Copy · SB 57-JA140140 R0 · 38 pages

© BAE Systems. Filed by the FAA in regulations.gov docket FAA-2015-1744; AD 2015-16-06 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '715f6107bfe8f198eb1f41e4fb95689f6eda93833ff85fdbbdb0337a631e800b'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

ORIGINAL ISSUE JUN 26/14 57-JA140140 PAGE 1 OF 2

SERVICE BULLETIN

BAE SYSTEMS (OPERATIONS) LIMITED,

PRESTWICK INTERNATIONAL AIRPORT, AYRSHIRE, KA9 2RW, SCOTLAND.

57-JA140140

TRANSMITTAL SHEET

This page transmits the original issue of Service Bulletin 57-JA140140.

TITLE: WINGS - INSPECTION OF WING MAIN SPAR AROUND RIB 36

INSPECTION

REASON During fatigue testing of the wing, cracking was discovered in the wing main spar at rib 36. If the cracking is not detected a failure of the wing may occur.

INSTRUCTIONS FOR INCORPORATION Add complete Service Bulletin pages 1 to 34 at Original Issue.

SERVICE BULLETIN 57-JA140140 ORIGINAL ISSUE JUN 26/14

BLANK

ORIGINAL ISSUE JUN 26/14 57-JA140140 PAGE 1 OF 34

SERVICE BULLETIN

BAE SYSTEMS (OPERATIONS) LIMITED,

PRESTWICK INTERNATIONAL AIRPORT, AYRSHIRE, KA9 2RW, SCOTLAND.

57-JA140140 TITLE: WINGS - INSPECTION OF THE WING MAIN SPAR ARO UND RIB 36

INSPECTION

1. PLANNING INFORMATION A. Effectivity All Jetstream 3200 Series aircraft, Post Mod JM8229.

B. Reason Life extension programme requirement.

C. Description The main spar inboard of rib 36 is inspected by X-ray. The main spar fasteners at rib 36 and outboard of rib 36 are removed and a rotary eddy current inspection is performed.

An access hole is drilled into the wing bottom skin to allow a rotary eddy current inspection of the underlying tooling hole in the main spar at rib 36.

Work comprises:-

- De-fuel the aircraft.

- Jack and trestle the aircraft.

- Remove wing to fuselage fairing panels and wing a ccess panels, sufficient to allow removal of the rib 36 bottom external straps (2 off).

- Remove the rib 36 bottom external straps.

- The single row of 3/16 in. (4.7 mm) dia. counters unk fasteners inboard of rib 36 (2 off), that pass through the main spar only, are removed and a rotary eddy current inspection is performed on the holes.

- Rotary eddy current inspection is performed on th e single row of 1/4 in. (6.35 mm) dia. fastener holes at rib 36 (2 off).

- The 8 rows of 3/16 in. (4.7 mm) dia. countersunk fasteners outboard of rib 36 (20 off) that pass through the bottom skin and main spar, are removed and a rotary eddy current is performed on the holes.

- The position of the rib 36 tooling hole in the ma in spar is located on the wing bottom skin. The position of the tooling hole is located using an eddy current probe.

- A hole is drilled through the wing bottom skin to reveal the underlying tooling hole in the main spar at rib 36.

- The PSR sealant within the tooling hole is cleane d out and a rotary eddy current inspection is performed on the tooling hole.

- X-ray inspection is performed on the main spar in board of rib 36.

SERVICE BULLETIN 57-JA140140 ORIGINAL ISSUE JUN 26/14 D. Manpower 96 man-hours (Including 4 hours for eddy current and 3 hours to perform radiography) Mechanical skills are necessary.

E. Material - Cost and Availability None.

F. Weight and Balance Not affected.

G. Aircraft Noise Levels Aircraft noise is not affected.

H. Electrical Load Data Not affected.

I. Software Accomplishment Summary Not applicable.

J. References

- Aircraft Maintenance Manual, Chapters 06, 07 and 28.

- Non-Destructive Inspection Manual, Chapter 20.

- Structural Repair Manual, Chapter 51.

K. Publications Affected None.

Operators are requested to advise the Business Support Team, Technical Publications, BAE SYSTEMS (Operations) Limited, Prestwick International Airport, Ayrshire, KA9 2RW, SCOTLAND of the accomplishment of this service bulletin and request the necessary revisions for the affected manuals.

L. Family Tree Of Modification Relationships Not applicable.

SERVICE BULLETIN ORIGINAL ISSUE JUN 26/14 57-JA140140

M. Approval The initial inspections must be performed at or before 54 000 landings.

The inspections have to be repeated thereafter every 14 300 landings.

The technical content of this service bulletin is to be the subject of EASA Airworthiness Directive consultation.

The technical content of this service bulletin is approved under the authority of Design Organisation Approval No. EASA.21J.047.

SERVICE BULLETIN 57-JA140140 ORIGINAL ISSUE JUN 26/14

BLANK PAGE

SERVICE BULLETIN ORIGINAL ISSUE JUN 26/14 57-JA140140

2. ACCOMPLISHMENT INSTRUCTIONS

DUPLICATE INSPECTION

WHENEVER ANY PART OF THIS SYSTEM IS DISMANTLED, ADJUSTED, REPAIRED OR

RENEWED, DETAILED INVESTIGATION MUST BE MADE ON COMPLETION TO ENSURE

THAT DISTORTION, TOOLS, RAGS OR ANY OTHER LOOSE ARTICLES OR FOREIGN

MATTER SUCH AS COULD IMPEDE THE FREE MOVEMENT AND SAFE OPERATION OF

THE SYSTEM ARE NOT PRESENT AND THAT THE SYSTEMS AND INSTALLATIONS IN THE WORK AREA ARE CLEAN.

WHENEVER ANY PART OF EITHER THE MAIN OR ANY OTHER ASSOCIATED SYSTEM

IS DISMANTLED, ADJUSTED, REPAIRED OR RENEWED, THAT PART OF THE SYSTEM

THAT HAS BEEN DISTURBED SHALL BE SUBJECTED TO A DUPLICATE INSPECTION

FOR SECURITY OF LOCKING DEVICES, FULL AND FREE MOVEMENT, DIRECTION AND

TENSION CHECKS AND, FOR AIRCRAFT ON THE BRITISH REGISTER, THE

COMPLETION OF THIS WORK SHALL BE CERTIFIED IN ACCORDANCE WITH THE BRITISH CIVIL AIRWORTHINESS REQUIREMENTS, SECTION A, CHAPTER A6-2 OR IN

THE CASE OF AIRCRAFT NOT ON THE BRITISH REGISTER, THE EQUIVALENT NATIONAL STANDARD.

WARNING: MAKE SURE THE AIRCRAFT AND THE AIRCRAFT SY STEMS ARE MADE

SAFE AS DETAILED IN THE APPLICABLE CHAPTERS OF THE AIRCRAFT MAINTENANCE MANUAL.

WARNING: THE MINIMUM CLEARANCE BETWEEN MOVING AND S TRUCTURAL PARTS MUST BE 0.2 IN (5.1 MM) UNLESS OTHERWISE STATED.

CAUTION: TO AVOID DAMAGE, MAKE SURE BEFORE MOVING C ONTROLS THAT

CONTROL RUNS AND CONTROL SURFACES ARE FREE FROM OBSTRUCTION.

CAUTION: TAKE CARE NOT TO DAMAGE STRUCTURE WHEN MAT ERIAL IS CUT OR DRILLED. REMOVE ALL UNWANTED MATERIAL FROM THE WORK AREA.

CAUTION: IF AN ELECTRICAL CONNECTION OR CONNECTOR I S DISMANTLED,

ASSEMBLED OR REPLACED, DO A CONTINUITY CHECK AND, IF

APPLICABLE, A SCREEN BONDING CHECK BEFORE THE ASSEMBLY IS CONNECTED TO EQUIPMENT.

NOTE: Abbreviations used in the accomplishment inst ructions of this service bulletin are:

AMM - Aircraft Maintenance Manual.

A/R - As Required.

FSH - Full Screen Height.

NDI - Non-Destructive Inspection.

NDT - Non-Destructive Testing.

SRM - Structural Repair Manual.

SERVICE BULLETIN 57-JA140140 ORIGINAL ISSUE JUN 26/14 A. Preparation

(1) Refer to AMM Chapter 12-10-28. De-fuel the airc raft.

(2) Jack and trestle the aircraft in accordance wit h AMM Chapter 07-10-00. Wing jacks are to be located at wing Stn. 36.

B. Accomplishment Inspection

(1) Remove wing to fuselage fairing panels and wing access panels, sufficient to allow removal of the rib 36 bottom external straps (2 off).

(2) Refer to Figures 1 and 2. Remove the rib 36 bot tom external straps.

NOTE: To remove the bolts through the straps, skin and main spar at rib 36 (2 off), it may be necessary to:

(a) Remove the sealing block above the main spar. T his may result in having to replace the sealing block and anchor nuts.

(b) Drill the countersunk heads off the 2 bolts at rib 36, remove the external straps and remove the remaining length of bolts using a stud puller.

(3) After removal of the external straps, re-fasten rib 36 to the bottom skin with temporary fasteners.

(4) Perform a rotary eddy current inspection, in ac cordance with Appendix 1, on the single row of 1/4 in. (6.35 mm) dia. fastener holes at rib 36 (2 off).

(5) Remove the single row of 3/16 in. (4.7 mm) dia. countersunk fasteners inboard of rib 36 (2 off) that pass through the main spar only. Perform a rotary eddy current inspection of the holes in accordance with Appendix 1.

(6) Remove the 8 rows of 3/16 in. (4.7 mm) dia. cou ntersunk fasteners outboard of rib 36 (20 off) that pass through the bottom skin and main spar. Only 50% of the fasteners may be removed at any one time. Perform a rotary eddy current inspection of the holes in accordance with Appendix 1.

(7) Refer to Figure 2. Locate the position of the u nderlying tooling hole in the main spar using the dimensions shown on Figure 2. and mark the approximate position on the bottom skin. This mark is intended only as a guide to where the tooling hole is located.

(8) Confirm the position of the main spar underlyin g tooling hole using the NDT technique contained in Appendix 1.

(9) Insert shim steel between the bottom skin (and doubler) and the main spar at the location of the tooling hole in order to protect the main spar during the drilling operation. If necessary, remove fasteners attaching the landing angle to the bottom skin (and doubler).

SERVICE BULLETIN ORIGINAL ISSUE JUN 26/14 57-JA140140

(10) Drill a 1/8 in. (3.2 mm.) dia. hole in the bot tom skin (and doubler) at the location of the tooling hole. Remove the shim steel and check the proximity of the drilled hole to the underlying tooling hole. Gradually increase the dia. of the drilled hole to align the centre of the drilled hole with the centre of the tooling hole. The final dia.

of the drilled hole should be 1/4 in. (6.35 mm.) dia. to match the dia. of the tooling hole. Oversizing the drilled hole in the skin and doubler up to 3/8 in. is permitted if required to align the drilled hole with the tooling hole. Oversizing above 0.25 in.

must be reported to BAE SYSTEMS before proceeding.

(11) Drill out and remove the PSR sealant within th e tooling hole.

(12) Perform a rotary eddy current inspection of th e tooling hole in accordance with Appendix 1.

(13) Apply brush Alocrom 1200, in accordance with S RM 51-30-63, to any bare metal within the tooling hole and the drilled hole in the skin and doubler.

(14) Apply Epoxy Primer, in accordance with SRM 51- 30-66, to any bare metal within the tooling hole and the drilled hole in the skin and doubler.

(15) Fill the tooling hole and the drilled hole in the skin and doubler using PR1422 or PR1782 sealant.

(16) Perform X-ray inspection of the main spar inbo ard rib 36 in accordance with Appendix 2.

(17) Any defects observed during the above inspecti ons must be reported to BAE Systems before proceeding.

NOTE: Appendix 2 can be performed before, during or after the removal of the external straps at rib 36.

C. Recovery

(1) Replace the external straps, sealing block (if required) and all removed fasteners with new or serviceable items (for fastener details refer to Drawing No’s.

1379149B and 1379209B). Wet assemble in accordance with SRM 51-50-10.

(2) Any over-sizing of fastener holes must be repor ted to BAE Systems before proceeding.

(3) Replace all removed fairings and access panels.

(4) Make certain work area is clean, and clear of t ools and miscellaneous equipment.

(5) Refer to AMM Chapter 07-10-00. Remove jacks and trestles and lower aircraft.

(6) Close up.

(7) Aircraft records:

(a) Add service bulletin number 57-JA140140 to the aircraft records.

SERVICE BULLETIN 57-JA140140 ORIGINAL ISSUE JUN 26/14

(b) Add Mod JM8230 to the aircraft records.

NOTE: Operators are reminded of the necessity to in form the Business Support Team, Technical Publications, BAE Systems (Operations) Limited, Prestwick International Airport, Ayrshire, KA9 2RW, SCOTLAND, of the accomplishment of this service bulletin in order to obtain the necessary revisions for the affected manuals, see paragraph 1.K. Publications Affected, of this service bulletin.

SERVICE BULLETIN ORIGINAL ISSUE JUN 26/14 57-JA140140

3. MATERIAL INFORMATION NOTE: The following material data is provided on a 'per' aircraft basis. Use the applicable material kit number shown to order the parts required.

A. New parts supplied as material kit None.

B. Replacement Parts - Operators Supply

Part No. Description 1st Oversize (1/64) 2nd Oversize (1/32) Qty (Req’d per a/c) Comment PR1422 or PR1782 Sealant - - As required - 1379170B401 Sealing Block - - 1 - 1379170B402 Sealing Block - - 1 - MS21059L5 Anchor Nut - - 4 - NAS7403-6 Bolt - CSK NAS7403-6X NAS7403-6Y 14 - NAS7403-7 Bolt - CSK NAS7403-7X NAS7403-7Y 10 - NAS7403-8 Bolt - CSK NAS7403-8X NAS7403-8Y 8 - NAS7403-30 Bolt - CSK NAS7403-30X NAS7403-30Y 6 - NAS7403-31 Bolt - CSK NAS7403-31X NAS7403-31Y 10 - NAS7403-32 Bolt - CSK NAS7403-32X NAS7403-32Y 16 - NAS7403-34 Bolt - CSK NAS7403-34X NAS7403-34Y 8 - NAS7404-8 Bolt - CSK NAS7404-8X NAS7404-8Y 18 - NAS7404-10 Bolt - CSK NAS7404-10X NAS7404-10Y 2 - NAS7404-11 Bolt - CSK NAS7404-11X NAS7404-11Y 8 - NAS7404-12 Bolt - CSK NAS7404-12X NAS7404-12Y 6 - NAS7404-13 Bolt - CSK NAS7404-13X NAS7404-13Y 14 - NAS7404-14 Bolt - CSK NAS7404-14X NAS7404-14Y 12 - NAS7404-45 Bolt - CSK NAS7404-45X NAS7404-45Y 4 -

NAS7405-45 Bolt - CSK NAS7405-45X NAS7405-45Y 4 Oversize may be required at this position AS8600-D Nut N/A N/A 72 AS8600-E Nut N/A N/A 60 SP124-D Washer N/A N/A 72 SP124-E Washer N/A N/A 60 SP71-608 Rivet - CSK N/A N/A 8

SERVICE BULLETIN 57-JA140140 ORIGINAL ISSUE JUN 26/14

BLANK PAGE

Pages 13–24 of 38