Copy · Boeing Service Bulletin (2) · 91 pages

© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2009-0454; AD 2010-14-08 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

Text

From the PDF’s text layer: layout, tables and figures are lost. The PDF is the document.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '557d97b8ea8da34cf404a08206637e79061826dd6fea13a045528f5eb27c532d'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Show pages 1–12

Original Issue: March 15, 2007 Revision 2: August 13, 2009 747-28A2262 BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 13 of 91 BOEING SERVICE BULLETIN 747-28A2262

AIR PULLMANTUR (PUL) 1 RT523 RT525 RT749

ALL NIPPON AIRWAYS (ANA) 1 RT753–RT755 RT777 2 RT776

ASIANA AIRLINES (AAR) 1 RM071 RT131–RT136 RU032

ATLAS AIR (TLS) 2 RT752 AVION AIRCRAFT TRADING H.F. (VNG) 1 RT634

BAHRAIN ROYAL FLIGHT (BHR) 1R M 4 2 6

BRITISH AIRWAYS (BAB) 1 RM096–RM097 RM136–RM145 RM261–RM264 RT488–RT499 RU121 RU126–RU132 3 RT485–RT487 7 RT471–RT484

CATHAY PACIFIC AIRWAYS (CAT) 1 RT457–RT469 RT511–RT512 RT514 RT517–RT518 RT522 RT528–RT529 RT782 RT837 2 RT781 3 RT455–RT456 RT508 7 RT451–RT454

CHINA AIRLINES (CHI) 1 RM021–RM024 RT636–RT640

CORSAIR (COR) 1 RT613–RT614 RT616 RT618–RT619 RT621

DRAGONAIR (DRG) 1 RT510 RT513 RT516 RT519 RT524

DUBAI AIR WING (DAW) 1 RM167–RM168 RT102

EL AL ISRAEL AIRLINES (ELA) 1 RM091 RT527 RU081–RU083

EVA AIR (EVA) 1 RM116–RM117 RT162–RT163 RT165–RT168 RT951–RT955

Original Issue: March 15, 2007 Revision 2: August 13, 2009 747-28A2262 BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 14 of 91 BOEING SERVICE BULLETIN 747-28A2262

EVERGREEN INTERNATIONAL A/L (EVR) 1 RT743 7 RT631–RT632

EXPORT RESTRICTED AIRPLANES (YWV) 1 RT620 3 RT606 7 RT602

GARUDA INDONESIA (GIA) 1 RT931 RU061–RU062

GECAS (GEF) 1 RT412 RT615 RT622

GREAT WALL AIRLINES (GWL) 1 RT520

HIS MAJESTY THE SULTAN'S FLIGHT (BWN) 1 RT440

JAL INTERNATIONAL (JAL) 1 RT861–RT864 2 RT648–RT650 6 RT641–RT647

KALITTA AIR (KAC) 6 RT021–RT022

KLM - ROYAL DUTCH AIRLINES (KLM) 1 RM801–RM803 RT006–RT014 6 RT001–RT005

KOREAN AIR (KAL) 1 RM011–RM013 RT575–RT588 RT590 RT811–RT814 3 RT574 6 RT061 7 RT571–RT573

KUWAIT AIRWAYS (KUW) 1 RT151

LION AIR (MLI) 7 RT503 RT505

LUFTHANSA GERMAN AIRLINES (DLH) 1 RT045–RT047 RT437–RT439 RT441–RT447 4 RT431–RT436 6 RT043–RT044

MALAYSIA AIRLINES (MAS) 1 RM036–RM040 RM366–RM367 RT744 RT746 RT748 RT750 RU016–RU017

Original Issue: March 15, 2007 Revision 2: August 13, 2009 747-28A2262 BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 15 of 91 BOEING SERVICE BULLETIN 747-28A2262

MARTINAIR HOLLAND (MTH) 3 RT509 7 RT501 RT506–RT507

NORTHWEST AIRLINES (NWA) 1 RM241–RM246 7 RT401–RT410

OMAN ROYAL FLIGHT (RFO) 1R M 0 1 0

PHILIPPINE AIRLINES (PAL) 1 RT152 RU051–RU052 RU059–RU060

PRESIDENTIAL FLIGHT (ABD) 1 RM084 RT137

QANTAS (QAN) 1 RF001–RF006 RM331–RM333 RT559–RT568 RT742 RU031 5 RT551–RT558 6 RT741

SAUDI ARABIAN AIRLINES (SVA) 1 RM156–RM157 RU101–RU102

SAUDI ROYAL FLIGHT (SRF) 1R M 1 5 8

SINGAPORE AIRLINES (SIA) 1 RM041–RM045 RT521 RT526 RT530 RT831–RT835

SONAIR (SON) 1 RM231–RM233

SOUTH AFRICAN AIRWAYS (SAA) 1 RM081 RM083 RM147

THAI AIRWAYS INTERNATIONAL (TII) 1 RM026–RM030 RM431 RT694–RT699 RT801–RT803 2 RT693 6 RT691–RT692

TRANSAERO AIRLINES (TRX) 1 RM146 RT783–RT784

UNITED AIR LINES (UAL) 1 RM166 RM169–RM177 RT411 RT609–RT612 RT617 RT623–RT630 3 RT607–RT608 7 RT601 RT603–RT605

Original Issue: March 15, 2007 Revision 2: August 13, 2009 747-28A2262 BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 16 of 91 BOEING SERVICE BULLETIN 747-28A2262

UPS (UPS) 1 RT161 RT164

VIRGIN ATLANTIC AIRWAYS (VAA) 1 RM051–RM053 RM351–RM355 RT945–RT949 WORLD AIRWAYS, INC. (WLD) 1 RT745 RT747

IDENTIFICATION BY VARIABLE NUMBER Variable Group RF001–RF006 1 RM010–RM013 1 RM021–RM024 1 RM026–RM030 1 RM036–RM045 1 RM051–RM053 1 RM071 1 RM081–RM084 1 RM091 1 RM096–RM097 1 RM116–RM117 1 RM136–RM147 1 RM156–RM158 1 RM166–RM177 1 RM191–RM192 1 RM231–RM233 1 RM241–RM246 1 RM261–RM264 1 RM331–RM333 1 RM341 1 RM351–RM355 1 RM366–RM367 1 RM401–RM402 1 RM426 1 RM431 1 RM801–RM803 1 RT001–RT005 6 RT006–RT014 1 RT021–RT022 6 RT043–RT044 6

Original Issue: March 15, 2007 Revision 2: August 13, 2009 747-28A2262 BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 17 of 91 BOEING SERVICE BULLETIN 747-28A2262

RT045–RT047 1 RT061 6 RT071–RT073 1 RT101–RT103 1 RT121 1 RT131–RT137 1 RT151–RT152 1 RT161–RT168 1 RT401–RT410 7 RT411–RT412 1 RT431–RT436 4 RT437–RT447 1 RT451–RT454 7 RT455–RT456 3 RT457–RT469 1 RT471–RT484 7 RT485–RT487 3 RT488–RT499 1 RT501–RT507 7 RT508–RT509 3 RT510–RT530 1 RT551–RT558 5 RT559–RT568 1 RT571–RT573 7 RT574 3 RT575–RT590 1 RT591 4 RT601–RT605 7 RT606–RT608 3 RT609–RT630 1 RT631–RT632 7 RT633–RT640 1 RT641–RT647 6 RT648–RT650 2 RT671 8 RT672 3 RT673 1 RT691–RT692 6 RT693 2 Variable Group

Original Issue: March 15, 2007 Revision 2: August 13, 2009 747-28A2262 BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 18 of 91 BOEING SERVICE BULLETIN 747-28A2262

2. Spares Affected None.

B. Concurrent Requirements Boeing service bulletin 747-31-2376 Original Issue for General Electric powered airplanes, 747-31- 2377 Original Issue for Pratt and Whitney powered airplanes or 747-31-2378 Original Issue for Rolls Royce powered airplanes, is necessary to be accomplished prior to or concurrent with this service bulletin. The service bulletins will install updated Integrated Display System (IDS) software on the affected airplanes.

RT694–RT699 1 RT701–RT702 2 RT703 9 RT704 1 RT741 6 RT742–RT750 1 RT751 6 RT752 2 RT753–RT755 1 RT776 2 RT777 1 RT781 2 RT782–RT784 1 RT801–RT803 1 RT811–RT814 1 RT831–RT837 1 RT861–RT864 1 RT931–RT932 1 RT945–RT949 1 RT951–RT955 1 RU016–RU017 1 RU031–RU032 1 RU051–RU052 1 RU059–RU062 1 RU081–RU083 1 RU101–RU102 1 RU121 1 RU126–RU132 1 Variable Group

Original Issue: March 15, 2007 Revision 2: August 13, 2009 747-28A2262 BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 19 of 91 BOEING SERVICE BULLETIN 747-28A2262

C. Reason This service bulletin installs an automatic shut off system for the Horizontal Stabilizer Tank fuel pumps. Installation of the automatic system will prevent a potential ignition source in the tank by making sure the pumps do not run dry for an extended period of time when the fuel level is below the pump inlet. The dry running of the pumps could result in fire/explosion of the fuel tank.

Currently the flight crew turns off the pumps when a low pressure indication is displayed on Engine Indication and Crew Alerting System (EICAS) and the "PRESS" lights for the pumps are ON. The automatic shut off system installed by this service bulletin will make sure the pumps will not run for more than 14 seconds with continuous low fuel pressure and if the flight crew does not respond to the indication sooner. The flight crew remains in primary control, with this automatic shut off system as a backup, to turn the pumps off after a low pressure indication.

This change affects section 9 of the Maintenance Planning Data (MPD) Document. New Airworthiness Limitations (AWL) "28-AWL-24" will be added to section 9 of the MPD to include a functional check of the horizontal stabilizer fuel boost pump Automatic Shutoff System. This change also affects Section 1 of the FAA Approved Airplane Flight Manual.

This service bulletin is the result of the safety assessments conducted by Boeing under Special Federal Aviation Regulation (SFAR) 88, "Fuel Tank System Fault Tolerance Evaluation Requirements".

Revision 1 is sent to address comments received from operators since the initial release of the service bulletin. It was found that certain airplanes have a different configuration on the E-8 rack then what is shown in figures 1 and 3. This revision also includes changes identified during the validation of the service bulletin.

As a part of a service bulletin validation program, this change was completed on airplane RT672 by Service Bulletin 747-28A2262 before the release of Revision 1 of this service bulletin. The change was completed on airplane RT672 by Service Bulletin 747-28A2262 is equivalent to Revision 1 of this service bulletin. Airplane RT672 has the configuration of a Group 3 airplane.

The following sections of the service bulletin were changed:

1. Planning Information Section 1, Effectivity, airplane grouping was revised to add new airplane groups. The following airplanes have been removed from figures 1 and 3 and added to the new figures 17 and 18.

— Airplanes RT551-RT558 were deleted from Group 1 and moved to the new Group 5.

— Airplanes RT001-RT005, RT021-RT022, RT043-RT044, RT061, RT641-RT647, RT691- RT692, RT741 and RT751 were deleted from Group 2 and moved to the new Group 6.

— Airplanes RT401-RT410, RT451-RT454, RT471-RT484, RT501-RT507, RT571-RT573, RT601-RT605, RT631-RT632 and RT671 were deleted from Group 3 and moved to the new Group 7.

2. Approval Section 1, Added new AD to Approval statement, AD 2007-13-04.

3. Accomplishment Instructions Section 3, Work Instruction B.15 and B.17 were revised to correct the Group applicability.

4. Accomplishment Instructions Section 3, Work Instruction B.20, Functional Test, was revised to clarify the steps.

Original Issue: March 15, 2007 Revision 2: August 13, 2009 747-28A2262 BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 20 of 91 BOEING SERVICE BULLETIN 747-28A2262

5. Accomplishment Instructions Section 3, Work Instruction B.11 and B.12, Group applicability was revised to add Group 5.

6. Accomplishment Instructions Section 3, Work Instruction B.13 and B.14, Group applicability was revised to add Group 6.

7. Accomplishment Instructions Section 3, Work Instruction B.16 and B.17, Group applicability was revised to add Group 7.

8. Figures 12, 15 and 16 were updated to be in accordance with the wire wrap requirements shown in Chapter 20 of the Standard Wire Practices Manual (SWPM).

9. Figures 1 and 3 revised to remove Group 4 airplanes.

10. Figures 9-16 updated the Group applicability.

11. Figures 17 and 18 added new figures for Group 4, 5, 6 and 7 airplanes.

12. Figure 11 corrected typographical error for flag note 2.

The data given in Information Notice 767-28-2262 IN 01 and 767-28A2262 IN 02 is included in this revision Revision 2 is sent to address comments received from operators since the original issue and Revision 1 of the service bulletin.

Airplane RT671 was moved from Group 7 to new Group 8.

Airplane RT703 was moved from Group 1 to new Group 9.

Boeing found the Work Instructions B.4, B.5 and B.7 through B.16 in Revision 1, did not agree with the figure numbers given in the service bulletin. After investigating, Boeing found that during the preparation of Revision 1, the Figure 2 was inadvertently moved to a different part of the service bulletin. This caused the figures to renumber according to their order of placement in the service bulletin. This revision restores the Figure 2 into its correct location in the document. This restores the correct figure number assigned to the Figure. The figure numbers 1 through 16 in Revision 2 agree with the figure numbers in the original issue of service bulletin 747-28A2262.

The following sections of the service bulletin were changed:

1. Groups 8 and 9 were added to Group and Configuration tables in Section 1, Manpower table, Weight and Balance table and Material Information Section 2 where applicable.

2. Compliance and Approval section, removed reference to Airworthiness Directive 2002-24-51 and Airworthiness Directive 2002-24-52 which are superseded by Airworthiness Directive 2007-13-

04.

3. Compliance statements in the Summary and Planning sections were revised with the wording "original issue date".

4. Material Information Section 2, Parts and Material Supplied by Operator, Added, contact BACC47CP3S as operator supplied for airplanes RT043-RT047 and RT433-RT477 only.

Original Issue: March 15, 2007 Revision 2: August 13, 2009 747-28A2262 BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 21 of 91 BOEING SERVICE BULLETIN 747-28A2262

5. Accomplishment Instruction Section 3:

— added Step B.9, for new Groups 8 and 9.

— added Group 8 to Work Instruction Steps B.3-B.4, B.6-B.7, B.9-B.11, B.17-B.18.

— added Group 9 to Work Instruction Steps B.2, B.4-B.5, B.7, B.9-B.13.

6. Revised Figures numbers 2 through 14:

— Figure 2, restored to Figure 3.

— Figure 3, restored to Figure 4.

— Figure 4, restored to Figure 5.

— Figure 5, restored to Figure 6.

— Figure 6, restored to Figure 7.

— Figure 7, restored to Figure 8.

— Figure 8, restored to Figure 9.

— Figure 9, restored to Figure 10.

— Figure 10, restored to Figure 11.

— Figure 11, restored to Figure 12.

— Figure 12, restored to Figure 13.

— Figure 13, restored to Figure 14.

— Figure 14, restored to Figure 2.

7. Figures 2, 4-5, 7-8, 14-15, 17-19 added Group 8 applicability.

8. Figures 1-5, 7-10 and 19 added Group 9 applicability.

9. Figures 2, revised Flag Note 3, contact part number should be BACC47CP3S for connector D40106J.

10. Figures 6 and 7, added information note for ground block if existing ground block is full.

11. Added new Figure 19, to show wire W3846-595-20 connected to GDX2-DC. Added information note for ground block if existing ground block is full.

The data given in Information Notice 767-28-2262 IN 04 is included in this revision. The information Notice IN 03 was corrected in IN 04 D. Description Group 1-9: In the E-8 rack, two new relays are installed and wiring changes are made. New wiring is installed between the E-8 rack and the P414 and P415 panels. Wiring changes are made in the P414 and P415 panels. Wiring changes are made to the E2-6 shelf and E2-6 shelf wire integration unit.

Wiring changes are made at the Modularized Avionics and Warning Electronics Assembly (MAWEA) card file. A functional test is done.

Revision 2 - No more work is necessary on airplanes changed as shown in the original issue or Revision 1 of this service bulletin.

Revision 1 - No more work is necessary on airplanes changed as shown in the original issue of this service bulletin.

E. Compliance Federal Aviation Administration (FAA) Airworthiness Directive 2007-13-04 is related to this service bulletin.

Original Issue: March 15, 2007 Revision 2: August 13, 2009 747-28A2262 BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 22 of 91 BOEING SERVICE BULLETIN 747-28A2262

Boeing recommends operators incorporate this service bulletin within 36 months after the original issue date of this service bulletin. In addition, operators should change their scheduled maintenance program to include periodic functional checks of the Horizontal Stabilizer Fuel Boost Pump Automatic Shutoff System as given in 747-400 Maintenance Planning Data (MPD) document, Section 9, Airworthiness Limitation (AWL) Number 28-AWL-24.

F. Approval This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified in this service bulletin comply with the applicable regulations and are FAA approved, as well as European Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/ JAA approved airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on the airplane in its original Boeing delivery configuration or as modified by other approved Boeing changes.

If an airplane has a non-Boeing modification or repair that affects a component or system also affected by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval before incorporating this service bulletin.

This service bulletin has been approved by the FAA. In addition, the Manager of the FAA Seattle Aircraft Certification Office approves the installation of the horizonal stabilizer tank automatic shutoff system, as described in this service bulletin, as an alternative method of compliance to the requirements of paragraph (h), (l) and (m), fueling and use of the Horizontal Stabilizer Tank (HST) of AD 2007-13-04. All provisions of AD 2007-13-04 that are not specifically referenced in the above statement remain fully applicable and must be complied with. Compliance with the conditions of this AMOC approval requires concurrent incorporation of the associated revisions to the Airplane Flight Manual Section 1 and incorporation of the related Airworthiness Limitations (AWL) in Section 9 of the MPD into the operator’s maintenance documentation.

G. Manpower The table below shows an estimate of the task-hours necessary to do this modification for each airplane. This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator task-hour data if necessary. The estimate does not include lost time. These are some examples of lost time:

— Time to adjust to the workplace — Time to schedule the work — Time to examine the work — Time to cure the materials — Time to make the parts — Time to find the tools.

Group 1-9:

Task Number of Persons Task-Hours Elapsed Hours Open Access 4 30 7.5 Change 4 44 11 Close Access 4 40 10 Test 2 3 1.5 TOTAL FOR EACH AIRPLANE 117 30

Original Issue: March 15, 2007 Revision 2: August 13, 2009 747-28A2262 BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 23 of 91 BOEING SERVICE BULLETIN 747-28A2262

This estimate does not include the task-hour data given in the service bulletins in Paragraph 1.B., Concurrent Requirements.

H. Weight and Balance Changes I. Electrical Load Data Not changed.

J. References

1. Existing Data:

a. Engineering Change Memo PRR 85539-4

b. 747-400 Aircraft Maintenance Manual (AMM) 12-11-01, 20-41-02, 20-41-03, 24-22-00, 45-10-00

c. 747-400 Structural Repair Manual (SRM) 51-40-02

d. 747-400 Maintenance Planning Data (MPD) Section 9

e. 747-400 Wiring Diagrams 28-21-26, 28-21-27, 28-21-28, 28-21-29, 28-21-30, 28-21-31, 28-42-15, 30-41-21, 30-41-31

f. Boeing Service Bulletin 747-31-2376

g. Boeing Service Bulletin 747-31-2377

h. Boeing Service Bulletin 747-31-2378

i. Federal Aviation Administration (FAA) Airworthiness Directive 2007-13-04

j. Standard Overhaul Practices Manual (SOPM) 20-50-05

k. Standard Wiring Practices Manual (SWPM) 20-10-11, 20-10-12, 20-10-19, 20-20-00, 20-20-11, 20-30-11, 20-30-12, 20-30-16, 20-60-00, 20-61-11, 20-71-14, 20-72-17, 20-72-18, 20-81-12, 20-81-19

2. Data supplied with this Service Bulletin:

None.

Group 1-9:

Airplane Change in Weight (Pounds) Change in Moment (Pound-Inches) Groups 1-9 +2.4 +2304.0

Original Issue: March 15, 2007 Revision 2: August 13, 2009 747-28A2262 BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 24 of 91 BOEING SERVICE BULLETIN 747-28A2262

3. Installation Drawings Used in the Preparation of this Service Bulletin:

These drawings were used to prepare this service bulletin. These drawings are not necessary to make the specified changes, and are not supplied with this service bulletin. These drawings may not be applicable to all airplane configurations or operators.

K. Publications Affected

1. Publications Drawing Number Title 288U4147 Wire Bundle Installation, Lower Sidewall LH, STA 403 Thru STA 523 288U4148 Wire Bundle Installation, Lower Sidewall RH, STA 403 Thru STA 523 288U4150 Wire Bundle Installation, Main Deck Floor Beams RH, STA 403 Thru 523 and Aft 400 Bulkhead RH 288U4151 Wire Bundle Installation, Main Deck Floor Beams LH, STA 403 Thru 523 and Aft 400 Bulkhead LH 288U4156 Wire Bundle Installation, Main Deck Floor Beams, STA 403 Thru 523, LBL 50 to RBL 50 288U4210 Wire Bundle Installation, Main Deck Floor Beams RH, STA 523 Thru 723 288U4211 Wire Bundle Installation, Main Deck Floor Beams LH, STA 523 Thru 723 288U4230 Wire Bundle Installation, Main Deck Floor Beams RH, STA 723 Thru 997 288U4231 Wire Bundle Installation, Main Deck Floor Beams LH, STA 723 Thru 997 288U4410 Wire Bundle Installation, Pressure Deck and Main Deck FLR Beams RH, STA 997 Thru 1243 288U4411 Wire Bundle Installation, Pressure Deck and Main Deck FLR Beams LH, STA 997 Thru 1243 288U4430 Wire Bundle Installation, Pressure Deck and Main Deck FLR Beams RH, STA 1243 Thru 1483 288U4431 Wire Bundle Installation, Pressure Deck and Main Deck FLR Beams LH, STA 1243 Thru 1483 288U4610 Wire Bundle Installation, Passenger Floor Beams, 46 SEC (FWD) R.H. STA 1500 - 1720 288U4611 Wire Bundle Installation, Main Deck Floor Beams LH, STA 1483 Thru 1723 Publication Chapter-Section 747 FAA Approved Airplane Flight Manual Section 1 747-400 Operations Manual 12.20, 12.30, NNC.12, NP .20 747-400 Maintenance Manual 28-17, 28-22

Pages 25–36 of 91