Copy · U.S. DOT/FAA - Service Bulletin (3) · 21 pages

© BAE Systems. Filed by the FAA in regulations.gov docket FAA-2011-0230; AD 2011-11-01 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextOCR

This text is OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = 'eceac1e4727b9ab96664919885cecf70135f06046c7a710c4f82ca014633c4ae'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Page 1OCROpen in PDF

BRITISH AERO SPAC

JETSTREAM SERIES 3100 & 3200

SERVICE BULLETIN

SERVICE BULLETIN

BAE SYSTEMS,

PRESTWICK INTERNATIONAL AIRPORT, AYRSHIRE, KA9 2RW, SCOTLAND.

32-JA090240 WINGS - INSPECTION OF MAIN UNDERCARRIAGE FITTING.

INSPECTION

1. PLANNING INFORMATION A. Effectivity All HP 137 Mk 1, Jetstream series 200, Jetstream series 3100 and Jetstream series 3200 aircraft, which are post modification JM5218 or post modification JM8003.

B. Reason As a result of the fatigue testing programme on the Jetstream fatigue test specimen, cracks have been found on the post modification standard of main undercarriage fitting (part no. 1379133B1/2/3/4). Analysis of this failure indicates that an inspection regime will have to be implemented in order to ensure that the fitting can continue to be used beyond 41,000 landings.

C. Description A Non-Destructive Test Examination is carried out on the main landing gear pivot beam attachment fastener bores.

This service bulletin has an effect on the main landing gear.

The tasks are as follows:

Make aircraft safe for servicing.

Jack aircraft.

Remove main undercarriage legs.

Carry out NDT examination.

Report any cracks or discontinuities.

Install main undercarriage legs.

Test main undercarriage system.

Lower aircraft from jacks.

Amend aircraft records.

ORIGINAL ISSUE: 29/04/09 32-JA090240 PAGE 1 BAE SYSTEMS (Operations) Limited Printed in the U.K.

Page 2OCROpen in PDF

JETSTREAM BRITISH SERIES 3100 & 3200

SERVICE BULLETIN D. Manpower 16 manhours.

Mechanical skills are necessary.

E. Material - Cost and Availability None F. Tooling - Price and Availability The equipment necessary to accomplish this service bulletin is listed in Para 2.B. and in report number STR/J32/085 (BAE/MAN/J32/EDD/17).

G. Weight and Balance None.

H. Aircraft Noise Levels Aircraft noise is not affected.

Electrical Load Data Not affected.

J. Software Accomplishment Summary Not applicable.

K. References Aircraft Maintenance Manual, Chapter 32.

Report Number: STR/JS32/085.

Service Bulletin 05-JA 010642.

L. Publications Affected NOTE: The maintenance review board report and maintenance planning document will be reviewed, for possible inclusion of a scheduled maintenance task.

Operators are requested to advise The Project Manager, Airline Maintenance & Fublication Services, BAE SYSTEMS, Regional Aircraft, Prestwick International Airport, Ayrshire, KA9 2RW, SCOTLAND, of the accomplishment of this service bulletin.

M. Family Tree Of Modification Relationships Not applicable.

ORIGINAL ISSUE: 29/04/09 32-JA090240 PAGE 2 BAE SYSTEMS (Operations) Limited.

Printed in the U.K.

Page 3OCROpen in PDF

RITISH AEROSPAC

JETSTREAM SERIES 3100 & 3200

SERVICE BULLETIN N. Approval A threshold inspection of the main undercarriage fitting should be made at 41,000 landings with a repeat inspection every 27,000 landings. Any aircraft in excess of 39,000 landings must inspect within a period of 2000 landings.

NOTE: The accumulated landings for the main undercarriage fitting should be evaluated using Para 2.A.

The technical content of this service bulletin is the subject of EASA Airworthiness Directive consultation, and is approved under the authority of Design Organisation Approval No. EASA.21J.047.

Signed Date 30/419 EASA Part 21 Approval EASA:21J.047.

ORIGINAL ISSUE: 29/04/09 32-JA090240 PAGE 3 BAE SYSTEMS (Operations) Limited Printed in the U.K

Page 4OCROpen in PDF

BRITISH AEROSPAC

JETSTREAM SERİES 3100 & 3200

SERVICE BULLETIN

PAGE LEFT INTENTIONALLY BLANK ORIGINAL ISSUE: 29/04/09 32-JA090240 PAGE 4 BAE SYSTEMS (Operations) Limited.

Printed in the U.K.

Page 5OCROpen in PDF

FRITISH AEROSPACE

JETSTREAM SERIES 7100 & 3200

SERVICE BULLETIN

2. ACCOMPLISHMENT INSTRUCTIONS

DUPLICATE INSPECTION

WHENEVER ANY PART OF THIS SYSTEM IS DISMANTLED, ADJUSTED, REPAIRED OR

RENEWED, DETAILED INVESTIGATION MUST BE MADE ON COMPLETION TO ENSURE

THAT DISTORTION, TOOLS, RAGS OR ANY OTHER LOOSE ARTICLES OR FOREIGN

MATTER SUCH AS COULD IMPEDE THE FREE MOVEMENT AND SAFE OPERATION OF

THE SYSTEM ARE NOT PRESENT AND THAT THE SYSTEMS AND INSTALLATIONS IN THE WORK AREA ARE CLEAN.

WHENEVER ANY PART OF EITHER THE MAIN OR ANY OTHER ASSOCIATED SYSTEM

IS DISMANTLED, ADJUSTED, REPAIRED OR RENEWED, THAT PART OF THE SYSTEM

THAT HAS BEEN DISTURBED SHALL BE SUBJECTED TO A DUPLICATE INSPECTION

FOR SECURITY OF LOCKING DEVICES, FULL AND FREE MOVEMENT, DIRECTION AND

TENSION CHECKS AND, FOR AIRCRAFT ON THE BRITISH REGISTER, THE

COMPLETION OF THIS WORK SHALL BE CERTIFIED IN ACCORDANCE WITH THE BRITISH CIVIL AIRWORTHINESS REQUIREMENTS, SECTION A, CHAPTER A6-2 OR IN

THE CASE OF AIRCRAFT NOT ON THE BRITISH REGISTER, THE EQUIVALENT NATIONAL STANDARD.

WARNING: MAKE SURE THE AIRCRAFT AND THE AIRCRAFT SYSTEMS ARE MADE

SAFE AS DETAILED IN THE APPLICABLE CHAPTERS OF THE AIRCRAFT MAINTENANCE MANUAL.

NOTE: Abbreviations used in the accomplishment instructions of this service bulletin are:

AMM - Aircraft Maintenance Manual.

A. Evaluation If the actual service life of the main undercarriage fitting is unknown, the aircraft records should be investigated to determine if the component has been replaced in-service. If there is no evidence contained in the aircraft records to indicate that the fitting has been replaced, operators are to assume that the component has accumulated the same number of landings as the airframe.

Where the main undercarriage fitting has been replaced in-service with a new component, operators are to assume that the fitting has accumulated the same number of landings as the airframe since the replacement was installed.

For instances where the main undercarriage fitting has been replaced in-service with a used component and the history of the component is known, operators are to assume that the fitting has accumulated a total number of landings equal to the same number of landings as the airframe since the replacement component was installed plus the number of landings accumulated by the fitting prior to installation on the aircraft. If there is any uncertainty over the integrity of the history of the part then the fitting should be assumed to have reached the inspection threshold and therefore should be inspected by NDT.

ORIGINAL ISSUE 29/04/09 32-JA090240 PAGE 5 BAE SYSTEMS (Operations) Limited.

Printed in the U.K.

Page 6OCROpen in PDF

BRITISH AEROSPACE

JETSTREAM SERIES 2100 & 3200

SERVICE BULLETIN For instances where the main undercarriage fitting has been replaced in-service with a used component, and the history of the component is unknown, operators are to assume that the fitting has reached the inspection threshold and therefore should be inspected by NDT.

B. Equipment

(1) The following equipment was used during the development of this inspection and found to be acceptable:

Instrument: Elotest B1 v4 phase analysis eddy current instrument with B1- RS connector from Rohmann (UK) Ltd.

(b) Rotor: Mini rotor from Rohmann (UK) Ltd.

(c) Probe 1: 3/8 in. diameter probe to fit the mini rotor part no. MRRP-RUK-1-0.375 in (9.53 mm) - 2 in. (50.8 mm) from Rohmann (UK) Ltd.

Probe 2: ½ in. diameter probe to fit the mini rotor part no. MRRP-RUK-1-0.5 in. (12.7 mm) - 2 in. (50.8 mm).

from Rohmann (UK) Ltd.

Probe 3: 7/8 in. diameter probe to fir the mini rotor part no. MRRP-RUK-1-0.875 in. (22.23 mm) - 2 in. (50.8 mm).

from Rohmann (UK) Ltd.

(d) Lead: RK-2-N/1 from Rohmann (UK) Ltd.

(e) Calibration Standard: Aluminium alloy calibration block for rotating (dynamic) eddy currents, cross drilled hole type (refer to NTM Part 6, 20-00-00).

NOTE: Any comparable eddy current equipment may be used provided it satisfies the requirements of this instruction, and is capable of resolving the reference hole in the calibration standard at the required level of sensitivity.

ORIGINAL ISSUE: 29/04/09 32-JA090240 PAGE 6 BAE SYSTEMS (Operations) Limited.

Printed in the U.K.

Page 7OCROpen in PDF

SHILON AEROSPEC

JETSTREAM SERIES 3100 & 7200

SERVICE BULLETIN C. Preparation.

(1) Instrument calibration:

Initial Settings: Refer to manufacturers instructions.

Alarm: Off Frequency: Set to 500 kHz Gain: Set to produce required sensitivity Pre-amp: 30 dB Y spread: 0 dB X spread: 0 dB Filter: Band: Set to Dynamic High pass: Set to 500Hz Low pass: Set to 2.5kHz Bandwidth Limiter: Set to Off Dot Position: Reference figure 2

(2) Sensitivity settings:

(a) Select spot display (YIX).

(b) Using the appropriate probe, adjust the instrument to produce a vertical signal from the 1/16 in. (1.58 mm) diameter cross drilled hole in the calibration standard.

(c) Select time base display (Y/T).

(d) Set signal from 1/16 in. (1.58 mm) diameter hole to 100 per cent full screen height (FSH).

(e) Select spot display (Y-X).

Set the signal from the 1/16 in. (1.58 mm) diameter hole to 30 degrees anticlockwise.

(3) Make aircraft safe for servicing:

(a) Refer to AMM 07-10-00, raise aircraft on jacks.

(p) Refer to AMM 32-10-11, remove main undercarriage leg.

ORIGINAL ISSUE: 29/04/09 32-JA090240 PAGE 7 BAE SYSTEMS (Operations) Limited.

Printed in the U.K.

Page 8OCROpen in PDF

IRITISH AEROSPAC JETSTREAM SERIES 7100 & 3200

SERVICE BULLETIN D. Accomplishment Make certain the main undercarriage leg pivot beam fastener bores are clean and free from burrs:

(a) Refer to Figure 1 and visually check the inspection areas for any obvious damage prior to inspection.

(2) Inspection procedure:

(a) Select spot (Y/X) display.

Insert the probe into the first bore to be inspected and scan the full length of the bore.

(c) By careful manipulation, maximise and observe any signals.

(d) Make sure that the sensitivity is reset for each different probe used, and that operations (a) to (b) are repeated for each fastener bore to be inspected.

NOTE: A large signal indicating the presence of mechanical damage is produced in each 7/8 in. (22.23 mm) diameter bore at the point where it is intersected by another 7/16 in. (11.11 mm) diameter fastener bore (Ref.

Figure 1). This mechanical signal is caused by the intersecting fastener bore and should not be reported.

(3) Interpretation:

(a) Interpret signais by reference to Figure 3.

(b) Select time base (Y/T) display to ascertain the amplitude and direction of any signal.

(4) Accept / Reject criteria:

(a) Vertical signals over 20 per cent FSH that can not be attributed to probe handling or material interfaces shall be considered as a crack.

Signals greater than 40 per cent FSH, irrespective of signal angle, that can not be attributed to probe handling or material interfaces shall be investigated and reported.

NOTE 1: When reporting a crack or discontinuity, select time base (YIT) display to ascertain its amplitude and direction.

NOTE 2: The word discontinuity is a generic term for faults such as cracks, corrosion and mechanical damage.

ORIGINAL ISSUE: 29/04/09 32-JA090240 PAGE 8 BAE SYSTEMS (Operations) Limited.

Printed in the U.K.

Page 9OCROpen in PDF

RITISH AEROSPAC

JETSTREAM SERIES 3100 & 7200

SERVICE BULLETIN E. Recovery

(1) Repair:

(a) Repair any cracks or discontinuities found in accordance with the SRM or contact BAE SYSTEMS Repair Design Office for an approved repair scheme. Make aircraft safe for servicing.

(2) Reinstall:

(a) Refer to AMM 32-10-11, replace main undercarriage leg.

(b) Refer to AMM 07-10-00, lower and remove jacks.

(3) Aircraft records:

(a) Add service bulletin number 32-JA090240 to the aircraft records.

(b) All crack and discontinuity indications are to be recorded in the relevant aircraft documentation, and the appropriate BAE SYSTEMS approved repair/rectification taken.

(4) Reporting procedure:

(a) Report all cracks discontinuities to:

Fleet Data Department (Building 37)

BAE SYSTEMS Regional Aircraft Prestwick International Airport Ayrshire Scotland KA9 2RW

(b) Also send the following information:

1 Aircraft construction number.

2 Aircraft registration.

Flying hours and number of landings.

4 SB number.

5 Location and area or length of crack or discontinuity per cent FSH.

NOTE: Operators are reminded of the necessity to inform The Project Manager, Airline Maintenance & Publication Services, BAE SYSTEMS, Prestwick, of the accomplishment of this service bulletin in order to obtain the necessary revisions for the affected manuals, see paragraph 1.K. Publications Affected, of this bulletin.

ORIGINAL ISSUE: 29/04/09 32-JA090240 PAGE 9 BAE SYSTEMS (Operations) Limited.

Printed in the U.K.

Page 10OCROpen in PDF

BRITISH AEROSPACE JETSTREAM SERIES 3100 & 7200

SERVICE BULLETIN

PAGE LEFT INTENTIONALLY BLANK ORIGINAL ISSUE: 29/04/09 32-JA090240 PAGE 10 BAE SYSTEMS (Operations) Limited Printed in the U.K

Page 11OCROpen in PDF

BRITISH AEROSPACE

JETSTREAM SERIES 3100 & 3200

SERVICE BULLETIN MAIN

UNDERCARRIAGE

FITTING (REF)

MAIN LANDING

GEAR LEG (REF) FWD

INSPECT

0.875in (22.23mm) DIA BORE

0.437in (11.11mm) DIA

BORE INTERSECTS BORE TO BE INSPECTED.

SIGNALS CAUSED BY

THIS BORE LEFT SHOWN

SHOULD NOT RIGHT SIMILAR

BE REPORTED (DETAIL REMOVED

FOR CLARITY)

INSPECT

0.375in (9.53mm) DIA INSPECT BORE INSPECT 0.375in (9.53mm) DIA

0.5in (12.7mm) DIA BORE BORE NOTE:

IT IS REQUIRED THAT THE MAIN

UNDERCARRIAGE LEG IS REMOVED

WHEN CARRYING OUT THIS INSPECTION

VIEW LOOKING VIEW LOOKING

FORWARD AFT J3200004 Area of Inspection - Main Landing Gear Pivot Beam Figure 1 ORIGINAL ISSUE: 29/04/09 32-JA090240 PAGE 11 BAE SYSTEMS (Operations) Limited Printed in the U.K.

Page 12OCROpen in PDF

BRITISH

JETSTREAM SERIES 3100 & 3200

SERVICE BULLETIN 100% FSH 75% FSH 50% FSH 25% FSH TYPICAL ELOTEST B1 v4 SCREEN DISPLAY FOR

0.0625in (1.58mm) HOLE IN CALIBRATION STANDARD

Y/T DISPLAY 100% FULL SCREEN HEIGHT 100% FSH 75% FSH 50% FSH 25% FSH TYPICAL ELOTEST B1 v4 SCREEN DISPLAY FOR

0.0625in (1.58mm) HOLE IN CALIBRATION STANDARD

Y/X DISPLAY 30 DEGREES ANTI-CLOCKWISE 100% FSH 75% FSH 50% FSH 25% FSH TYPICAL ELOTEST B1 v4 SCREEN DISPLAY

FOR TIGHT FATIGUE CRACK

Y/X DISPLAY J3200005 Instrument Calibration - Screen Display Figure 2 ORIGINAL ISSUE: 29/04/09 32-JA090240 PAGE 12 BAE SYSTEMS (Operations) Limited.

Printed in the U.K.

Pages 13–21 of 21