TextPartly OCR
Some pages are OCR from a scan. OCR can misread letters and numbers.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '1f0cd8aee6e2a5bba22b89726972f9575ba3b698d482164d7c770238de91aea6' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '1f0cd8aee6e2a5bba22b89726972f9575ba3b698d482164d7c770238de91aea6' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
Group 2-3, 5-6:
Table 2 - Detailed Inspection Repeat Interval (Not to Exceed) Compliance time (Whichever is later)ActionCondition -Within 3,000 flight cycles after the original issue date of this service bulletin.
Before 25,000 total flight cycles.
Do PART 2: NOSE
WHEEL WELL
BODY STRUC-
TURE DETAILED INSPECTION for any crack.
All airplanes -Before further flight.CONDITION 1 (ACTION 1): Do PART 4: SEC-
ONDARY INSPEC-
TION AND RE- PAIR.
CONDITION 1:
ANY CRACK FOUND during PART 2.
3,000 flight cycles.-CONDITION 1 (ACTION 2): Repeat PART 2:
NOSE WHEEL
WELL BODY
STRUCTURE DE-
TAILED INSPEC- TION for any crack at unrepaired areas only.
3,000 flight cycles.-Repeat PART 2:
NOSE WHEEL
WELL BODY
STRUCTURE DE-
TAILED INSPEC- TION for any crack at unrepaired areas only.
CONDITION 2: NO
CRACK FOUND during PART 2.
F. Approval This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified in this service bulletin comply with the applicable regulations and are FAA approved, as well as European Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on the airplane in its original Boeing delivery configuration or as modified by other approved Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval before incorporating this service bulletin.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 02, 2015 747-53A2887 25 of 85 BOEING SERVICE BULLETIN 747-53A2887
ALERTALERT
G. Manpower The following breakdown of manpower requirements is suggested as a guide to assist operators in planning and accomplishing this modification. This estimate is for direct labor performed by an experienced crew. It does not include setup, planning, familiarization, cure time, part fabrication, tool acquisition, or lost time. Factor this estimate as necessary based on your own experience.
The manpower estimates are given for the following options:
• Inspection for each area
• Modification for each area
• Inspection for each inspection interval
• Modification for each airplane group Group 1, 4:
Elapsed HoursTask HoursNumber of PersonsTask
4.008.002Open Access
70.00140.002Detailed Inspection
1.553.102Surface HFEC Inspection
1.553.102Open Hole HFEC Inspection
4.008.002Close Access
81.10162.20TOTAL FOR EACH AIRPLANE Group 2-3, 5-6:
Elapsed HoursTask HoursNumber of PersonsTask
4.008.002Open Access
70.00140.002Detailed Inspection
4.008.002Close Access
78.00156.00TOTAL FOR EACH AIRPLANE H. Weight and Balance Changes None.
I. Electrical Load Data Not affected.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 02, 2015 747-53A2887 26 of 85 BOEING SERVICE BULLETIN 747-53A2887
ALERTALERT
J. References
1. Existing Data:
a. Boeing Service Bulletin 747-53A2265, 747-53A2272, 747-53A2293, 747-53A2338, 747-53A2349, 747-53A2465, 747-53A2500, 747-53A2562, 747-53A2732, 747-53A2753, 747-53A2808
b. Boeing Service Letter 747-SL-51-048
c. Boeing Service Related Problem (SRP) 747-SRP-53-0479
d. Federal Aviation Administration (FAA) Airworthiness Directive (AD) 2001-14-18, 90-06-14 R1
e. Service Bulletin Index D6-30300
f. Standard Overhaul Practices Manual (SOPM) 20-50-01, 20-50-19
g. 747 Non-Destructive Testing (NDT) Manual Part 6, Section 51-00-00, Part 6, Section 53-30-19
h. 747-100/200/300 Aircraft Maintenance Manual (AMM) 25-00-00
i. 747-100/200/300 Structural Repair Manual (SRM) 51-30-02
j. 747-400 Aircraft Maintenance Manual (AMM) 25-00-00
k. 747-SP Structural Repair Manual (SRM) 51-30-02
2. Data Supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
TitleDrawing Number Frame Installation - Body Station 30065B01708 Frame Installation - Body Station 32065B01709 Side Panel Installation65B07942 The table above lists applicable drawings used to prepare this service bulletin. These drawings are not necessary to make the specified changes, and are not supplied with this service bulletin.
The drawings may not be applicable to all airplane configurations or operators.
K. Publications Affected
1. Publications:
None.
2. Damage Tolerance Based Structural Inspections:
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 02, 2015 747-53A2887 27 of 85 BOEING SERVICE BULLETIN 747-53A2887
ALERTALERT
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the Maintenance Program. This service bulletin affects FCS but no new DTIs are necessary.
L. Interchangeability and Intermixability of Parts None.
M. Software Accomplishment Summary Not affected.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 02, 2015 747-53A2887 28 of 85 BOEING SERVICE BULLETIN 747-53A2887
ALERTALERT
2. MATERIAL INFORMATION A. Material - Price and Availability None.
B. Industry Support Information Boeing warranty remedies are not available for the inspection and/or repair procedures given in this service bulletin.
C. Parts Necessary for Each Airplane
1. Kits/Parts None.
2. Parts and Materials Supplied by the Operator The following parts or materials are necessary to do the change in this service bulletin. Parts and materials in the manuals given in Paragraph 1.J., References, can also be necessary. Examine operator part and material supply to make sure all necessary parts and materials are available.
Group 1:
NotesNameQTYPart Number / Specification Or BACR15BB10AD.Rivet12BACR15ET9D Or BACR15ET9D.Rivet12BACR15BB10AD Group 4:
NotesNameQTYPart Number / Specification Or BACB30MY6K6Y.Bolt12BACB30MY6K6X Or BACB30MY6K6X.Bolt12BACB30MY6K6Y To be installed with bolt BACB30MY6K6X.
Collar12BACC30M6 To be installed with bolt BACB30MY6K6Y.
Collar12BACC30AC6
3. Parts Modified and Reidentified None.
4. Parts Removed and Not Replaced None.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 02, 2015 747-53A2887 29 of 85 BOEING SERVICE BULLETIN 747-53A2887
ALERTALERT
D. Parts Necessary to Change Spares None.
E. Special Tooling - Price and Availability None.
F. Special Tooling Necessary to do this Service Bulletin No special tools or equipment are necessary to do the change in this service bulletin. But maintenance and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine operator tool supply to make sure all necessary tools are available.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 02, 2015 747-53A2887 30 of 85 BOEING SERVICE BULLETIN 747-53A2887
ALERTALERT
3. ACCOMPLISHMENT INSTRUCTIONS A. GENERAL INFORMATION CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches – Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus or minus 0.03 inch – Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch – Angular tolerance is plus or minus 2 degrees – Hole dimensions for standard solid rivets and fasteners are in Structural Repair Manual (SRM) Chapter 51 – Torque Values:
— Values for structural fasteners are given in 747 Structural Repair Manual, Chapter 51.
— Values for airframe maintenance tasks are included in Chapter 20 of 747 Aircraft Maintenance Manual (AMM).
— Values for electrical maintenance tasks are included in Chapter 20 of Standard Wiring Practices Manual (SWPM).
— Values for engine maintenance tasks are included in Chapter 70 of 747 Aircraft Maintenance Manual (AMM).
— Non-standard torque values for maintenance tasks are included in the applicable installation step.
4. Use the approved fastener, process and material substitutions in accordance with SRM Chapter 51.
5. If the length of any fastener specified in this service bulletin does not meet installation standards given in SRM Chapter 51, then a fastener of the same specification, or an approved substitute, with a length which meets the installation standards given in SRM Chapter 51 may be used. In addition, washers may be installed for fastener grip length in accordance with SRM Chapter 51. Refer to SOPM 20-50-01 for alternate full threaded fasteners (screws) needed for installation in this service bulletin.
6. A Detailed Inspection is defined as: An intensive examination of a specific item, installation, or assembly to detect damage, failure, or irregularity. Available lighting is normally supplemented with a direct source of good lighting at an intensity deemed appropriate. Inspection aids such as mirrors, magnifying lenses, etc. may be necessary. Surface cleaning and elaborate procedures may be required.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 02, 2015 747-53A2887 31 of 85 BOEING SERVICE BULLETIN 747-53A2887
ALERTALERT
7. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative procedure, the accepted alternative procedure can be used. When the words "in accordance with" are included in the instruction, the procedure in the Boeing document must be used.
8. Boeing Service Letter 747-SL-51-048, Damage Reporting and Repair Plan/Design Guidelines, is an acceptable procedure to request information from Boeing for additional structural repair instructions. The Service Letter describes what information must be provided to Boeing before a structural repair can be provided.
9. Refer to Appendix A and B for logic diagrams. Logic diagrams are provided as an aid only. Information contained in Paragraph 1.E., Compliance is the primary source for compliance times. Information in Paragraph 3.B., Work Instructions is the primary source for tasks required for compliance.
10. The instructions in Paragraph 3.B., Work Instructions and the figures can include operation of tools or test equipment. Boeing Engineering Tool Drawings, the Illustrated Tool and Equipment Manual, and the Special Tool and Ground Handling Drawing Index contain data on versions of the tools or test equipment that you can use. It is permitted to use replaced tools. It is not permitted to use superseded tools.
11. If it is necessary to remove more parts for access, you can remove those parts. If you can get access without removing identified parts, it is not necessary to remove all of the identified parts. Jacking and shoring limitations must be observed.
12. Where the work instructions include installation of a kept part, a new or serviceable part with the same part number can be installed as an alternative to the kept part.
13. Use of colors in Figures is based on guidance from the ATA e-Business Program (ATA) iSpec 2200.
14. When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When more than one ACTION is given for a CONDITION number or an OPTION number, do all of the ACTION numbers for that CONDITION number or OPTION number.
15. The compliance times for the actions in Paragraph 3.B., WORK INSTRUCTIONS are in Paragraph 1.E., Compliance.
16. Some steps in the Work Instructions are labeled as Required for Compliance (RC).
If this service bulletin is mandated by an Airworthiness Directive (AD), then the steps labeled as RC, including sub-steps under an RC step and any figures identified in an RC step, must be done to comply with the AD. An Alternative Method of Compliance (AMOC) is required for any deviations to RC steps, including sub-steps and identified figures. Steps not labeled as RC may be deviated from using accepted methods in accordance with the operator's maintenance or inspection program without obtaining approval of an AMOC. This is provided that the RC steps, including sub-steps and identified figures, can still be done as specified, and the airplane can be put back in an airworthy condition.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 02, 2015 747-53A2887 32 of 85 BOEING SERVICE BULLETIN 747-53A2887
ALERTALERT
B. WORK INSTRUCTIONS
1. Get access to nose wheel well top and side wall panels. Remove and keep insulation blankets.
Refer to 747-100/200/300 AMM 25-00-00, or 747-400 AMM 25-00-00 as accepted procedures.
2. Group 1, 4:
RC- Do PART 1: MODIFICATION.
3. RC- Do PART 2: NOSE WHEEL WELL BODY STRUCTURE DETAILED INSPECTION for any crack.
a. CONDITION 1: ANY CRACK FOUND during PART 2.
(1) CONDITION 1 (ACTION 1): Do PART 4: SECONDARY INSPECTION AND REPAIR.
(2) CONDITION 1 (ACTION 2): Repeat PART 2: NOSE WHEEL WELL BODY STRUCTURE DETAILED INSPECTION for any crack at unrepaired areas only.
b. CONDITION 2: NO CRACK FOUND during PART 2.
(1) Repeat PART 2: NOSE WHEEL WELL BODY STRUCTURE DETAILED INSPECTION for any crack at unrepaired locations only.
4. Group 1, 4:
RC- Do PART 3: STA 280-320 VERTICAL BEAM OUTER CHORD AND WEB SURFACE OR OPEN HOLE HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTION for any crack.
a. CONDITION 3: SURFACE HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTION DONE. ANY CRACK FOUND during PART 3.
(1) CONDITION 3 (ACTION 1): Do PART 4: SECONDARY INSPECTION AND REPAIR.
(2) CONDITION 3 (ACTION 2): Repeat PART 3: STA 280-320 VERTICAL BEAM OUTER
CHORD AND WEB SURFACE OR OPEN HOLE HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTION for any crack at unrepaired areas only.
b. CONDITION 4: SURFACE HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTION DONE. NO CRACK FOUND during PART 3.
(1) Repeat PART 3: STA 280-320 VERTICAL BEAM OUTER CHORD AND WEB SURFACE OR OPEN HOLE HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTION for any crack at unrepaired areas only.
c. CONDITION 5: OPEN HOLE HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTION DONE. ANY CRACK FOUND during PART 3.
(1) CONDITION 5 (ACTION 1): Do PART 4: SECONDARY INSPECTION AND REPAIR.
(2) CONDITION 5 (ACTION 2): Repeat PART 3: STA 280-320 VERTICAL BEAM OUTER
CHORD AND WEB SURFACE OR OPEN HOLE HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTION for any crack at unrepaired areas only.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 02, 2015 747-53A2887 33 of 85 BOEING SERVICE BULLETIN 747-53A2887
ALERTALERT
d. CONDITION 6: OPEN HOLE HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTION DONE. NO CRACK FOUND during PART 3.
(1) Group 1:
CONDITION 6 (ACTION 1): Install new fasteners in accordance with FIGURE 9 and FIGURE 10.
(2) Group 4:
CONDITION 6 (ACTION 1): Install new fasteners in accordance with FIGURE 11 and FIGURE 12.
(3) CONDITION 6 (ACTION 2): Repeat PART 3: STA 280-320 VERTICAL BEAM OUTER
CHORD AND WEB SURFACE OR OPEN HOLE HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTION for any crack at unrepaired areas only.
5. Install kept insulation blankets. Refer to 747-100/200/300 AMM 25-00-00, or 747-400 AMM 25-00-00 as accepted procedures.
6. Put the airplane back to serviceable condition.
Group 1, 4:
PART 1: MODIFICATION
1. Do the modification in accordance with service bulletin (SB) 747-53A2293 for areas 1, 3 and 4 in accordance with the time given in Paragraph 1.E., Compliance of this Service Bulletin. If the modification work was previously done in accordance with SB 747-53A2293, then there is no further modification work required.
NOTE: In SB 747-53A2293, the Area 4 modification requires the same access as the Area 3 modification.
PART 2: NOSE WHEEL WELL BODY STRUCTURE DETAILED INSPECTION
1. Group 1-2, Configuration 1; Group 3, 5:
Do a detailed inspection of the left side nose wheel well body structure for any crack in accordance with FIGURE 1.
2. Group 1-2, Configuration 1; Group 3, 5:
Do a detailed inspection of the right side nose wheel well body structure for any crack in accordance with FIGURE 2.
3. Group 1-2, Configuration 2; Group 4, 6:
Do a detailed inspection of the left side nose wheel well body structure for any crack in accordance with FIGURE 3.
4. Group 1-2, Configuration 2; Group 4, 6:
Do a detailed inspection of the right side nose wheel well body structure for any crack in accordance with FIGURE 4.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 02, 2015 747-53A2887 34 of 85 BOEING SERVICE BULLETIN 747-53A2887
ALERTALERT
Group 1, 4:
PART 3: STA 280-320 VERTICAL BEAM OUTER CHORD AND WEB SURFACE OR OPEN HOLE
HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTION
1. Do one of the following options:
a. OPTION 1:
(1) ACTION 1: Do a Surface HFEC Inspection of the left side STA 280-320 vertical beam outer chord and web for any crack in accordance with FIGURE 5.
(2) ACTION 2: Do a Surface HFEC Inspection of the right side STA 280-320 vertical beam outer chord and web for any crack in accordance with FIGURE 6.
b. OPTION 2:
(1) ACTION 1: Do an Open Hole HFEC Inspection of the left side STA 280-320 vertical beam outer chord and web for any crack in accordance with FIGURE 7.
(2) ACTION 2: Do an Open Hole HFEC Inspection of the right side STA 280-320 vertical beam outer chord and web for any crack in accordance with FIGURE 8.
PART 4: SECONDARY INSPECTION AND REPAIR
1. Do a detailed inspection for any crack within 20 inches of the original crack, to determine the full extent of the damage.
2. Contact The Boeing Company for repair instructions and do the repair.
Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 02, 2015 747-53A2887 35 of 85 BOEING SERVICE BULLETIN 747-53A2887
ALERTALERT
BOEING SERVICE BULLETIN 747-53A2887
ALERT ALERT This Figure applies only to: Group 1-2, Configuration 1; Group 3, 5.
STA 260 STA 260 / STA CANTED STA 1280 340 /STA 300 STA RBL 22 340 RBL 10 LBL 10 - LBL 22 ~ 2454876 FIGURE 1: LEFT SIDE NOSE WHEEL WELL BODY STRUCTURE - DETAILED INSPECTION (SHEET 1 OF 7) Original Issue: December 02, 2015 Export Controlled ECCN: 9E991 - BOEING 747-53A2887 PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 36 of 85