Copy · J41-51-001R04 · 40 pages

© BAE Systems. Filed by the FAA in regulations.gov docket FAA-2018-0511; AD 2018-19-24 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextOCR

This text is OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = 'ba6e9c8251ce5abdaa3b94754be4c9917fb4882711f207880e10d15b18dffb73'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Page 1OCROpen in PDF

BAe JETSTREAM Series 4100

SERVICE BULLETIN

BAE SYSTEMS (OPERATIONS) LIMITED,

PRESTWICK INTERNATIONAL AIRPORT, AYRSHIRE, KA9 2RW, SCOTLAND.

J41-51-001

TRANSMITTAL SHEET This page transmits revision no.4 of Inspection Service Bulletin (ISB) J41-51-001, pages 1 to 34.

TITLE: STRUCTURES - INTRODUCTION OF NEW AND REVISED INSPECTIONS FOR

FATIGUE AND ENVIRONMENTAL DAMAGE

INSPECTION

REASON FOR REVISION At revision no.4 Appendix no's 3 and 5 are removed completely and the content of Appendix no's 1, 2 and 4 are reworked by removing and/or adding inspection requirements.

Note: Inspection requirements removed at this revision of the ISB are now incorporated in the following publications: MRBR, MPD and AMM.

Editorial.

INSTRUCTIONS FOR INCORPORATION Remove and discard ISB at revision no.2.

Insert ISB at revision no.4.

ORIGINAL ISSUE: FEB 15/02 J41-51-001 REVISION No.4: JUL 11/17 PAGE 1 OF 2

Page 2OCROpen in PDF

BAO JETST 85 4100

SERVICE BULLETIN

BLANK PAGE J41-51-001 PAGE 2 ORREVISION No.4: JUL 15/12

Page 3OCROpen in PDF

BAe JETSTREAM Series 4100

SERVICE BULLETIN

BAE SYSTEMS (OPERATIONS) LIMITED,

PRESTWICK INTERNATIONAL AIRPORT, AYRSHIRE, KA9 2RW, SCOTLAND.

J41-51-001 TITLE: STRUCTURES - INTRODUCTION OF NEW AND REVISED INSPECTIONS FOR

FATIGUE AND ENVIRONMENTAL DAMAGE

INSPECTION

1. PLANNING INFORMATION A. Effectivity All Jetstream Series 4100 Aircraft.

B. Reason An extensive review of the mainframe fatigue test results and the MSG-3 analysis for the Jetstream 4100 has now been completed. The review has identified new inspections and revisions to existing inspections (requirements and inspection thresholds). This Inspection Service Bulletin (ISB) introduces appropriate mandatory inspections to maintain the structural integrity of the airframe. It will be superseded when the Aircraft Maintenance Manual (AMM), Maintenance Review Board Report (MRBR) and the Maintenance Planning Document (MPD) are revised at a later date.

C. Description This ISB affects the general aircraft structure.

The ISB is divided into five appendices. Each appendix is in parts that can be accomplished as individual tasks.

The Appendices are as follows:-

- Appendix 1 - Inspections of the door structure.

- Appendix 2 - Inspections of the fuselage structure.

- Appendix 3 - Deleted at revision 3 of this ISB.

- Appendix 4 - Inspections of the empennage structure.

- Appendix 5 - Deleted at revision 3 of this ISB.

The tasks for Appendix 1 (inspections of the door structure) are as follows:- Part 8

- A detailed visual inspection (DVI) of the Type Ill escape hatch window pan structure is done.

- A report is sent.

- The aircraft records are amended.

NOTE: This inspection (SSI number 52-20-013) replaces AMM task 52-20- 05-210-849 (MRBR 52-20-013) (MPD 522013-DVI-10030-1).

ORIGINAL ISSUE: FEB 15/02 J41-51-001 REVISION No.4: JUL 11/17 PAGE 1 OF 34

Page 4OCROpen in PDF

BAe JETSTREAM Series 4100

SERVICE BULLETIN The tasks for Appendix 2 (inspections of the fuselage structure) are as follows:- Part 1

- A detailed internal visual inspection of the forward pressure bulkhead - avionics bay floor and nose landing gear bay roof brackets is done.

- A report is sent.

- The aircraft records are amended.

NOTE: This inspection replaces AMM task 53-10-02-210-962 (SSI number 53-10-006).

Part 2

- ADVI of the forward pressure bulkhead - avionics bay floor and nose landing gear bay root brackets is done.

- A report is sent.

- The aircraft records are amended.

NOTE: This inspection replaces AMM task 53-10-02-210-950 (SSI number 53-10-006 in AMM Chapter 5).

Part 3

- A detailed internal visual inspection of the forward pressure bulkhead nose spine attachment cleats is done.

- A report is sent.

- The aircraft records are amended.

NOTE: This inspection replaces AMM task 53-10-02-210-963 (SSI number 53-10-013A).

Part 5

- A detailed internal visual inspection of the intercostals forward of the forward pressure bulkhead is done.

- A report is sent.

- The aircraft records are amended.

NOTE: This inspection replaces AMM task 53-10-02-210-964 (SSI number 53-10-015A).

Part 25

- An eddy current inspection of frame 537 at the side of the main baggage-bay door opening is done.

- A report is sent.

- The aircraft records are amended.

NOTE: This inspection replaces AMM task 53-10-00-250-932 (MRBR 53-10-079) (MPD 531079-SDI-10030-1).

Part 32

- A detailed internal visual inspection of station 4-8 diaphragms is done.

- A report is sent.

- The aircraft records are amended.

NOTE: This inspection replaces AMM task 53-10-02-210-965 (SSI number 53-10-002).

J41-51-001 ORIGINAL ISSUE: FEB 15/02 PAGE 2 REVISION No.4: JUL 11/17

Page 5OCROpen in PDF

BAe JETSTREAM Series 4100

SERVICE BULLETIN Part 34

- A DVI of the canopy structure attachment fittings is done.

- A report is sent.

- The aircraft records are amended.

NOTE: This inspection (SSI 53-10-025) replaces AMM task 53-10-00-210-871 (MRBR 53-10-025) (MPD 531025-DVI-10010-1).

The tasks for Appendix 4 (inspections of the empennage structure) are as follows:- Part 3 A detailed external visual inspection of the horizontal stabilizer front spar between stn 67.5 and stn 122.5 is done.

- A report is sent.

The aircraft records are amended.

NOTE: This inspection replaces AMM task 55-10-00-210-902 (SSI number 55-10-033).

Part 4

- A detailed internal visual inspection of the horizontal stabilizer front spar between stn 67.5 and stn 122.5 is done.

- A report is sent.

- The aircraft records are amended.

NOTE: This inspection replaces AMM task 55-10-00-210-903 (SSI number 55-10-033).

Part 5

- A detailed external visual inspection of the horizontal stabilizer rear spar between stn 67.5 and stn 122.5 is done.

A report is sent.

- The aircraft records are amended.

NOTE: This inspection replaces AMM task 55-10-00-210-904 (SSI number 55-10-035).

Part 6

- A detailed internal visual inspection of the horizontal stabilizer rear spar between stn 67.5 and stn 122.5 is done.

- A report is sent.

- The aircraft records are amended.

NOTE: This inspection replaces AMM task 55-10-00-210-905 (SSI number 55-10-035).

D. Manpower Appendix 1 - Inspections of the door structure Part 8 - 1 man-hour.

Appendix 2 - Inspections of the fuselage structure Part 1 - 2 man-hours.

Part 2 - 2 man-hours.

Part 3 - 2 man-hours.

ORIGINAL ISSUE: FEB 15/02 J41-51-001 REVISION No.4: JUL 11/17 PAGE 3

Page 6OCROpen in PDF

BAe JETSTREAM Series 4100

SERVICE BULLETIN Part 5 - 2 man-hours.

Part 25 - 8 man-hours.

Part 32 - 1 man-hour.

Part 34 - 1 man-hour.

Appendix 4 - Inspections of the empennage structure Part 3 - 3 man-hours.

Part 4 - 3 man-hours.

Part 5 - 2 man-hours.

Part 6 - 2 man-hours.

Mechanical skills are necessary for each Part in each Appendix.

E. Material - Cost and Availability None.

F. Tooling - Price and Availability None.

G. Weight and Balance None.

H. Aircraft Noise Levels Not affected.

Electrical Load Data Not affected.

Software Accomplishment Summary Not applicable.

K. References

- Aircraft Maintenance Manual, Chapters 6, 51, 52, 53, 55.

- Structural Repair Manual.

- Non Destructive Testing Manual.

Publications Affected Aircraft Maintenance Manual.

NOTE: The MRBR and MPD will be reviewed, for inclusion of a scheduled task.

When inspection requirements (and procedures) of this ISB are published in the MRBR, MPD and AMM chapters 5, 52, 53, 54, 55 and 57 this ISB will be cancelled (or revised to refer to the MRBR and AMM chapter 5 as the EASA agreed published sources).

J41-51-001 ORIGINAL ISSUE: FEB 15/02 PAGE 4 REVISION No.4: JUL 11/17

Page 7OCROpen in PDF

BAe JETSTREAM Series 4100

SERVICE BULLETIN M. Family Tree of Modification Relationships Not applicable.

N. Approval The technical content of this ISB is the subject of EASA Airworthiness Directive consultation.

Compliance with this ISB must be achieved as follows:

Appendix 1 - Inspections of the door structure Part 8 DVI of the Type III escape hatch window pan structure.

Initial inspection: 20,000-26,000 flights.

Repeat inspections: 8,100 flights.

For aircraft that have accomplished SSI 52-20-013 more than 4,100 flights previously, the compliance period is 4,000 flights from publication of Revision 3 of ISB J41-51-001, but not to exceed 9,200 flights from last inspection.

Appendix 2 - Inspections of the fuselage structure Part 1 Detailed internal visual inspection of the forward pressure bulkhead - avionics bay floor and nose landing gear bay roof brackets.

Initial inspection: 8 years from first flight.

Repeat inspections: 2 years.

If the initial 8 year inspection has been exceeded this inspection must be carried out within 12 months of issue of this ISB.

Part 2 DVI of the forward pressure bulkhead - avionics bay floor and nose landing gear bay roof brackets.

Initial inspection: 18,900 flights.

Repeat inspections: 10,000 flights.

For aircraft that are in excess of 14,900 flights and that have not already accomplished SSI 53-10-006, the compliance period is 4,000 flights from publication of Revision 3 of ISB J41-51-001, but not to exceed 23,000 flights from first flight of the aircraft.

Part 3 Detailed internal visual inspection of the forward pressure bulkhead nose spine attachment cleats.

Initial inspection: 8 years from first flight.

Repeat inspections: 2 years.

If the initial 8 year inspection has been exceeded this inspection must be carried out within 12 months of issue of this ISB.

Part 5 Detailed internal visual inspection of the intercostals forward of the forward pressure bulkhead.

ORIGINAL ISSUE: FEB 15/02 J41-51-001 REVISION No.4: JUL 11/17 PAGE 5

Page 8OCROpen in PDF

BAe JETSTREAM Series 4100

SERVICE BULLETIN Initial inspection: 4 years from first flight.

Repeat inspections: 2 years.

If the initial 4 year inspection has been exceeded this inspection must be carried out within 12 months of issue of this ISB.

Part 25 Eddy current inspection of frame 537 at the side of the main baggagebay door opening.

Initial inspection: 20,000-26,000 flights.

Repeat inspections: 8,100 flights.

For aircraft that have accomplished SSI 53-10-079 more than 4,100 flights previously, the compliance period is 4,000 flights from publication of Revision 3 of ISB J41-51-001, but not to exceed 12,700 flights from last inspection.

Part 32 Detailed internal visual inspection of station 4-8 diaphragms.

Initial inspection: 8 years from first flight.

Repeat inspections: 2 years.

If the initial 8 year inspection has been exceeded this inspection must be carried out within 12 months of issue of this ISB.

Part 34 DVI of the canopy structure attachment fittings.

Initial inspection: 20,000-26,000 flights.

Repeat inspections: 9,400 flights.

For aircraft that have accomplished SSI 53-10-025 more than 5,400 flights previously, the compliance period is 4,000 flights from publication of Revision 3 of ISB J41-51-001, but not to exceed 18,500 flights from last inspection.

Appendix 4 - Inspections of the empennage structure Part 3 Detailed external visual inspection of the horizontal stabilizer front spar between stn 67.5 and stn 122.5.

Initial inspection: 4 years from first flight.

Repeat inspections: 4 years.

If the initial 4 year inspection has been exceeded this inspection must be carried out within 12 months of issue of this ISB.

Part 4 Detailed internal inspection of the horizontal stabilizer front spar between stn 67.5 and stn 122.5.

Initial inspection: 8 years from first flight.

Repeat inspections: 4 years.

If the initial 8 year inspection has been exceeded this inspection must be carried out within 12 months of issue of this ISB.

J41-51-001 ORIGINAL ISSUE: FEB 15/02 PAGE 6 REVISION No.4: JUL 11/17

Page 9OCROpen in PDF

BAe JETSTREAM Series 4100

SERVICE BULLETIN Part 5 Detailed external visual inspection of the horizontal stabilizer rear spar between stn 67.5 and stn 122.5.

Initial inspection: 4 years from first flight.

Repeat inspections: 4 years.

If the initial 4 year inspection has been exceeded this inspection must be carried out within 12 months of issue of this ISB.

Part 6 Detailed internal inspection of the horizontal stabilizer rear spar between stn 67.5 and stn 122.5.

Initial inspection: 8 years from first flight.

Repeat inspections: 4 years.

If the initial 8 year inspection has been exceeded this inspection must be carried out within 12 months of issue of this ISB.

Any damage found must be repaired before the aircraft is flown again.

Repairs must be i.a.w. the Structural Repair Manual (SRM). If the damage is outside the limits defined in the SRM, the damage must be repaired i.a.w. an approved BAE SYSTEMS repair scheme.

The technical content of this document is approved under the authority of DOA Ref. EASA.21J.047.

ORIGINAL ISSUE: FEB 15/02 J41-51-001 REVISION No.4: JUL 11/17 PAGE 7

Page 10OCROpen in PDF

BAO JET ST7e5 4100

SERVICE BULLETIN

BLANK PAGE 41-51-001 O REVISION NO-4: JEL 15/02 PAGE 8

Page 11OCROpen in PDF

BAe JETSTREAM Series 4100

SERVICE BULLETIN

2. ACCOMPLISHMENT INSTRUCTIONS WARNING: MAKE SURE THE AIRCRAFT AND THE AIRCRAFT SYSTEMS ARE MADE

SAFE AS DETAILED IN THE APPLICABLE CHAPTERS OF THE AIRCRAFT MAINTENANCE MANUAL.

NOTE: Abbreviations are used in this ISB as follows:- AMM - Aircraft Maintenance Manual.

FPB - Forward Pressure Bulkhead.

i.a.w. - in accordance with.

MPD - Maintenance Planning Document.

MRBR - Maintenance Review Board Report.

NDT - Non-Destructive Testing Manual.

SRM - Structural Repair Manual.

A. Accomplishment NOTE 1: In the steps that follow, work is done to inspect components at specified intervals. If the used life of a component is not known then either uses ISB J41-05-001 to determine the life of the component or replace the component with one that has a known life.

NOTE 2: In the steps that follow, records are made of the results of inspections.

Copies of these records are to be sent to:- Customer Technical Support, Building 37, BAE SYSTEMS (Operations) Limited, Prestwick International Airport, Ayrshire, KA9 2RW, SCOTLAND.

Fax No. + 44 (0) 1292 67 5432.

(1) At the interval specified in paragraph 1.N., do the applicable Part to inspect door structure as the instructions in Appendix 1. If applicable, add to the aircraft records the need for a repeat inspection.

(2) At the interval specified in paragraph 1.N., do the applicable Part to inspect fuselage structure as the instructions in Appendix 2. If applicable, add to the aircraft records the need for a repeat inspection.

(3) At the interval specified in paragraph 1.N., do the applicable Part to inspect empennage structure as the instructions in Appendix 4. If applicable, add to the aircraft records the need for a repeat inspection.

ORIGINAL ISSUE: FEB 15/02 J41-51-001 REVISION No.4: JUL 11/17 PAGE 9

Page 12OCROpen in PDF

BAE JETSTREAM Series 4100

SERVICE BULLETIN

BLANK PAGE JAGE -001 OPREVISION NO.4: FEL 15/02

Pages 13–24 of 40