Copy · SB-737-57A1321-00 -- BOEING · 289 pages

© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2019-0440; AD 2019-23-12 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '3c2b9af4c2e6bcec26a62d059d027e01b8c53be96864bf9c98ce26190fc31fc0'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Show pages 37–48

3. ACCOMPLISHMENT INSTRUCTIONS A. GENERAL INFORMATION

KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED

MATERIAL, METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR OTHER ELECTRICAL DAMAGE.

CAUTION NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for definition of the acronyms.

2. Obey all of the warnings and cautions given in the specified manual sections.

3. The work instructions are divided into work packages. Each wo rk package can be completed independently during separate maintenance visits. Task Hours and Elapsed Hours for each package are given in Paragraph 1.G., Manpower.

4. Unless shown differently, these dimensions and tolerances are used:

– Linear dimensions are in inches – Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus or minus 0.03 inch – Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch – Angular tolerance is plus or minus 2 degrees – Hole dimensions for standard solid rivets and fasteners are in Structural Repair Manual (SRM) Chapter 51 – Torque Values:

— Values for structural fasteners are given in 737 Structural Repair Manual, Chapter 51.

— Values for airframe maintenance tasks are included in Chapter 20 of 737 Aircraft Maintenance Manual (AMM).

— Values for electrical maintenance tasks are included in Chapter 20 of Standard Wiring Practices Manual (SWPM).

— Non-standard torque values for maintenance tasks are included in the applicable installation step.

5. Use the approved fastener, process and material substitutions in accordance with SRM Chapter 51.

6. Refer to the SWPM 20-10-11 and SWPM 20-10-12 for the wire ins tallation procedures, and SWPM 20-10-19 for the wire separation requirements, as accepted procedures.

7. The necessary conditions for selection of clamp type and size are included in SWPM 20-10-12. If any wire bundle support clamp specified in this service bulletin does not make a correct fit on the wire bundle, refer to SWPM 20-10-12 as an accepted procedure to select a clamp that fits correctly.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: February 08, 2019 737-57A1321 49 of 289 BOEING SERVICE BULLETIN 737-57A1321

ALERTALERT

8. If the length of any fastener specified in this service bulle tin does not meet installation standards given in SRM Chapter 51, then a fastener of the same specification, or an approved substitute, with a length which meets the installation standards given in SRM Chapter 51 may be used. In addition, washers may be installed for fastener grip length in accordance with SRM Chapter 51. Refer to SOPM 20-50-01 for alternate full threaded fasteners (screws) needed for installation in this service bulletin.

9. These work instructions refer to procedures included in other Boeing documents.

When the words "refer to" are used and the operator has an accepted alternative procedure, the accepted alternative procedure can be used. When the words "in accordance with" are included in the instruction, the procedure in the Boeing document must be used.

10. The instructions in Paragraph 3.B., Work Instructions and th e figures can include operation of tools or test equipment. Boeing Engineering Tool Drawings, the Illustrated Tool and Equipment Manual, and the Special Tool and Ground Handling Drawing Index contain data on versions of the tools or test equipment that you can use. It is permitted to use replaced tools. It is not permitted to use superseded tools.

11. If it is necessary to remove more parts for access, you can remove those parts. If you can get access without removing identified parts, it is not necessary to remove all of the identified parts. Jacking and shoring limitations must be observed.

12. Where the work instructions include installation of a kept p art, a new or serviceable part with the same part number can be installed as an alternative to the kept part.

13. This service bulletin includes functional test procedures fo r the systems changed by this service bulletin. More functional tests can possibly be necessary in accordance with standard maintenance practices because of interruption to other airplane systems.

14. Use of colors in Figures is based on guidance from the ATA e -Business Program (ATA) iSpec 2200.

15. The compliance times for the actions in Paragraph 3.B., WORK INSTRUCTIONS are in Paragraph 1.E., Compliance.

16. Some steps in the Work Instructions are labeled as Required for Compliance (RC).

If this service bulletin is mandated by an Airworthiness Directive (AD), then the steps labeled as RC, including sub-steps under an RC step and any figures identified in an RC step, must be done to comply with the AD. If a step or sub-step is labeled "RC Exempt," then the RC requirement is removed from that step or sub-step. An Alternative Method of Compliance (AMOC) is required for any deviations to RC steps, including sub-steps and identified figures. Steps not labeled as RC may be deviated from using accepted methods in accordance with the operator's maintenance or inspection program without obtaining approval of an AMOC. This is provided that the RC steps, including sub-steps and identified figures, can still be done as specified, and the airplane can be put back in an airworthy condition.

17. Approved wire bundle clamp installation deviations:

• At locations where tandem clamps are shown in figures, single clamps can exist for your airplane configuration and this is acceptable.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: February 08, 2019 737-57A1321 50 of 289 BOEING SERVICE BULLETIN 737-57A1321

ALERTALERT

• The existing clamp quantity and location can be different to t hat shown in the figures. If the existing clamp quantity or location is different, make sure that the work at each clamp agrees with the requirements for installing a clamp with a TFE-2X, STANDARD WALL Teflon sleeve under the clamp in accordance with this service bulletin.

• Orientation of existing clamps shown in figures are for refere nce only, and can be different from your airplane configuration.

• Wire bundles and routing shown in this service bulletin can be different to that on the airplane. Existing wire bundle configuration is acceptable if installed (clamp size, routing and bend radii) to the standards of SWPM 20-10-11 and SWPM 20-10-12, and the clamps and TFE-2X, STANDARD WALL Teflon sleeves are installed in accordance with the requirements of this service bulletin. If existing wire bundle configuration are not installed to the standards of SWPM 20-10-11 or SWPM 20-10-12, then contact Boeing for further review and disposition.

• Wire bundles that are protected by existing BMS13-52 expando s leeves must be covered with TFE-2X, STANDARD WALL Teflon Sleeve.

• Wire bundle segments with sharp bends (small radius) near a cl amp or other interference, can deviate from centering of the TFE-2X, STANDARD WALL Teflon sleeve to the clamp. It is acceptable to center the minimum 3 inch TFE-2X, STANDARD WALL Teflon sleeve as close as possible to the clamp.

18. Refer to SWPM 20-10-12 for the definition of cushion clamp r ubber cushion damage, as an accepted procedure.

B. WORK INSTRUCTIONS Group 1:

Contact The Boeing Company for modification instructions and do the modification.

Group 2-59:

WORK PACKAGE 1: FUEL TANKS - FASTENER SEALING

1. Defuel the left main, right main and center fuel tanks. Refer to 737-300/400/500 AMM 28-23-00 as an accepted procedure.

2. Purge the left main, right main and center fuel tanks. Refer to 737-300/400/500 AMM 28-10-00 as an accepted procedure.

3. Remove and keep the left main and right main fuel tank access doors. Refer to 737-300/400/500 AMM 28-11-11 as an accepted procedure.

Main Fuel Tank Access Doors Access Door Number (Right Tank) Access Door Number (Left Tank) Name 75017101Surge Tank Access Door 74027202Fuel Tank Access Door No. 1 74047204Fuel Tank Access Door No. 2 74057205Fuel Tank Access Door No. 3 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: February 08, 2019 737-57A1321 51 of 289 BOEING SERVICE BULLETIN 737-57A1321

ALERTALERT

Main Fuel Tank Access Doors Access Door Number (Right Tank) Access Door Number (Left Tank) Name 74067206Fuel Tank Access Door No. 4 74077207Fuel Tank Access Door No. 5 74087208Fuel Tank Access Door No. 6 74097209Fuel Tank Access Door No. 7 74107210Fuel Tank Access Door No. 8 74117211Fuel Tank Access Door No. 9 74127212Fuel Tank Access Door No. 10 74137213Fuel Tank Access Door No. 11 74147214Fuel Tank Access Door No. 12

4. Remove and keep the center fuel tank access doors. Refer to 7 37-300/400/500 AMM 28-11-31 as an accepted procedure.

Center Fuel Tank Access Doors Access Door Number (Right) Access Door Number (Left) Name 33043303Fuel Tank Access Door

5. RC - Locate and seal fuel tank fasteners as follows:

a. Left Wing Rear Spar

(1) Group 2-36, 56-59:

Locate and seal the fasteners common to the left wing rear spar in accordance with FIGURE 1 and FIGURE 23.

(2) Group 37-48:

Locate and seal the fasteners common to the left wing rear spar in accordance with FIGURE 1, FIGURE 2, and FIGURE 23.

(3) Group 49-55:

Locate and seal the fasteners common to the left wing rear spar in accordance with FIGURE 3 and FIGURE 23.

b. Right Wing Rear Spar

(1) Group 2-36, 56-59:

Locate and seal the fasteners common to the right wing rear spar in accordance with FIGURE 4 and FIGURE 23.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: February 08, 2019 737-57A1321 52 of 289 BOEING SERVICE BULLETIN 737-57A1321

ALERTALERT

(2) Group 37-48:

Locate and seal the fasteners common to the right wing rear spar in accordance with FIGURE 4, FIGURE 5 and FIGURE 23.

(3) Group 49-55:

Locate and seal the fasteners common to the right wing rear spar in accordance with FIGURE 6 and FIGURE 23.

c. Left Wing Front Spar

(1) Group 2-7, 37-48, 56-59:

Locate and seal the fasteners common to the left wing front spar in accordance with FIGURE 7, FIGURE 9 and FIGURE 23.

(2) Group 8-36:

Locate and seal the fasteners common to the left wing front spar in accordance with FIGURE 8, FIGURE 9 and FIGURE 23.

(3) Group 49-55:

Locate and seal the fasteners common to the left wing front spar in accordance with FIGURE 10 and FIGURE 23.

d. Right Wing Front Spar

(1) Group 2-7, 37-48, 56-59:

Locate and seal the fasteners common to the right wing front spar in accordance with FIGURE 11, FIGURE 13 and FIGURE 23.

(2) Group 8-36:

Locate and seal the fasteners common to the right wing front spar in accordance with FIGURE 12, FIGURE 13 and FIGURE 23.

(3) Group 49-55:

Locate and seal the fasteners common to the right wing front spar in accordance with FIGURE 14 and FIGURE 23.

e. Wing Center Section Rear Spar

(1) Group 2-48, 56-59:

Locate and seal the fasteners common to the wing center section rear spar in accordance with FIGURE 15 and FIGURE 23.

(2) Group 49-55:

Locate and seal the fasteners common to the wing center section rear spar in accordance with FIGURE 16 and FIGURE 23.

f. Wing Center Section Front Spar

(1) Group 2-7, 56-59:

Locate and seal the fasteners common to the wing center section front spar in accordance with FIGURE 17 and FIGURE 23.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: February 08, 2019 737-57A1321 53 of 289 BOEING SERVICE BULLETIN 737-57A1321

ALERTALERT

(2) Group 8-55:

Locate and seal the fasteners common to the wing center section front spar in accordance with FIGURE 18 and FIGURE 23.

g. Left Upper Wing Rib Shear Ties

(1) Group 2, 4-55:

Locate and seal the fasteners common to the left upper wing rib shear ties in accordance with FIGURE 19 and FIGURE 23.

(2) Group 3, 56-59:

Locate and seal the fasteners common to the left upper wing rib shear ties in accordance with FIGURE 20 and FIGURE 23.

h. Right Upper Wing Rib Shear Ties

(1) Group 2, 4-55:

Locate and seal the fasteners common to the right upper wing rib shear ties in accordance with FIGURE 21 and FIGURE 23.

(2) Group 3, 56-59:

Locate and seal the fasteners common to the right upper wing rib shear ties in accordance with FIGURE 22 and FIGURE 23.

MAKE SURE YOU REMOVE ALL UNWANTED PARTICLES AND MATERIALS FROM THE FUEL TANKS. UNWANTED MATERIALS CAN COLLECT IN THE

FUEL TANKS, WHICH CAN CAUSE BLOCKAGE OR INCORRECT SYSTEM OPERATION.CAUTION

6. Install kept center fuel tank access doors. Refer to 737-300/400/500 AMM 28-11-31 as an accepted procedure.

7. Install kept left main and right main fuel tank access doors. Refer to 737-300/400/500 AMM 28-11-11 as an accepted procedure.

8. Make sure that all removed and then installed fuel tank acces s doors do not leak fuel. Refer to 737-300/400/500 AMM 28-11-00 as an accepted procedure.

9. Put the airplane back to a serviceable condition.

Group 2-59:

WORK PACKAGE 2: EXTERNAL TO THE FUEL TANKS AT THE LEFT AND RIGHT WING REAR

SPAR - WIRE BUNDLE CLAMP REPLACEMENT AND TEFLON SLEEVE INSTALLATION

1. Get access to the left and right wing rear spar. Extend the i nboard and outboard spoilers. Refer to 737-300/400/500 AMM 27-61-00 as an accepted procedure.

2. Remove and keep the left wing access panel 8408. Refer to 737 -300/400/500 AMM 12-31-61 as an accepted procedure.

3. Remove and keep the right wing access panel 8508. Refer to 73 7-300/400/500 AMM 12-31-61 as an accepted procedure.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: February 08, 2019 737-57A1321 54 of 289 BOEING SERVICE BULLETIN 737-57A1321

ALERTALERT

4. RC - Replace wire bundle clamps and install TFE-2X Teflon sleeve under the clamps on the wire bundle installation along the left wing rear spar:

a. Group 2-4, 6, 8, 10, 12, 16-17, 20, 24-25, 30-31, 37, 40, 42, 45, 47, 49, 51-52, 56, 58:

In accordance with FIGURE 24.

b. Group 9, 11, 18, 26, 28, 32-33, 35-36, 38, 41, 46, 50:

In accordance with FIGURE 25.

c. Group 5, 7, 13, 15, 19, 21-23, 27, 39, 43, 53, 55, 57, 59:

In accordance with FIGURE 26.

d. Group 14, 29, 34, 44, 48, 54:

In accordance with FIGURE 27.

5. RC - Replace wire bundle clamps and install TFE-2X Teflon sleeve under the clamps on the wire bundle installation along the right wing rear spar:

a. Group 2-8, 10, 12-13, 15-17, 19-25, 27, 30-31, 37, 39-40, 42-43, 45, 47, 49, 51-53, 55-59:

In accordance with FIGURE 28.

b. Group 9, 11, 14, 18, 26, 28-29, 32-36, 38, 41, 44, 46, 48, 50, 54:

In accordance with FIGURE 29.

6. Install kept left wing access panel 8408. Refer to 737-300/400/500 AMM 12-31-61 as an accepted procedure.

7. Install kept right wing access panel 8508. Refer to 737-300/400/500 AMM 12-31-61 as an accepted procedure.

MAKE SURE ALL PERSONS AND EQUIPMENT ARE CLEAR OF THE FLIGHT CONTROL SURFACES, THE THRUST REVERSERS, AND THE LANDING GEAR.

THESE COMPONENTS CAN MOVE SUDDENLY WHEN YOU SUPPLY HYDRAULIC POWER. THIS CAN CAUSE INJURY TO PERSONS AND DAMAGE TO EQUIPMENT.

WARNING

8. Retract the inboard and outboard spoilers. Refer to 737-300/400/500 AMM 27-61-00 as an accepted procedure.

9. Put the airplane back to a serviceable condition.

Group 2-59:

WORK PACKAGE 3: EXTERNAL TO THE FUEL TANKS AT THE LEFT AND RIGHT WING FRONT

SPAR - WIRE BUNDLE CLAMP REPLACEMENT AND TEFLON SLEEVE INSTALLATION

1. Get access to the left and right wing front spar by extending the leading edge slats and Krueger Flap Numbers 1, 2, 3 and 4. Refer to 737-300/400/500 AMM 27-81-00 as an accepted procedure.

2. RC - Replace wire bundle clamps and install TFE-2X Teflon sleeve under the clamps on the wire bundle installation along the left wing front spar:

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: February 08, 2019 737-57A1321 55 of 289 BOEING SERVICE BULLETIN 737-57A1321

ALERTALERT

a. Group 2-7, 16, 20-21, 23-24, 30, 56-59:

In accordance with FIGURE 30.

b. Group 8-15, 17-19, 22, 25-29, 31-55:

In accordance with FIGURE 31.

3. RC - Replace wire bundle clamps and install TFE-2X Teflon sleeve under the clamps on the wire bundle installation along the right wing front spar:

a. Group 2-59:

In accordance with FIGURE 32.

KEEP PERSONS AND EQUIPMENT AWAY FROM ALL CONTROL SURFACES WHEN HYDRAULIC POWER IS SUPPLIED. AILERONS, ELEVATORS, RUDDER,

FLAPS, SLATS, SPOILERS AND STABILIZER ARE FULLY POWERED SURFACES. INJURY TO PERSONS OR DAMAGE TO EQUIPMENT CAN OCCUR WHEN HYDRAULIC POWER IS SUPPLIED.

WARNING

MAKE SURE THE ACCESS DOOR FOR THE ENGINE STRUT, THE INBOARD

FAN COWLING, AND THE THRUST REVERSER COWLING ARE CLEAR FROM MOVEMENT OF THE SLATS. IF THE MOVEMENT OF THE SLATS IS BLOCKED, IT CAN CAUSE DAMAGE TO THE AIRPLANE.CAUTION

4. Retract the leading edge slats and Krueger Flap Numbers 1, 2, 3 and 4. Refer to 737-300/400/500 AMM 27-81-00 as an accepted procedure.

5. Put the airplane back to a serviceable condition.

Group 2-59:

WORK PACKAGE 4 - EXTERNAL TO THE FUEL TANKS AT THE FORWARD CARGO COMPARTMENT STATION 540 BULKHEAD - WIRE BUNDLE CLAMP REPLACEMENT AND

TEFLON SLEEVE INSTALLATION

1. Open the forward cargo compartment door. Refer to 737-300/400 /500 AMM 52-31-00 as an accepted procedure.

2. Remove and keep the forward cargo compartment bulkhead lining to get access to the Station 540 bulkhead in the forward cargo compartment. Refer to 737-300/400/500 AMM 25-52-81 as an accepted procedure.

3. RC - Replace wire bundle clamps and install TFE-2X Teflon sleeve under the clamps on the wire bundle installation along the Station 540 bulkhead in the forward cargo compartment:

a. Group 2, 8-9:

In accordance with FIGURE 33.

b. Group 3, 10-15:

In accordance with FIGURE 34.

c. Group 4-7, 16-32, 37-45, 49-59:

In accordance with FIGURE 35.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: February 08, 2019 737-57A1321 56 of 289 BOEING SERVICE BULLETIN 737-57A1321

ALERTALERT

d. Group 33-35:

In accordance with FIGURE 36.

e. Group 36, 46-48:

In accordance with FIGURE 37.

4. Install kept forward cargo compartment bulkhead lining. Refer to 737-300/400/500 AMM 25-52-81 as an accepted procedure.

5. Close the forward cargo compartment door. Refer to 737-300/40 0/500 AMM 52-31-00 as an accepted procedure.

6. Put the airplane back to a serviceable condition.

Group 2-59:

WORK PACKAGE 5 - EXTERNAL TO THE FUEL TANKS AT THE MAIN WHEEL WELL STATION 663 BULKHEAD - WIRE BUNDLE CLAMP REPLACEMENT AND TEFLON SLEEVE INSTALLATION

1. Open the left and right main landing gear door and install th e main gear ground lock assembly.

Refer to 737-300/400/500 AMM 32-00-01 as an accepted procedure.

2. RC - Replace wire bundle clamps and install TFE-2X Teflon sleeve under the clamps on the wire bundle installation along the Station 663 bulkhead in the main wheel well:

a. Group 10-11, 16-19, 36-39, 46, 49-50:

In accordance with FIGURE 38.

b. Group 2, 4, 8-9, 12, 20, 40-41, 47, 51, 56:

In accordance with FIGURE 39.

c. Group 13-14, 21-22, 42-44, 48, 52-54:

In accordance with FIGURE 40.

d. Group 5, 15, 23, 55, 57:

In accordance with FIGURE 41.

e. Group 24-27, 33:

In accordance with FIGURE 42.

f. Group 28-29, 34:

In accordance with FIGURE 43.

g. Group 3, 6-7, 30-32, 35, 45, 58-59:

In accordance with FIGURE 44.

3. Remove the main gear ground lock assembly and close the left and right main landing gear door.

Refer to 737-300/400/500 AMM 32-00-01 as an accepted procedure.

4. Put the airplane back to a serviceable condition.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: February 08, 2019 737-57A1321 57 of 289 BOEING SERVICE BULLETIN 737-57A1321

ALERTALERT

Page 58OCROpen in PDF

BOEING SERVICE BULLETIN 737-57A1321

ALERT ALERT This Figure applies only to: Group 2-48, 56-59.

WBL

71.24 WBL

541.69

REAR SPAR

UPPER CHORD RIB NO.

RIB NO. 2

- REAR SPAR WEB

REAR SPAR

LOWER CHORD INBD VIEW LOOKING AFT THROUGH ACCESS DOOR NO. 1, 7202 2218491 FIGURE 1: LEFT WING REAR SPAR - FUEL TANK FASTENERS - LOCATION (SHEET 1 OF 3) Original Issue: February 08, 2019 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 68789

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The fastener quantity or configuration can be different than that shown at the identified locations, thus make sure that all fasteners at the identified locations are included.

More DataQtyIdentificationNameTaskStep 3-FASTENERLocate1 2-FASTENERLocate2 2-FASTENERLocate3 FIGURE 1: LEFT WING REAR SPAR - FUEL TANK FASTENERS - LOCATION (SHEET 2 OF 3) Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: February 08, 2019 737-57A1321 59 of 289 BOEING SERVICE BULLETIN 737-57A1321

ALERTALERT

More DataQtyIdentificationNameTaskStep 10-FASTENERLocate4 10-FASTENERLocate5 FIGURE 1: LEFT WING REAR SPAR - FUEL TANK FASTENERS - LOCATION (SHEET 3 OF 3) Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.