Copy · FAA-2018-0580--737-25-1758-RB-00 · 8 pages

© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2018-0580; AD 2019-03-06 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Text

From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '6d6d2da6fb0664c591b7c83df03fc3e07b0db8297538b3d10642c61030c866a4'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Commercial Airplanes 737 Requirements Bulletin Number: 737-25-1758 RB Original Issue: November 08, 2017 ATA System: 2523 SUBJECT: EQUIPMENT/FURNISHINGS - Passenger Compartment - Service Units - Lanyard Assemblies Installation Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 300-774). An export license may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data has the individual responsibility to abide by all export laws.

9E991ECCN:

Copyright © 2017 Boeing.

Unpublished Work. All Rights Reserved.

Treatment of this document and its content is governed by contract with Boeing. Rights to use this document are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company.

Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.

Original Issue: November 08, 2017 737-25-1758 RB 1 of 8

4.0

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 08, 2017 737-25-1758 RB 2 of 8 REQUIREMENTS BULLETIN 737-25-1758

BLANK PAGE

Table of Contents

1. EFFECTIVITY5

A. Airplanes5

B. Spares Affected5

2. CONCURRENT REQUIREMENTS5

3. COMPLIANCE5

4. APPROVAL6

5. ACCOMPLISHMENT INSTRUCTIONS7

A. General Information7

B. Work Instructions8

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 08, 2017 737-25-1758 RB 3 of 8 REQUIREMENTS BULLETIN 737-25-1758

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 08, 2017 737-25-1758 RB 4 of 8 REQUIREMENTS BULLETIN 737-25-1758

BLANK PAGE

Commercial Airplanes 737 Requirements Bulletin Number: 737-25-1758 RB Original Issue: November 08, 2017 ATA System: 2523 SUBJECT: EQUIPMENT/FURNISHINGS - Passenger Compartment - Service Units - Lanyard Assemblies Installation THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED

TO CREATE THE SERVICE BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS…) OF THE RB WHICH THE SB REFERS TO AS THE RELATED DOCUMENT.

1. EFFECTIVITY A. Airplanes This bulletin is applicable to 737-300/400/500 Airplanes, line numbers 1015 thru 3110, equipped with Aluminum Passenger Service Units.

B. Spares Affected Examine spares inventory for any Aluminum Passenger Service Units (PSUs). If any are found that have not done the change in this bulletin, then install one nylon coated stainless steel lanyard at each corner of each PSU panel assembly such that in the event of a survivable accident, the detached PSU panel assembly does not extend lower than BWL 265.7, refer to WORK INSTRUCTIONS - PART 1 as an accepted procedure.

2. CONCURRENT REQUIREMENTS None.

3. COMPLIANCE The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin mandatory.

Accomplish the required action(s), based on the applicable condition(s) in Table 1, in accordance with the Accomplishment Instructions.

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 08, 2017 737-25-1758 RB 5 of 8

Table 1: Passenger Service Unit - Lanyard Assemblies Installation Repeat Interval (Not to Exceed) Compliance TimeActionCondition -Within 60 months after the Original Issue date of the Requirements Bulletin (RB).

Install one nylon coated stainless steel lanyard at each corner of each PSU panel assembly such that in the event of a survivable accident, the detached PSU panel assembly does not extend lower than BWL 265.7.

All Airplanes

4. APPROVAL This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes specified in this document comply with the applicable regulations and are FAA approved, as well as European Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved airplanes listed in the service bulletin effectivity. This document and its approval were based on the airplane in its original Boeing delivery configuration or as modified by other Boeing changes.

If an airplane has a non-Boeing modification or repair that affects a component or system also affected by this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval before incorporating this Requirements Bulletin.

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 08, 2017 737-25-1758 RB 6 of 8 REQUIREMENTS BULLETIN 737-25-1758

5. ACCOMPLISHMENT INSTRUCTIONS A. GENERAL INFORMATION NOTE: 4. Unless shown differently, these dimensions and tolerances are used:

– Linear dimensions are in inches – Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus or minus 0.03 inch – Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch – Angular tolerance is plus or minus 2 degrees – Hole dimensions for standard solid rivets and fasteners are in Structural Repair Manual (SRM) Chapter 51 – Torque Values:

— Values for airframe maintenance tasks are included in Chapter 20 of 737 Aircraft Maintenance Manual (AMM).

— Values for electrical maintenance tasks are included in Chapter 20 of Standard Wiring Practices Manual (SWPM).

— Non-standard torque values for maintenance tasks are included in the applicable installation step.

5. Use the approved fastener, process and material substitutions in accordance with SRM Chapter 51.

6. If the length of any fastener specified in this service bulletin does not meet installation standards given in SRM Chapter 51, then a fastener of the same specification, or an approved substitute, with a length which meets the installation standards given in SRM Chapter 51 may be used. In addition, washers may be installed for fastener grip length in accordance with SRM Chapter 51. Refer to SOPM 20-50-01 for alternate full threaded fasteners (screws) needed for installation in this service bulletin.

7. These work instructions refer to procedures included in other Boeing documents.

When the words "refer to" are used and the operator has an accepted alternative procedure, the accepted alternative procedure can be used. When the words "in accordance with" are included in the instruction, the procedure in the Boeing document must be used.

8. If it is necessary to remove more parts for access, you can remove those parts. If you can get access without removing identified parts, it is not necessary to remove all of the identified parts. Jacking and shoring limitations must be observed.

9. Where the work instructions include installation of a kept part, a new or serviceable part with the same part number can be installed as an alternative to the kept part.

10. Use of colors in Figures is based on guidance from the ATA e-Business Program (ATA) iSpec 2200.

11. This is an Enhanced Required for Compliance document. There will be a separate Service Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated by an Airworthiness Directive (AD), then all applicable requirements specified in the RB must be done. For the related SB, some locations are marked RC Start and RC End to identify the requirements that are restated from the RB. For the related SB, Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 08, 2017 737-25-1758 RB 7 of 8 REQUIREMENTS BULLETIN 737-25-1758

the areas between RC Start and RC End, including sub-steps and any figures identified between RC Start and RC End, must be done to comply with the AD.

Therefore, an Alternative Method of Compliance (AMOC) is required for any deviations to steps between RC Start and RC End, including substeps and identified figures.

For the related SB, the steps not between RC Start and RC End may be deviated from using accepted methods in accordance with the operator's maintenance or inspection program without obtaining approval of an AMOC; this is provided that the steps between RC Start and RC End, including sub-steps and identified figures, can still be done as specified, and the airplane can be put back in an airworthy condition.

Figures not required for compliance are omitted from the RB.

12. This is an Enhanced Required for Compliance document. The Boeing processes used to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure that the information between "RC Start" and "RC End" in the SB are identical to the information in the same sections (Compliance, Work Instructions...) of the RB which the SB refers to as the related document.

B. WORK INSTRUCTIONS Actions Required for Compliance

1. Requirements Table 1: Passenger Service Unit (PSU) - Lanyard Assemblies Installation Refer to the listed procedures in SB 737-25-1758 Original Issue or later approved revisions as an accepted procedure Method of ComplianceActionCondition PART 1: Passenger Service Unit - Lanyard Assemblies Installation.

-Install one nylon coated stainless steel lanyard at each corner of each PSU panel assembly such that in the event of a survivable accident, the detached PSU panel assembly does not extend lower than BWL 265.7.

All Airplanes Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 08, 2017 737-25-1758 RB 8 of 8 REQUIREMENTS BULLETIN 737-25-1758