TextPartly OCR
Some pages are OCR from a scan. OCR can misread letters and numbers.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '0123dac1b45494a6d861c3817a1bd1e7b0af1e7b5b07b8116b604eee33adb5c4' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '0123dac1b45494a6d861c3817a1bd1e7b0af1e7b5b07b8116b604eee33adb5c4' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
Commercial Airplanes 747 Service Bulletin ALERT Number: 747-21A2523 Original Issue: August 27, 2010 Revision 2: June 07, 2013 ATA System: 2121 SUBJECT: AIR CONDITIONING - Main Distribution Manifold - Temperature Sensor and EE Cooling Three-Way Logic Change Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 300-774). An export license may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data has the individual responsibility to abide by all export laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET Copyright © 2010 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.
Original Issue: August 27, 2010 747-21A2523Revision 2: June 07, 2013 1 of 166
6.0
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010 747-21A2523Revision 2: June 07, 2013 2 of 166 BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT
BLANK PAGE
Table of Contents
Revision Transmittal Sheet5
Summary7
1. PLANNING INFORMATION ........................................ 1 1 A. Effectivity ............................................... 1 1
1. Airplanes ............................................ 1 1
2. Spares Affected ........................................ 1 5 B. Concurrent Requirements ...................................... 1 5 C. Reason ................................................ 1 6 D. Description .............................................. 1 7 E. Compliance .............................................. 1 8 F. Approval ............................................... 1 9 G. Manpower .............................................. 1 9 H. Weight and Balance Changes .................................... 2 5 I. Electrical Load Data ......................................... 2 5 J. References .............................................. 2 5
1. Existing Data: ......................................... 2 5
2. Data Supplied with this Service Bulletin: ........................... 2 6
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 2 6 K. Publications Affected ........................................ 2 6 L. Interchangeability and Intermixability of Parts ........................... 2 6 M. Software Accomplishment Summary ................................ 2 6
2. MATERIAL INFORMATION ........................................ 2 7 A. Material - Price and Availability ................................... 2 7 B. Industry Support Information .................................... 2 8 C. Parts Necessary for Each Airplane ................................. 2 8
1. Kits/Parts ............................................ 2 8
2. Parts and Materials Supplied by the Operator ........................ 3 1
3. Parts Modified and Reidentified ................................ 3 6
4. Parts Removed and Not Replaced .............................. 3 6 D. Parts Necessary to Change Spares ................................. 3 6 E. Special Tooling - Price and Availability ............................... 3 6 F. Special Tooling Necessary to do this Service Bulletin ....................... 3 6
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 3 7 A. GENERAL INFORMATION ..................................... 3 7 B. WORK INSTRUCTIONS ....................................... 3 8 FIGURE 1: AIR CONDITIONING EQUIPMENT BAY - INSULATED DUCT ASSEMBLY - REMOVAL [Group 1-5, 10; Group 11, Configuration 1; Group 12-14; Group 15, Configuration 1; Group 16-21] . 50 FIGURE 2: AIR CONDITIONING EQUIPMENT BAY - DUCT ASSEMBLY - REMOVAL [Group 6-9] . . 55 FIGURE 3: AIR CONDITIONING EQUIPMENT BAY - INSULATED DUCT ASSEMBLY - INSTALLATION [Group 1-5] ........................................... 6 0 FIGURE 4: AIR CONDITIONING EQUIPMENT BAY - DUCT ASSEMBLY - INSTALLATION [Group 6-9] .................................................. 6 6 FIGURE 5: AIR CONDITIONING EQUIPMENT BAY - INSULATED DUCT ASSEMBLY - INSTALLATION [Group 10; Group 11, Configuration 1; Group 12-14; Group 15, Configuration 1; Group 16-21] .................................................. 7 2 FIGURE 6: P414 PANEL - WIRE BUNDLE W3844 - WIRING CHANGE [Group 1, 3, 6-7] ....... 7 8 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010 747-21A2523Revision 2: June 07, 2013 3 of 166 BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT
FIGURE 7: P414 PANEL - WIRE BUNDLE W3844 - WIRING CHANGE [Group 2, 4-5, 8-9] ...... 8 0 FIGURE 8: P414 PANEL - WIRE BUNDLE W3844 - ROUTING [Group 1-9] .............. 8 2 FIGURE 9: P414 PANEL TO MAIN EQUIPMENT CENTER, E2-4 SHELF - WIRE BUNDLE W4753 - WIRING CHANGE [Group 1, 3, 6-7] ................................... 8 7 FIGURE 10: P414 PANEL TO MAIN EQUIPMENT CENTER, E2-4 SHELF - WIRE BUNDLE W4753 - WIRING CHANGE [Group 2, 4-5, 8-9] .................................. 8 9 FIGURE 11: P414 PANEL TO MAIN EQUIPMENT CENTER, E2-4 SHELF - WIRE BUNDLE W4753 - ROUTING [Group 1-9] ..................................... 9 1 FIGURE 12: MAIN EQUIPMENT CENTER, E2-4 SHELF - WIRE WRAP WIRING CHANGE [Group 1-9] . 99 FIGURE 13: P414 PANEL - WIRE BUNDLE W3842 - WIRING CHANGE [Group 10] .......... 1 0 3 FIGURE 14: P414 PANEL - WIRE BUNDLE W3842 AND WIRE BUNDLE W3844 - WIRING CHANGE [Group 11, Configuration 1] ...................................... 1 0 5 FIGURE 15: P414 PANEL - WIRE BUNDLE W3842 AND WIRE BUNDLE W3844 - WIRING CHANGE [Group 12] ............................................... 1 0 7 FIGURE 16: P414 PANEL - WIRE BUNDLE W3842 AND WIRE BUNDLE W3844 - WIRING CHANGE [Group 13] ............................................... 1 0 9 FIGURE 17: P414 PANEL - WIRE BUNDLE W3842 AND WIRE BUNDLE W3844 - WIRING CHANGE [Group 14] ............................................... 1 1 1 FIGURE 18: P414 PANEL - WIRE BUNDLE W3842 AND WIRE BUNDLE W3844 - WIRING CHANGE [Group 15, Configuration 1] ...................................... 1 1 3 FIGURE 19: P414 PANEL - WIRE BUNDLE W3842 AND WIRE BUNDLE W3844 - WIRING CHANGE [Group 16-17, 19-20] ......................................... 1 1 5 FIGURE 20: P414 PANEL - WIRE BUNDLE W3842 AND WIRE BUNDLE W3844 - WIRING CHANGE [Group 18] ............................................... 1 1 7 FIGURE 21: P414 PANEL - WIRE BUNDLE W3842 - ROUTING [Group 10] .............. 1 1 9 FIGURE 22: P414 PANEL TO M7603 CARD FILE TO E2-4 SHELF - WIRE BUNDLE W4489 - WIRING CHANGE [Group 10, 14] ................................... 1 2 5 FIGURE 23: P414 PANEL TO M7603 CARD FILE TO E2-4 SHELF - WIRE BUNDLE W4489 - WIRING CHANGE [Group 15, Configuration 1] ............................ 1 2 7 FIGURE 24: P414 PANEL TO M7603 CARD FILE TO E2-4 SHELF - WIRE BUNDLE W4489 - WIRING CHANGE [Group 11, Configuration 1; Group 12-13, 16-21] ................ 1 2 9 FIGURE 25: P414 PANEL TO M7603 CARD FILE TO E2-4 SHELF - WIRE BUNDLE W4489 - ROUTING [Group 10; Group 11, Configuration 1; Group 12-14; Group 15, Configuration 1; Group 16-21] ................................................. 1 3 1 FIGURE 26: P414 PANEL - WIRE BUNDLE W3842 AND WIRE BUNDLE W3844 - ROUTING [Group 11-12] ................................................. 1 4 2 FIGURE 27: P414 PANEL - WIRE BUNDLE W3842 AND WIRE BUNDLE W3844 - ROUTING [Group 13] ................................................. 1 4 8 FIGURE 28: P414 PANEL - WIRE BUNDLE W3842 AND WIRE BUNDLE W3844 - ROUTING [Group 14-21] ................................................. 1 5 4 FIGURE 29: P414 PANEL - WIRE BUNDLE W3842 AND WIRE BUNDLE W3844 - WIRING CHANGE [Group 21] ............................................... 1 5 9 FIGURE 30: P414 PANEL - WIRE BUNDLE W3844 - WIRING CHANGE [Group 11, Configuration 2] . 161 FIGURE 31: P414 PANEL - WIRE BUNDLE W3844 - WIRING CHANGE [Group 15, Configuration 2] . 163 FIGURE 32: P414 PANEL TO SM11 - WIRE BUNDLE W4489 - WIRING CHANGE [Group 15, Configuration 2 ] ................................................ 1 6 5 FIGURE 33: P414 PANEL TO SM11 - WIRE BUNDLE W4489 - WIRING CHANGE [Group 11, Configuration 2 ] ................................................ 1 6 6 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010 747-21A2523Revision 2: June 07, 2013 4 of 166 BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT
Commercial Airplanes 747 Service Bulletin ALERT Revision Transmittal SheetNumber: 747-21A2523Original Issue: August 27, 2010 Revision 2: June 07, 2013 ATA System: 2121 SUBJECT: AIR CONDITIONING - Main Distribution Manifold - Temperature Sensor and EE Cooling Three-Way Logic Change This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION Federal Aviation Administration (FAA) Airworthiness Directive AD 2012-24-10 is related to this service bulletin.
Airplane RT061 was added to new Group 21 of this service bulletin effectivity.
More work is necessary on 747-400BCF airplane(s) changed in accordance with Original Issue or Revision 1 of this service bulletin. During production modification of a 747-400 airplane into the Boeing Converted Freighter (BCF) configuration, additional wiring change was found to be required for crew rest heat. Boeing is aware of some airplanes in groups 11 or 15 that will require this additional wiring. New accomplishment instructions are added as Part 3 with new figures describing this additional wiring change. If the additional wiring change is not done to previously modified BCF airplanes, crew rest heat will not be available below 25,000 feet altitude.
No more work is necessary on 747-400F airplane(s) changed in accordance with Original Issue or Revision 1 of this service bulletin.
REASON FOR REVISION This revision is sent to add one 747-400BCF airplane, correct wiring instructions for all 747-400BCF airplanes, revise and expand 747-400BCF airplane grouping, revise two airplane groups into 2 configurations depending on prior incorporation of the service bulletin, revise manpower estimates for all affected airplanes, and to note that some airplanes have a union and hose connected to a port in the duct to be replaced while others have a plug in that port.
These sections were changed:
1. SUMMARY: Summary Table is added to comply with current standards.
2. Paragraph 1.A., Effectivity:
a. Airplane RT520 is moved from Group 15 to added Group 19.
b. Airplanes RT071-RT072, RT075, RT161, and RT164 are moved from Group 15 to added Group
20.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010 747-21A2523Revision 2: June 07, 2013 5 of 166
c. Airplane RT061 is added and becomes added Group 21.
d. Airplanes Groups 11 and 15 are changed to 2 configurations because some airplanes have been modified in accordance with Original Issue or Revision 1 of this service bulletin and will require different wiring rework from airplanes not yet modified.
3. Paragraph 1. B., Concurrent Requirements: Added new groups to applicability.
4. Paragraph 1. C., Reason: Added Revision 2 statement.
5. Paragraph 1. D., Description: Added Revision 2 statement.
6. Paragraph 1. E., Compliance: Added AD 2012-24-10 reference and Revision 2 statement.
7. Paragraph 1. G., Manpower: Revised existing tables and added tables for added groups and configurations.
8. Paragraph 1. K., Publications Affected: Revised to show that 747-400 Flight Crew Operations Manual is not affected.
9. Paragraph 3.B., Accomplishment Instructions, Part 2: A test step related to crew rest heat is added for Group 10 - 21 airplanes (BCF airplanes).
10. Paragraph 3.B., Accomplishment Instructions, Part 3. This new part is added applicable to BCF airplanes to describe additional work required for airplanes previously modified.
11. Figures 1 through 5: Noted that some airplanes have a union and hose connected to a port in the duct to be replaced while others have a plug in that port.
12. Figures 1, 5, 14, 18, 20, 23 - 25, 28: revised group applicability.
13. Figures 29 - 33: Added new.
The data given in Information Notice 747-747-21A2523 IN 01 is included in this revision. The data given in Information Notice 747-747-21A2523 IN 02 is superseded by this revision.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location of important changes.
Pages with no vertical lines have no important changes.
REVISION HISTORY August 27, 2010Original Issue:
October 03, 2011Revision 1:
June 07, 2013Revision 2:
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010 747-21A2523Revision 2: June 07, 2013 6 of 166 BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT
Commercial Airplanes 747 Service Bulletin ALERT SummaryNumber: 747-21A2523Original Issue: August 27, 2010 Revision 2: June 07, 2013 ATA System: 2121 SUBJECT: AIR CONDITIONING - Main Distribution Manifold - Temperature Sensor and EE Cooling Three-Way Logic Change
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO THE NEW OWNER.
CONCURRENT REQUIREMENTS Refer to Paragraph 1.B., Concurrent Requirements.
BACKGROUND Do this change to remove moisture in the Flight Deck Cooling supply air. During flight, moisture could cause the Integrated Display Unit (IDU) to blink, lose focus, or display in monochrome and the Mode Control Panel (MCP) to go blank. If this service bulletin is not done, the IDU could blink, lose focus, or display in monochrome and the MCP go blank, which could reduce the ability of the flight crew to maintain the safe flight and landing of the airplane.
Boeing has received reports of display malfunctions and MCP malfunctions on 747-400 Freighter type aircraft.
The reports range from a single display malfunction to all six primary display units going blank with an MCP malfunction, during various flight phases.
This change includes Integrated Display System (IDS) software that gives crews an Alert Engine Indication and Crew Alerting System (EICAS) message when the pack temperature sensor calibrations drift to unacceptable levels; replacement of the duct assemblies with the pack temperature sensors in a new location; and Electronic Equipment (EE) cooling wire bundle changes to change the function of the equipment cooling three-way valve to remove temperature transients that can cause condensation on flight deck equipment.
As a part of a service bulletin validation program, this change was completed on airplane RM888, by service bulletin 747-21A2523, Original Issue, before the release of Revision 1 of this service bulletin. The change completed on airplane RM888 by Service Bulletin 747-21A2523, Original Issue, is equivalent to the release of Revision 1 of this service bulletin. Airplane RM888 has the configuration of a Group 5 airplane.
Boeing Fleet Team Digest (FTD) 747-400 FTD 31-08001 is related to this service bulletin.
Boeing Service Related Problem (SRP) 747-SRP-21-0177 is related to this service bulletin.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010 747-21A2523Revision 2: June 07, 2013 7 of 166
This table is provided to operators for planning purposes only. Refer to the applicable sections for more information.
ReferenceAffectedPlanning Data Paragraph 1.A.2., Spares AffectedNoSpares Affected Paragraph 1.E., Compliance and Paragraph
1.F., Approval YesAD Related Paragraph 1.H., Weight and Balance ChangesYesWeight and Balance Change Paragraph 1.I., Electrical Load DataNoElectrical Load Changed Paragraph 1.K., Publications AffectedYesPublications Affected Paragraph 1.K., Publications AffectedNoAirplane Flight Operations Affected (Flight Crew Operations Manual and/or FAA Approved Airplane Flight Manual) Paragraph 2.C.1., Kits/PartsYesKits/Parts Required Paragraph 2.C.2., Parts and Materials Supplied by the Operator YesOperator Supplied Parts/Material Paragraph 2.F., Special Tooling Necessary to do this Service Bulletin NoSpecial Tooling Required ACTION (PRR 85901-101RS)
1. Install IDS 508 Software in accordance with Boeing service bulletin 747-31-2426, 747-31-2427 or 747-31-2428.
2. Get access to the Air Conditioning Equipment Bay and replace an existing Pack 3 duct assembly with a new Pack 3 duct assembly. Remove the temperature sensors, over temperature switch, drain tube union, plug and insulation (if applicable) from the existing pack 3 duct assembly and install them on the new Pack 3 duct assembly.
3. Get access to the P414 panel, in the left power distribution center, the E2-4 shelf, in the right main equipment center and the M7603 card file, if applicable. Change and route the control wiring for the equipment cooling three-way valve.
4. Get access to the equipment cooling three-way valve, V555, in the forward cargo compartment, and test the new control wiring and logic operation. On the flight deck, test the Pack 3 discharge temperature sensors.
EFFECTIVITY 747-400 and 747-400F Airplanes. Refer to Paragraph 1.A.1., Airplanes, for the list of affected airplanes.
COMPLIANCE Refer to Paragraph 1.E., Compliance.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010 747-21A2523Revision 2: June 07, 2013 8 of 166 BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT
INDUSTRY SUPPORT INFORMATION Boeing warranty remedies are available for airplanes in warranty as of November 13, 2008. Please refer to Paragraph 2.B., Industry Support Information.
MANPOWER Refer to Paragraph 1.G., Manpower.
MATERIAL INFORMATION Boeing Supplied Kits/Parts.
Refer to Paragraph 2.A., Material - Price and Availability.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010 747-21A2523Revision 2: June 07, 2013 9 of 166 BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT
BOEING SERVICE BULLETIN 747-21A2523
ALERT ALERT
CHANGE AND ROUTE THE CONTROL WIRING FOR THE PACK 3 GROUND
EQUIPMENT COOLING THREE SERVICE CONNECTOR WAY VALVE.
REPLACE THE EXISTING DUCT
ASSEMBLY WITH A NEW DUCT ASSEMBLY.
AIR CONDITIONING EQUIPMENT BAY 1924233 Original Issue: August 27, 2010 Revision 2: June 07, 2013 PROPRIETARY - Copyright © Unpublished Export Controlled ECCN: 9E991 - BOEING 747-21A2523 Work - See page 1 for details. 10 of 166
Commercial Airplanes 747 Service Bulletin ALERT Number: 747-21A2523 Original Issue: August 27, 2010 Revision 2: June 07, 2013 ATA System: 2121 SUBJECT: AIR CONDITIONING - Main Distribution Manifold - Temperature Sensor and EE Cooling Three-Way Logic Change
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO THE NEW OWNER.
1. PLANNING INFORMATION A. Effectivity
1. Airplanes Refer to Service Bulletin Index D6-30300, Part 3 for Airplane Variable Number, Line Number, and Serial Number data.
This service bulletin is for the airplanes shown below. Refer to PRR 85901-101RS for data about this change.
DESCRIPTIONCONFIGURATIONGROUP 747-400F airplanes with GE engines, insulation on the existing duct, and wiring changes.
-1 747-400F airplanes with GE engines, insulation on the existing duct, and wiring changes.
-2 747-400F airplanes with P&W engines, insulation on the existing duct, and wiring changes.
-3 747-400F airplanes with P&W engines, insulation on the existing duct, and wiring changes.
-4 747-400F airplanes with Rolls-Royce engines, insulation on the existing duct, and wiring changes.
-5 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010 747-21A2523Revision 2: June 07, 2013 11 of 166
DESCRIPTIONCONFIGURATIONGROUP 747-400F airplanes with GE engines, no insulation on the existing duct, and wiring changes.
-6 747-400F airplanes with P&W engines, no insulation on the existing duct, and wiring changes.
-7 747-400F airplanes with P&W engines, no insulation on the existing duct, and wiring changes.
-8 747-400F airplanes with Rolls-Royce engines, no insulation on the existing duct, and wiring changes.
-9 747-400 airplanes with a converted freighter configuration, P&W engines and wiring changes.
-10 747-400 airplanes with a converted freighter configuration, P&W engines and wiring changes.
-11 Not modified in accordance with Original Release or Revision 1 of this SB.
1 Modified in accordance with Original Release or Revision 1 of this SB.
2 747-400 airplanes with a converted freighter configuration, GE engines and wiring changes.
-12 747-400 airplanes with a converted freighter configuration, GE engines and wiring changes.
-13 747-400 airplanes with a converted freighter configuration, Rolls-Royce engines and wiring changes.
-14 747-400 airplanes with a converted freighter configuration, P&W engines and wiring changes.
-15 Not modified in accordance with Original Release or Revision 1 of this SB.
1 Modified in accordance with Original Release or Revision 1 of this SB.
2 747-400 airplanes with a converted freighter configuration, GE engines and wiring changes.
-16 747-400 airplanes with a converted freighter configuration, P&W engines and wiring changes.
-17 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010 747-21A2523Revision 2: June 07, 2013 12 of 166 BOEING SERVICE BULLETIN 747-21A2523