TextPartly OCR
Some pages are OCR from a scan. OCR can misread letters and numbers.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '5f45669c09d2afd8c3b03cedac261fedbc9611f8ef2972ef20448774a7835e0a' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '5f45669c09d2afd8c3b03cedac261fedbc9611f8ef2972ef20448774a7835e0a' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
3. ACCOMPLISHMENT INSTRUCTIONS A. GENERAL INFORMATION CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches – Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus or minus 0.03 inch – Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch – Angular tolerance is plus or minus 2 degrees – Hole dimensions for standard solid rivets and fasteners are in Structural Repair Manual (SRM) Chapter 51 – Torque limits to tighten nuts and bolts are in SRM Chapter 51
4. Use the approved fastener and process material substitutions in accordance with SRM Chapter 51.
5. If the length of any fastener specified in this service bulletin does not meet installation standards given in SRM Chapter 51, then a fastener of the same specification, or an approved substitute, with a length which meets the installation standards given in SRM Chapter 51 may be used. In addition, washers may be installed for fastener grip length in accordance with SRM Chapter 51.
6. A Detailed Inspection is defined as: An intensive examination of a specific item, installation, or assembly to detect damage, failure, or irregularity. Available lighting is normally supplemented with a direct source of good lighting at an intensity deemed appropriate. Inspection aids such as mirrors, magnifying lenses, etc. may be necessary. Surface cleaning and elaborate procedures may be required.
7. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative procedure, the accepted alternative procedure can be used. When the words "in accordance with" are included in the instruction, the procedure in the Boeing document must be used.
8. Refer to Appendix A to identify the parts to be replaced and the material used to make replacement parts. The appendix lists the drawing numbers for fabrication, installation, and fastener requirements.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 22, 2012 747-53A2852 121 of 189 BOEING SERVICE BULLETIN 747-53A2852
ALERTALERT
9. Fasteners may be oversized 1/64 or 1/32 inch as needed. Maintain 1.7D edge margin on the upper chord and all adjacent parts. At fasteners common to the floor beam to frame connection, 1.5D minimum edge margin is acceptable in Section 41 with a reduced after-modification inspection threshold as given in Paragraph 1.E., Compliance. Edge margin is defined as the distance from the edge of the part to the center of the hole, and "D" is the hole diameter.
10. The instructions in Paragraph 3.B., Work Instructions and the figures can include operation of tools or test equipment. Boeing Engineering Tool Drawings, the Illustrated Tool and Equipment Manual, and the Special Tool and Ground Handling Drawing Index contain data on versions of the tools or test equipment that you can use. It is permitted to use replaced tools. It is not permitted to use superseded tools.
11. If it is necessary to remove more parts for access, you can remove those parts. If you can get access without removing identified parts, it is not necessary to remove all of the identified parts. Jacking and shoring limitations must be observed.
12. Where the work instructions include installation of a kept part, a new or serviceable part with the same part number can be installed as an alternative to the kept part.
13. Boeing Service Letter 747-SL-51-048, Damage Reporting and Repair Plan/Design Guidelines, is an acceptable procedure to request information from Boeing for additional structural repair instructions. The Service Letter describes what information must be provided to Boeing before a structural repair can be provided.
14. Shaded areas in Figures are reference only. Shaded areas in Figures may look different than your airplane.
15. Install all bolts in transition fit holes. Transition fit hole sizes are given in 747 SRM, Chapter 51.
16. Boeing recommends installation of oversize fasteners at all bolt locations. At rivet locations, install the original size rivet provided the hole meets the acceptable surface defect criteria for fastener holes given in SRM, Chapter 51.
17. Refer to Appendix B for a Fastener Replacement Guide.
18. Upper chord replacement is only required at "full length" upper deck floor beams aft of station (STA) 360 that span the entire width of the airplane from the left side of body frame to the right side of body frame.
B. WORK INSTRUCTIONS PART 1 - Access
1. For access to the upper deck floor beams from above, remove the equipment that follows, as necessary:
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 22, 2012 747-53A2852 122 of 189 BOEING SERVICE BULLETIN 747-53A2852
ALERTALERT
Group 1, 3, 5:
Refer to AMM Subject as an accepted procedureEquipment 747-100/200/300 AMM 25-16-01Flight Compartment Floor Covering 747-100/200/300 AMM 25-24-16Upper Deck Closets 747-100/200/300 AMM 25-24-18 747-100/200/300 AMM 25-24-25 747-100/200/300 AMM 25-24-47 747-100/200/300 AMM 25-25-01Upper Deck Passenger Seat 747-100/200/300 AMM 25-27-05Upper Deck Floor Covering 747-100/200/300 AMM 25-31-05Upper Deck Galleys 747-100/200/300 AMM 25-31-06 747-100/200/300 AMM 25-40-03Upper Deck Lavatories 747-100/200/300 AMM 53-21-02Upper Deck Floor Panels -Crew Rest Area Group 2, 4, 6:
Refer to AMM Subject as an accepted procedureEquipment 747-100/200/300 AMM 25-16-01Flight Compartment Floor Covering 747-100/200/300 AMM 25-25-01Upper Deck Passenger Seat 747-100/200/300 AMM 25-27-05Upper Deck Floor Covering 747-100/200/300 AMM 25-24-02Closets 747-100/200/300 AMM 25-24-16 747-100/200/300 AMM 25-24-18 747-100/200/300 AMM 25-24-25 747-100/200/300 AMM 25-24-33 747-100/200/300 AMM 25-24-47 747-100/200/300 AMM 25-33-12Crew Galley - Upper Deck 747-100/200/300 AMM 25-40-03Lavatory 747-100/200/300 AMM 53-21-02Upper Deck Floor Panels -Crew Rest Area
2. For access to the upper deck floor beams from below, remove the equipment that follows, as necessary:
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 22, 2012 747-53A2852 123 of 189 BOEING SERVICE BULLETIN 747-53A2852
ALERTALERT
Group 1, 3, 5:
Refer to AMM Subject as an accepted procedureEquipment 747-100/200/300 AMM 25-21-04Ceiling Insulation 747-100/200/300 AMM 25-22-01Ceiling Access Panels 747-100/200/300 AMM 25-23-01Passenger Service Units 747-100/200/300 AMM 25-25-01Passenger Seats 747-100/200/300 AMM 25-28-07Center Overhead Stowage Compartments 747-100/200/300 AMM 25-28-10Side Overhead Stowage Compartments Group 2, 4, 6:
Refer to AMM Subject as an accepted procedureEquipment 747-100/200/300 AMM 25-59-01Main Deck Cargo Compartment Ceiling Lining 747-100/200/300 AMM 25-59-05Main Deck Ceiling Insulation PART 2 - Upper Deck Floor Beam Upper Chord Removal and Structure Inspection CAUTION: DO NOT REMOVE ADJACENT FLOOR BEAM UPPER CHORDS AT THE SAME TIME.
IF ADJACENT FLOOR BEAM UPPER CHORDS ARE REMOVED AT THE SAME TIME, DAMAGE TO THE AIRPLANE STRUCTURE MAY OCCUR.
1. Remove the existing upper chords and reinforcing straps or angles from the upper deck floor beams at the locations where replacement is required as shown in the applicable figure as follows:
FIGURE 1Group 1-2 FIGURE 2Group 3-4 FIGURE 3Group 5 FIGURE 4Group 6
2. Do the following inspections:
a. Do an open hole High Frequency Eddy Current (HFEC) inspection for cracks at all locations in the floor beam webs and side of body frames where fasteners were removed to remove the upper chords and reinforcing straps. Do this inspection for cracks in accordance with 747 NDT Part 6, 51-00-00, Figure 16.
b. Do a detailed inspection for cracks in any parts that were removed and will be re-installed.
c. If any crack is found, replace the cracked part or contact Boeing for repair instructions and do the repair. Refer to Part 3 - Upper Deck Floor Beam Upper Chord Fabrication and Installation for the replacement of cracked parts.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 22, 2012 747-53A2852 124 of 189 BOEING SERVICE BULLETIN 747-53A2852
ALERTALERT
PART 3 - Upper Deck Floor Beam Upper Chord Fabrication and Installation
1. For each floor beam location where replacement is required as shown in the applicable FIGURE 1 or FIGURE 2 or FIGURE 3 or FIGURE 4, make a new upper chord and associated straps or angles.
a. Fabricate a new upper chord and straps or angles. Refer to APPENDIX A for the applicable parts and fabrication requirements. Use the existing parts as a guide and to match the profile of the existing chord to frame attachment.
b. Apply one coat of Type 2, Class A chemical conversion coating to bare aluminum surfaces.
Refer to SOPM 20-43-03.
c. Apply two coats of BMS 10-11, Type 1 primer to the new parts. Refer to SOPM 20-41-02.
2. For each floor beam location where replacement is required as shown in the applicable FIGURE 1 or FIGURE 2 or FIGURE 3 or FIGURE 4, install a new upper chord, new associated reinforcing straps or angles, and any kept or replaced parts in accordance with the applicable production drawings (Refer to APPENDIX A). In Section 41, also refer to Service Bulletin 747-53-2272 as necessary.
NOTE: Fastener holes may be oversized up to 1/32 inch to correct damage or misalignment. If more than 1/32 inch oversize is necessary, contact Boeing. At rivet locations where the hole was already oversized during accomplishment of Service Bulletin 747-53-2272, do not further oversize the hole, and install the same diameter rivet as was called out for SB 747-53-2272. At bolt locations where the hole was already oversized during accomplishment of Service Bulletin 747-53-2272, make the hole an additional 1/64 inch oversize and install oversize fastener. If further oversizing is necessary to meet hole quality requirements, contact Boeing for instructions.
NOTE: Make sure a minimum edge margin of 1.7D is maintained in both floor beam and body frame. At fasteners common to the floor beam to frame connection, 1.5D minimum edge margin is acceptable in Section 41 with a reduced after-modification inspection threshold as given in Paragraph 1.E., Compliance.
NOTE: Install bolts common to the upper chord wet using BMS 5-95 sealant. Refer to SOPM 20-50-19.
3. After upper chord replacement is complete, reapply BMS 3-23, Type II, Class 2 Corrosion Inhibiting Compound (CIC) to the new upper chord structure and fasteners.
PART 4 - After Replacement Inspections
1. At the time given in Paragraph 1.E., Compliance, of this service bulletin, do inspections as follows:
a. Do open hole HFEC inspection at the floor panel attachment holes and surface HFEC inspection at the permanent fastener locations for cracks in the replaced upper deck floor beam chords, in accordance with Service Bulletin 747-53A2452.
b. Do HFEC inspections of the upper deck floor beam upper chords at strap/frame connections in accordance with Structural Significant Items (SSI) F-19D, F-19H, F-20B, and F-20G of Supplemental Structural Inspection Document (SSID) D6-35022, Revision G, dated December 2000. Inspections are only required at locations identified in the SSID.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 22, 2012 747-53A2852 125 of 189 BOEING SERVICE BULLETIN 747-53A2852
ALERTALERT
2. If any crack is found, contact Boeing for repair instructions and do the repair.
3. If no crack is found, do repeat inspections as follows:
a. Repeat open hole HFEC inspection at floor panel attachment holes and surface HFEC inspection at permanent fastener locations in accordance with Service Bulletin 747-53A2452, at the interval given in Paragraph 1.E., Compliance.
b. Repeat HFEC inspections of the upper deck floor beam upper chords at strap/frame connections in accordance with Structural Significant Items (SSI) F-19D, F-19H, F-20B, and F-20G of Supplemental Structural Inspection Document (SSID) D6-35022, Revision G, dated December 2000, at the interval given in Paragraph 1.E., Compliance. Inspections are only required at locations identified in the SSID.
4. Do the chord removal, open hole HFEC inspections, detailed inspections, chord fabrication, and new chord installation actions again, in accordance with PART 2 and PART 3, at the time given in Paragraph 1.E., Compliance.
PART 5 - Restoration
1. For restoration above the upper deck floor beams, install removed equipment. Refer to the following procedures, as necessary:
Group 1, 3, 5:
Refer to AMM Subject as an accepted procedureEquipment 747-100/200/300 AMM 25-16-01Flight Compartment Floor Covering 747-100/200/300 AMM 25-24-16Upper Deck Closets 747-100/200/300 AMM 25-24-18 747-100/200/300 AMM 25-24-25 747-100/200/300 AMM 25-24-47 747-100/200/300 AMM 25-25-01Upper Deck Passenger Seat 747-100/200/300 AMM 25-27-05Upper Deck Floor Covering 747-100/200/300 AMM 25-31-05Upper Deck Galleys 747-100/200/300 AMM 25-31-06 747-100/200/300 AMM 25-40-03Upper Deck Lavatories 747-100/200/300 AMM 53-21-02Upper Deck Floor Panels -Crew Rest Area Group 2, 4, 6:
Refer to AMM Subject as an accepted procedureEquipment 747-100/200/300 AMM 25-16-01Flight Compartment Floor Covering 747-100/200/300 AMM 25-25-01Upper Deck Passenger Seat Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 22, 2012 747-53A2852 126 of 189 BOEING SERVICE BULLETIN 747-53A2852
ALERTALERT
Group 2, 4, 6:
Refer to AMM Subject as an accepted procedureEquipment 747-100/200/300 AMM 25-27-05Upper Deck Floor Covering 747-100/200/300 AMM 25-24-02Closets 747-100/200/300 AMM 25-24-16 747-100/200/300 AMM 25-24-18 747-100/200/300 AMM 25-24-25 747-100/200/300 AMM 25-24-33 747-100/200/300 AMM 25-24-47 747-100/200/300 AMM 25-33-12Crew Galley - Upper Deck 747-100/200/300 AMM 25-40-03Lavatory 747-100/200/300 AMM 53-21-02Upper Deck Floor Panels -Crew Rest Area
2. For restoration below the upper deck floor beams, install removed equipment. Refer to the following procedures, as necessary:
Group 1, 3, 5:
Refer to AMM Subject as an accepted procedureEquipment 747-100/200/300 AMM 25-21-04Ceiling Insulation 747-100/200/300 AMM 25-22-01Ceiling Access Panels 747-100/200/300 AMM 25-23-01Passenger Service Units 747-100/200/300 AMM 25-25-01Passenger Seats 747-100/200/300 AMM 25-28-07Center Overhead Stowage Compartments 747-100/200/300 AMM 25-28-10Side Overhead Stowage Compartments Group 2, 4, 6:
Refer to AMM Subject as an accepted procedureEquipment 747-100/200/300 AMM 25-59-01Main Deck Cargo Compartment Ceiling Lining 747-100/200/300 AMM 25-59-05Main Deck Ceiling Insulation Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 22, 2012 747-53A2852 127 of 189 BOEING SERVICE BULLETIN 747-53A2852
ALERTALERT
This Figure applies only to: Group 1-2.
FIGURE 1: UPPER DECK FLOOR BEAM - UPPER CHORD - REPLACEMENT LOCATIONS (SHEET 1 OF 3) Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 22, 2012 747-53A2852 128 of 189 BOEING SERVICE BULLETIN 747-53A2852
ALERTALERT
BOEING SERVICE BULLETIN 747-53A2852
ALERT ALERT
STA STA STA STA STA STA 460 480 500 520 540 560
STA STA STA 400 330 STA 380 STA 360 340
UPPER CHORD
REPLACEMENT LOCATION FWD 2155407 FIGURE 1: UPPER DECK FLOOR BEAM - UPPER CHORD - REPLACEMENT LOCATIONS (SHEET 2 OF 3) Original Issue: June 22, 2012 PROPRIETARY - Copyright © Unpublished Export Controlled ECCN: 9E991 - BOEING 747-53A2852 Work - See page 1 for details. 129 of 189
BOEING SERVICE BULLETIN 747-53A2852
ALERT ALERT
STA STA STA STA STA STA STA STA STA SIA 580 600 620 640 660 680 700 720 740 FWD
NOT INSTALLED ON ALL
AIRPLANES UPPER CHORD 2155421
REPLACEMENT LOCATION FIGURE 1: UPPER DECK FLOOR BEAM - UPPER CHORD - REPLACEMENT LOCATIONS (SHEET 3 OF 3) Original Issue: June 22, 2012 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished 747-53A2852 Work - See page 1 for details. 130 of 189
This Figure applies only to: Group 3-4.
FIGURE 2: UPPER DECK FLOOR BEAM - UPPER CHORD - REPLACEMENT LOCATIONS (SHEET 1 OF 3) Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 22, 2012 747-53A2852 131 of 189 BOEING SERVICE BULLETIN 747-53A2852
ALERTALERT
BOEING SERVICE BULLETIN 747-53A2852
ALERT ALERT
STA STA STA STA STA STA 440 STA 460 STA 480 500 520 540 560 STA 420 STA 400 STA 380 STA 360 340
UPPER CHORD
REPLACEMENT LOCATION FWD 2155435 FIGURE 2: UPPER DECK FLOOR BEAM - UPPER CHORD - REPLACEMENT LOCATIONS (SHEET 2 OF 3) Original Issue: June 22, 2012 Export Controlled ECCN: 9E991 - BOEING 747-53A2852 PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 132 of 189