TextPartly OCR
Some pages are OCR from a scan. OCR can misread letters and numbers.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '47eeb0d361738c35a0441476fb34952afce93d24e964c5e558998e311d7a005b' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '47eeb0d361738c35a0441476fb34952afce93d24e964c5e558998e311d7a005b' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
Commercial Airplanes 757 Requirements Bulletin
SPECIAL ATTENTION Number: 757-25-0321 RB Original Issue: January 19, 2024 ATA System: 2523 SUBJECT: EQUIPMENT/FURNISHINGS - Passenger Compartment - Passenger Service Unit-Mounted Video Monitor Replacement EXPORT CONTROLLED - This technology or software is subject to the U.S. Export Administration Regulations (EAR), (15 C.F.R. Parts 730-774). No authorization from the U.S. Department of Commerce is required for export, re-export, in-country transfer, or access EXCEPT to country group E:1 or E:2 countries/persons per Supp.1 to Part 740 of the EAR.
9E991ECCN:
Copyright © 2024 The Boeing Company Treatment of this document and its content is governed by contract with Boeing. Rights to use this document are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.
Original Issue: January 19, 2024 757-25-0321 RB 1 of 15
3.0
Export Controlled ECCN: 9E991 See page 1 for details Original Issue: January 19, 2024 757-25-0321 RB 2 of 15 REQUIREMENTS BULLETIN 757-25-0321
BLANK PAGE
Table of Contents
1. EFFECTIVITY5
A. Airplanes5
B. Spares Affected6
2. CONCURRENT REQUIREMENTS6
3. COMPLIANCE6
4. APPROVAL7
5. ACCOMPLISHMENT INSTRUCTIONS9
A. General Information9
B. Work Instructions11
FIGURE 1: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT-MOUNTED VIDEO MONITOR
- REPLACEMENT [Group 1]12
FIGURE 2: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT-MOUNTED VIDEO MONITOR
- REPLACEMENT [Group 2]14
Export Controlled ECCN: 9E991 See page 1 for details Original Issue: January 19, 2024 757-25-0321 RB 3 of 15 REQUIREMENTS BULLETIN 757-25-0321
Export Controlled ECCN: 9E991 See page 1 for details Original Issue: January 19, 2024 757-25-0321 RB 4 of 15 REQUIREMENTS BULLETIN 757-25-0321
BLANK PAGE
Commercial Airplanes 757 Requirements Bulletin
SPECIAL ATTENTION Number: 757-25-0321 RB Original Issue: January 19, 2024 ATA System: 2523 SUBJECT: EQUIPMENT/FURNISHINGS - Passenger Compartment - Passenger Service Unit-Mounted Video Monitor Replacement BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS DOCUMENT IMMEDIATELY. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE
THE SERVICE BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS…) OF THE RB WHICH THE SB REFERS TO AS THE RELATED DOCUMENT.
1. Effectivity A. Airplanes This bulletin is applicable to 757-200, 757-300 Airplane(s), line number(s) 772, 775, 780, 783, 787, 792, 797, 801, 811, 824, 829, 832, 835, 857, 859-860, 863, 868, 876, 881, 889, 897, 900, 902, 904-905, 910, 916, 920, 924, 935-936, 938, 940, 943, 948, 956, 961, 966, 990, 993, 995, 997, 999, 1001, 1004, 1006, 1009-1010, 1014-1015, 1019-1030, 1033-1050 in 2 Group(s). Where the effectivity is presented with hyphens between line numbers, the airplane applicability means "through" and "inclusive", e.g. line numbers 1-9 means line numbers 1 through 9 inclusive.
The Variable Numbers and Group Information for the applicable airplanes is given below. This bulletin is not applicable if a passenger airplane has been modified to a freighter configuration by Boeing and re-delivered as a Special Freighter (SF) configuration via Boeing STC ST00916WI-D.
DESCRIPTIONCONFIGURATIONGROUP 757-200 Airplanes equipped with Passenger Service Unit (PSU)-mounted video panels, part numbers, RD-AA902124-01 and RD-AA902125-01.
-1 757-200, 757-300 Airplanes equipped with PSU-mounted video panels, part numbers, RD-AA902124-03 and RD-AA902125-03.
-2 Airplane Models:
757-200, 757-300 Export Controlled ECCN: 9E991 See page 1 for details Original Issue: January 19, 2024 757-25-0321 RB 5 of 15
GroupVariable Number 2NJ001 - NJ004 2NJ031 - NJ032 2NJ551 - NJ555 2NL101 - NL109 2NL141 2NL601 - NL616 GroupVariable Number 2NN001 - NN002 2NN051 - NN052 1NP901 - NP904 1NT341 - NT345 2NT346 - NT347 1NT381 - NT383 GroupVariable Number 2NT384 - NT386 1NT861 - NT862 1NT881 - NT885 1NT901 - NT914 2NT915 - NT916 -- B. Spares Affected Examine your spares supply for the parts or components identified below. If any parts or components are found, refer to Paragraph 2.C.3., Parts Modified and Reidentified in SB 757-25-0321 for the recommended action.
Group 1:
Part Number RD-AA902124-01 RD-AA902125-01 Group 2:
Part Number RD-AA902124-03 RD-AA902125-03
2. CONCURRENT REQUIREMENTS None.
3. COMPLIANCE The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to Requirements Bulletin 757-25-0321 RB. The Airworthiness Directive will make the compliance tasks and times given in Requirements Bulletin 757-25-0321 RB mandatory.
Accomplish the required action(s), based on the applicable condition(s) in Table 1 in accordance with Accomplishment Instructions.
Export Controlled ECCN: 9E991 See page 1 for details Original Issue: January 19, 2024 757-25-0321 RB 6 of 15 REQUIREMENTS BULLETIN 757-25-0321
TABLE 1: PASSENGER SERVICE UNIT-MOUNTED VIDEO MONITOR REPLACEMENT Repeat Interval (Not to Exceed) Compliance TimeActionCondition -Within 60 months after the Original Issue date of Requirements Bulletin 757-25-0321 RB.
At all Passenger Service Unit (PSU) locations, replace any PSU-mounted video monitor without secondary retention lanyards with PSU-mounted video monitor with secondary retention lanyards. Make sure each inboard lanyard is attached to the inboard PSU rail.
All airplanes.
4. APPROVAL This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes specified in this document comply with the applicable regulations and are FAA approved, as well as European Union Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved airplanes listed in this Requirements Bulletin effectivity. This document and its approval were based on the airplane in its original Boeing delivery configuration or as modified by other Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval before incorporating this Requirements Bulletin.
Export Controlled ECCN: 9E991 See page 1 for details Original Issue: January 19, 2024 757-25-0321 RB 7 of 15 REQUIREMENTS BULLETIN 757-25-0321
Export Controlled ECCN: 9E991 See page 1 for details Original Issue: January 19, 2024 757-25-0321 RB 8 of 15 REQUIREMENTS BULLETIN 757-25-0321
BLANK PAGE
5. ACCOMPLISHMENT INSTRUCTIONS A. GENERAL INFORMATION
KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED
MATERIAL, METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR OTHER ELECTRICAL DAMAGE.
CAUTION NOTE: 1. This is an Enhanced Required for Compliance document. There will be a separate Service Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated by an Airworthiness Directive (AD), then all applicable requirements specified in the RB must be done. In the RB, the "Refer to the listed procedures..." column of the table(s) in the Work Instructions is for reference only. The procedures in that column are not required by the AD and are for guidance only. For the related SB, some locations are marked RC Start and RC End to identify the requirements that are restated from the RB. For the related SB, the areas between RC Start and RC End, including sub-steps and any figures identified between RC Start and RC End, must be done to comply with the AD. Therefore, an Alternative Method of Compliance (AMOC) is required for any deviations to steps between RC Start and RC End, including substeps and identified figures. For the related SB, the steps not between RC Start and RC End may be deviated from using accepted methods in accordance with the operator's maintenance or inspection program without obtaining approval of an AMOC; this is provided that the steps between RC Start and RC End, including sub-steps and identified figures, can still be done as specified, and the airplane can be put back in an airworthy condition. Figures not required for compliance are omitted from the RB.
2. This is an Enhanced Required for Compliance document. The Boeing processes used to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure that the information between "RC Start" and "RC End" in the SB are identical to the information in the same sections (Compliance, Work Instructions...) of the RB which the SB refers to as the related document.
3. The compliance times for the actions in WORK INSTRUCTIONS are in Compliance.
4. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches – Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus or minus 0.03 inch – Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch – Angular tolerance is plus or minus 2 degrees – Hole dimensions for standard solid rivets and fasteners are in Structural Repair Manual (SRM) Chapter 51 – Torque Values:
— Values for airframe maintenance tasks are included in Chapter 20 of 757-200/-300 Aircraft Maintenance Manual (AMM).
— Values for electrical maintenance tasks are included in Chapter 20 of Standard Wiring Practices Manual (SWPM).
Export Controlled ECCN: 9E991 See page 1 for details Original Issue: January 19, 2024 757-25-0321 RB 9 of 15 REQUIREMENTS BULLETIN 757-25-0321
5. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative procedure, the accepted alternative procedure can be used. When the words "in accordance with" are included in the instruction, the procedure in the Boeing document must be used.
6. If it is necessary to remove more parts for access, you can remove those parts. If you can get access without removing identified parts, it is not necessary to remove all of the identified parts. Jacking and shoring limitations must be observed.
7. Use of colors in Figures is based on guidance from the ATA e-Business Program (ATA) iSpec 2200.
Export Controlled ECCN: 9E991 See page 1 for details Original Issue: January 19, 2024 757-25-0321 RB 10 of 15 REQUIREMENTS BULLETIN 757-25-0321
B. WORK INSTRUCTIONS Actions Required for Compliance
1. Requirements Group 1:
TABLE 1: PASSENGER SERVICE UNIT-MOUNTED VIDEO MONITOR REPLACEMENT Refer to the listed procedures in SB 757-25-0321 Original Issue or later approved revisions as an accepted procedure Method of ComplianceActionCondition -FIGURE 1At all Passenger Service- Unit (PSU) locations, replace any PSU-mounted video monitor without secondary retention lanyards with PSU-mounted video monitor with secondary retention lanyards. Make sure each inboard lanyard is attached to the inboard PSU rail.
All Airplanes.
PART 1: PASSENGER
SERVICE UNIT-MOUNT-
ED VIDEO MONITOR -
INSTALLATION TEST - Group 2:
TABLE 2: PASSENGER SERVICE UNIT-MOUNTED VIDEO MONITOR REPLACEMENT Refer to the listed procedures in SB 757-25-0321 Original Issue or later approved revisions as an accepted procedure Method of ComplianceActionCondition -FIGURE 2At all Passenger Service- Unit (PSU) locations, replace any PSU-mounted video monitor without secondary retention lanyards with PSU-mounted video monitor with secondary retention lanyards. Make sure each inboard lanyard is attached to the inboard PSU rail.
All Airplanes.
PART 1: PASSENGER
SERVICE UNIT-MOUNT-
ED VIDEO MONITOR -
INSTALLATION TEST - Export Controlled ECCN: 9E991 See page 1 for details Original Issue: January 19, 2024 757-25-0321 RB 11 of 15 REQUIREMENTS BULLETIN 757-25-0321
REQUIREMENTS BULLETIN 757-25-0321 This Figure applies only to: Group 1.
PASSENGER COMPARTMENT (EXAMPLE)
LANYARDS
INBOARD
PSU RAIL "CARABINER
INBOARD PSU RAIL
INBD ATTACHMENT FOR
EACH INBOARD
LANYARD
PSU-MOUNTED VIDEO PANEL
WITH SECONDARY RETENTION
LANYARDS 2968182 FIGURE 1: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT-MOUNTED VIDEO MONITOR -
REPLACEMENT (SHEET 1 OF 2) Original Issue: January 19, 2024 757-25-0321 RB Export Controlled ECCN: 9E991 See page 1 for details 12 of 15