On this page
Copies · 2
Copies of this document that the FAA filed in AD dockets on regulations.gov, newest revision first. A newer revision may exist.
© Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2013-0365; AD 2013-25-08 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
© Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2013-0365; AD 2013-25-08 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Manufacturer
- Airbus
- Type
- Alert Operators Transmission
- Number
- A29L001-12
- Copies
- 2 files of 1 revision
A newer revision may exist than any OpenAirDocs knows of: check with the manufacturer.
ADs that cite it · 2
Newest first, with the revision each names, as OpenAirDocs read it from the AD’s text: check it against the AD.
Also cited in 2 proposed ADs.
Text · 4
No revision named, the newest copy. From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document. © Airbus S.A.S. Filed by the FAA in regulations.gov docket FAA-2013-0365; AD 2013-25-08 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '23df8ab82e1c534c7bbd8914555ff049bb2e8062b1d904e58b7c3c234031d89d' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '23df8ab82e1c534c7bbd8914555ff049bb2e8062b1d904e58b7c3c234031d89d' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
ALERT OPERATORS TRANSMISSION - ALERT OPERATORS TRANSMISSION
AIRBUS CUSTOMER SERVICES SUBJECT: ATA 29 - CHECK VALVE CAR401 - REPETITIVE INSPECTION POST MOD 201384 OR SB A330-29-3119 R02 / A340-29-4091 R02 (400 N.m TORQUE APPLICATION) OUR REF.: A29L001-12 dated 11 OCT 2012
1. AIRCRAFT AFFECTED All A330 aircraft that have embodied modification 201384 and SB A330-29-3119 at any revision issue All A340-200/300 aircraft that have embodied SB A340-29-4091 at any revision issue.
2. REFERENCED DOCUMENTATION
2.1 APPENDIX Reporting sheet.
2.2 REFERENCES Ref.1: OIT 999.0073/12 dated 21 September 2012 Ref.2: AIRBUS modification 201384: Hydraulic power. Main hydraulic power tighten plug of check valve CAR401 with increased torque value Ref.3: Service Bulletin A330-29-3119 / A340-29-4091 Hydraulic power. Main hydraulic power tighten plug of check valve CAR401 with increased torque value Ref.4: EASA AD N° 2012-0070 dated 25 April 2012 Ref.5: AMM 29-11-53 PB401 Manifold Green Hydraulic System, AMM 29-12-53 PB 401 Manifold Blue Hydraulic System, AMM 29-13-53 PB401 Manifold Yellow Hydraulic System Ref.6: TFU 29.10.00.034 Check valve PN CAR401: hydraulic leakage due to loosening.
3. REASON Recent reports received by AIRBUS regarding the in-service behaviour of the post Ref.2 or Ref.3 check valves, have led to the decision to recommend a repetitive inspection of the check valve fitted with an increased torque.
For more background, please refer to Ref.1 and Ref.6.
3.1 FACTS In the recent months, AIRBUS has received several reports of post Ref.2 or Ref.3 check valves exhibiting signs of rotation (red marking not aligned) with the lockwire reported broken in some instances.
In one particular case, on an A330 post mod Ref.2 aircraft having accumulated 900 FC/ 5500 FH the loosening resulted in the loss of the Yellow system and an In Flight Turn Back.
On another case, an A330 post mod Ref.2 aircraft having accumulated 800 FC/ 5000 FH, signs of loosening (red marking not aligned) were observed on the check valves of the 3 systems with lockwire broken on the Green system.
3.2 CONSEQUENCES The loosening of the check valves P/N CAR401 may result in a hydraulic leak and ultimately in the loss of the associated hydraulic system.
3.3 AIM The aim of this AOT is:
- to recommend to perform a repetitive inspection of the check valves PN CAR401 on post Ref. 2 and Ref.3 aircraft, to detect any signs of loosening and assess the efficiency of the torque increase modification.
- to advise the A330 and A340-200/300 operators to put on hold the application of the Ref.3 service bulletins on in-service aircraft mandated by Ref.4 AD until further notice.
At this stage, the modification Ref.2 remains incorporated on production aircraft until definition of the solution to this issue.
4. SHORT TERM ACTION For all A330 aircraft post mod Ref.2 and all A330 and A340-200/300 post service bulletin Ref.3, perform a repetitive visual inspection of the CAR401 check valves on the 3 hydraulic systems.
4.1 PLANNING AND MANPOWER
4.1.1 ACCOMPLISHMENT TIMESCALE Within 1000 FH after the issuance date of this AOT, perform the inspection actions defined in para 4.2.
Then, repeat the inspection actions defined in para 4.2 every 900 FH.
4.1.2 MANPOWER It is estimated that a total of 2 manhours will be necessary to get access to the inspection area, perform the visual inspection of the check valves and do the close-up.
In case of findings (sign of rotation or broken lockwire), 1 additional hour might be necessary.
4.2 DESCRIPTION The visual inspection of the Green, Blue and Yellow High Pressure manifolds and check valves P/N CAR401 assembly consists of checking any sign of rotation of the check valve head. In case of finding corrective action must be applied.
4.2.1 ACCESS Gain access to the Main Landing Gear Bay area and apply the safety precautions as described in the AMM REF 5:
- Put WARNING NOTICE(S) in position to tell people not to pressurize the Green, Blue and/or Yellow hydraulic system:
- In the cockpit, on the panel 245VU,
- On the ground service panel of the Green, Blue and/or Yellow hydraulic system, access door 197BB, 195BB or 196BB as applicable.
- If needed, in case of finding, put a CONTAINER 5 L (1.32 USGAL) below the check valves to collect the hydraulic fluid leakage.
4.2.2 INSPECTION REQUIREMENTS Visually inspect the Green, Blue and Yellow HP manifold and check valves P/N CAR401 (FIN 5316JM101, 5316JM102, 5316JM201, 5316JM301) and check their red paint marking for any signs of rotation. Check also for any signs of hydraulic fluid leakage or seepage.
In case of finding, before next flight, perform the instructions in para 4.2.3. Fill in the reporting sheet attached in appendix and send it to Airbus. Then repeat inspection actions defined in para 4.2 every 900FH.
In case of no finding (no sign of rotation, no sign of hydraulic seepage), perform the close-up procedure of the AMM Ref. 5. Fill in the reporting sheet attached in appendix and send it to Airbus. Then repeat inspection actions defined in para 4.2 every 900FH.
The inspection results will be used by Airbus in order to define the next course of action regarding CAR401 check valve loosening.
4.2.3 FINDINGS
(a) If signs of rotation have been observed (red marking not aligned and/or lockwire broken), but if no seal distress or black deposit / hydraulic fluid seepage has been observed,
- Record the distance between the original paint markings and take a photo if possible
- Cut and discard the lockwire
- Using a calibrated dynamometric wrench, apply a torque of 141 to 143 N.m (103.98 to
105.45 lbf.ft) to the applicable CAR401 check valve.
- Record the distance between the original markings (and take a photo if possible).
- Remove the original paint marking and apply a new thin paint line on the check valve and manifold as per AMM task 20-23-22.
- Install a new lockwire (material N°19-010) as per AMM 20-11-11.
- Remove the placard PN F8537020725000 (CAR401 400 N.M OFF A/C) .
- Perform the test and close-up procedures as per AMM Ref.5.
- Fill in the reporting sheet and send it to AIRBUS at the earliest opportunity.
(b) If seal distress or black deposit /hydraulic seepage has been observed.
- Cut and discard the lockwire.
- Remove the applicable check valve following AMM Ref.5.
NOTE 1: It is highly probable that the initial torque has been lost and it is advised to apply no more than 143 N.m torque to loosen the check valve on aircraft.
NOTE 2: In case a higher torque value is required to remove the check valve, it is necessary to remove the manifold from the aircraft as per AMM Ref.5.
- Replace the seals as per AMM Ref.5.
- Install the removed check valve as per AMM Ref.5.
- Using a calibrated dynamometric wrench, apply a torque of 141 to 143 N.m (103.98 to
105.45 lbf.ft) to the applicable CAR401 check valve.
- Record the distance between the markings (and take a photo if possible).
- Remove the original paint marking and apply a new thin paint line on the check valve and manifold as per AMM task 20-23-22.
- Install a new lockwire (material N°19-010) as per AMM 20-11-11.
- Remove the placard PN F8537020725000 (CAR401 400 N.M OFF A/C).
- Perform the test and close-up procedures as per AMM Ref. 5.
- Fill in the reporting sheet and send it to AIRBUS at the earliest opportunity.
NOTE 3: even in case of finding on only one check valve from the Green manifold on which 2 valves are installed, the placard (CAR401 400 N.M OFF A/C) must be removed.
4.3 SPARES AND TOOLING Refer to AMM Ref. 5 NOTE 4: at each replacement of a check valve P/N CAR401, a torque of 141 to 143 N.m
(103.98 to 105.45 lbf.ft) must be applied to the replacement check valve P/N CAR401 during installation.
5. FURTHER INFORMATION
5.1 FOLLOW-UP PLAN It is anticipated that the content of this AOT will be rendered mandatory by the EASA. It is expected that a new AD superseding REF 4 will be issued shortly.
Airbus has launched further engineering activities aiming to define a solution that will be the terminating action to the repetitive inspection introduced by this AOT.
Further follow-up will be ensured through TFU Ref.6.
5.2 IMPACTED DOCUMENTATION Airbus has launched a review of the AMM tasks Ref. 5 to make them aligned with the content of this AOT. It is expected that a Temporary Revision will be issued early November 2012.
6. AOT APPROVAL The technical content of this AOT is approved under the authority of DOA nr. EASA.21J.031
7. REPORTING
Operators are requested to acknowledge receipt of this AOT within 48 hours after receipt to:
Laetitia BONNET, SEEL E-mail: laetitia.bonnet@airbus.com Fax number +33 (0)5 67 19 12 05 Questions about this AOT and inspection results with or without findings are to be sent to Airbus Customer Services engineering, as soon as possible after the AOT application, to the attention of:
André DONNADIEU Engineer Hydraulic Systems - SEEL4 Customer Services Phone 33 5 61 18 23 21 Fax 33 5 67 19 12 05 Mail to: andre.donnadieu@airbus.com And Stephane ACOSTA Engineer Hydraulic Systems - SEEL4 Customer Services Phone 33 5 61 93 04 11 Fax 33 5 67 19 12 05 Mail to: stephane.acosta@airbus.com Best regards.
Jean-luc MOUYSSETPhilippe GOURDON