall not be duplicated in any manner (except for the purposes of performing the tasks described hereunder and provided that any recipient of such document shall comply with the conditions herein), without AIRBUS prior written consent.

1. PLANNING INFORMATION **CONF ALL A. EFFECTIVITY

(1) Models 330-223F 330-243F

(2) Effectivity by MSN 1004 1032 1051 1062 1070 1092 1115 1136 1148 1164 1175 1180 1320 1332 1344 1350 1368 1380 1386 1406 1414 1418 1428

(3) Effectivity by Operator The Operator/MSN relationship is provided for information only and is correct at the time of issue in accordance with the information available to AIRBUS. Any future changes resulting from transfer of an aircraft from one operator to another will not be reflected in this list unless the Service Bulletin is revised for another reason.

OPERATOR MSN CRK 1051 1062 1115 1320 ETD 1032 1070 1414 DATE: May 06/14 SERVICE BULLETIN No.: A330-53-3213 REVISION No.: 00 - May 06/14 Page: 1 6 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A330

SERVICE BULLETIN

OPERATOR MSN MAS 1136 1148 1164 1180 MNB 1332 QTR 1350 1386 1406 THY 1004 1092 1344 1418 TPA 1368 1380 1428 YZR 1175

(4) Configuration by MSN MSN

CONFIGURATION 1004 1032 1051 1062 1070 1092 1115 1136 1148 1164 1175 1180 1320 1332 1344 1350 1368 1380 1386 1406 1414 1418 1428 001

(5) Configuration definition **CONF 001 Config. 001 is valid for all the aircraft given in the effectivity of this Service Bulletin as a standard configuration.

(6) Material Effectivity No Material Set B. CONCURRENT REQUIREMENTS None C. REASON

(1) History Prior to delivery of an A330-200F aircraft, fasteners were found missing at some locations in the rear fuselage area at Section 17, from Frame (FR)59 to FR66.

(2) Objective/Action This Service Bulletin describes a detailed inspection of the fastener installation and condition at the affected locations. In the event that fasteners are missing, damaged or incorrectly installed, this Service Bulletin details the procedure to restore the structure to the approved design intent, with the accomplishment of Modification Service Bulletin No.

A330-53-3218.

(3) Advantages Accomplishment of this Service Bulletin will make sure that the aircraft will be restored to the original approved design integrity.

DATE: May 06/14 SERVICE BULLETIN No.: A330-53-3213 REVISION No.: 00 - May 06/14 Page: 2 6 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A330

SERVICE BULLETIN

(4) Operational/Maintenance Consequences The inspection should be scheduled during an extended grounding time of the aircraft, because an evaluation of the inspection results by AIRBUS may be required before next flight.

D. DESCRIPTION To accomplish this Service Bulletin it is necessary to :

Task 533213-832-848-001: Inspection

(1) At FR59, STGR15 LH, do a Detailed Inspection for Missing Fasteners

(2) At FR59A, STGR45 RH to STGR47 RH, do a Detailed Inspection for Missing Fasteners

(3) At FR60A, STGR26 RH, do a Detailed Inspection for Missing Fasteners

(4) At FR61, STGR14 LH to STGR15 LH, do a Detailed Inspection for Missing Fasteners

(5) At FR64, STGR24 RH, do a Detailed Inspection for Missing Fasteners

(6) At FR65, STGR22A RH, STGR23 RH and STGR25 RH, do a Detailed Inspection for Missing Fasteners

(7) At FR65 to FR66, STGR37 RH, do a Detailed Inspection for Missing Fasteners

(8) At FR65 to FR66, STGR45 RH to STGR46 RH, do a Detailed Inspection for Missing Fasteners

(9) At FR66, STGR27 RH, do a Detailed Inspection for Missing Fasteners E. COMPLIANCE

(1) Classification MANDATORY: Service Bulletin must be accomplished.

(2) Accomplishment Timescale Accomplishment of this Service Bulletin is required within 72 months from Entry Into Service (EIS).

This Service Bulletin has been classified Mandatory. It is expected that an Airworthiness Directive (AD) published by the European Av iation Safety Agenc y (EASA) will be issued to confirm this classification. It is anticipated that the AD will confirm the thresholds given above but reference should be made to the AD for confirmation of the mandated accomplishment timescale.

F. APPROVAL The technical content of this document is approved under the authority of Design Organisation Approv al No. EASA. 21J.031.

DATE: May 06/14 SERVICE BULLETIN No.: A330-53-3213 REVISION No.: 00 - May 06/14 Page: 3 6 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A330

SERVICE BULLETIN If an aircraft listed in the effectivity has a modification or repair embodied that is not of AIRBUS origin, and which affects the content of this Service Bulletin, the operator is responsible for obtaining approval by its airworthiness authority for any adaptation necessary before incorporation of the Service Bulletin.

G. MANPOWER The manpower estimates given in this Service Bulletin are based on the direct labor cost to do the work. These estimates assume that the work will be done by experienced personnel, and may need to be revised upwards to suit operator’s circumstances. The estimates do not include the time to prepare, plan or inspect the work. Manufacture and procurement of parts and tools, drying times for paints, sealants, etc., and general administration work are also not included.

Task 533213-832-848-001: Inspection Get Access

3.50 On Aircraft At FR59, STGR15 LH, do a Detailed Inspection for Missing Fasteners

0.50 At FR59A, STGR45 RH to STGR47 RH, do a Detailed Inspection for Missing Fasteners

0.25 At FR60A, STGR26 RH, do a Detailed Inspection for Missing Fasteners

0.25 At FR61, STGR14 LH to STGR15 LH, do a Detailed Inspection for Missing Fasteners

0.50 At FR64, STGR24 RH, do a Detailed Inspection for Missing Fasteners

0.25 At FR65, STGR22A RH, STGR23 RH and STGR25 RH, do a Detailed Inspection for Missing Fasteners

0.50 At FR65 to FR66, STGR37 RH, do a Detailed Inspection for Missing Fasteners

0.25 At FR65 to FR66, STGR45 RH to STGR46 RH, do a Detailed Inspection for Missing Fasteners

0.50 At FR66, STGR27 RH, do a Detailed Inspection for Missing Fasteners

0.25 Close-Up

3.50

TOTAL MANHOURS

10.25

ELAPSED TIME (HOURS)

10.25 NOTE : The minimum manhours necessary to accomplish this Service Bulletin are those for the Inspection. Depending on the inspection result, additional manhours can apply.

H. WEIGHT AND BALANCE Not Changed I. ELECTRICAL LOAD DATA Not Changed DATE: May 06/14 SERVICE BULLETIN No.: A330-53-3213 REVISION No.: 00 - May 06/14 Page: 4 6 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A330

SERVICE BULLETIN J. REFERENCES Aircraft Maintenance Manual (AMM) 06-20-00 06-31-53 06-41-53 12-34-24 20-21-11 25-53-00 25-54-00 25-55-22 25-80-00 52-30-00 53-00-00 Elec. Std. Practices Manual (ESPM) 20-55-00 Service Bulletin (SB) A330-53-3218 Structural Repair Manual (SRM) 51-42-00 K. PUBLICATION AFFECTED None L. INTERCHANGEABILITY/MIXABILITY Not Applicable M. SPARES None DATE: May 06/14 SERVICE BULLETIN No.: A330-53-3213 REVISION No.: 00 - May 06/14 Page: 5 6 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A330

SERVICE BULLETIN This Page Intentionally Left Blank DATE: May 06/14 SERVICE BULLETIN No.: A330-53-3213 REVISION No.: 00 - May 06/14 Page: 6 6 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A330

SERVICE BULLETIN

2. MATERIAL INFORMATION **CONF ALL A. MATERIAL - PRICE AND AVAILABILITY No Material Set B. INDUSTRY SUPPORT INFORMATION For those aircraft in warranty at the time of such inspection with findings further to inspection as per this Service Bulletin, Airbus will credit the man hours indicated in this Service Bulletin for corrections that are performed on aircraft in warranty at the time of such correction. Credit will be at the agreed inhouse warranty labour rate. Claims for labour allowance should be received not later than 90 days after completion of the last affected warranted aircraft.

AIRBUS will credit the man hours indicated in this Service Bulletin for inspections that are performed on aircraft in warranty at the time of such inspection. Credit will be at the agreed inhouse warranty labour rate. Claims for labour allowance should be received not later than 90 days after completion of the last affected warranted aircraft.

C. LIST OF COMPONENTS No Kit D. LIST OF MATERIALS - OPERATOR SUPPLIED None E. PARTS TO BE RE-IDENTIFIED BY OPERATOR None F. TOOLING None DATE: May 06/14 SERVICE BULLETIN No.: A330-53-3213 REVISION No.: 00 - May 06/14 Page: 7 6 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

@A330

SERVICE BULLETIN This Page Intentionally Left Blank DATE: May 06/14 SERVICE BULLETIN No.: A330-53-3213 REVISION No.: 00 - May 06/14 Page: 8 6 Printed in FRANCE © AIRBUS S.A.S. 2007. All rights reserved.

Pages 13–24 of 42