Copy · RB 757-29A0071 RB -- · 157 pages

© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2024-0762; AD 2024-25-09 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = 'db3b0d6236677f434a9bd29aab9bc771efa8f77a0de5122d9ebf95828a52ea92'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Commercial Airplanes 757 Requirements Bulletin ALERT Number: 757-29A0071 RB Original Issue: November 16, 2023 ATA System: 2922 SUBJECT: HYDRAULIC POWER - Hydraulic Power Transfer Unit System - Relay Installation and Wire Bundle Replacement EXPORT CONTROLLED - This technology or software is subject to the U.S. Export Administration Regulations (EAR), (15 C.F.R. Parts 730-774). No authorization from the U.S. Department of Commerce is required for export, re-export, in-country transfer, or access EXCEPT to country group E:1 or E:2 countries/persons per Supp.1 to Part 740 of the EAR.

9E991ECCN:

Copyright © 2023 Boeing.

Unpublished Work. All Rights Reserved.

Treatment of this document and its content is governed by contract with Boeing. Rights to use this document are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company.

Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.

Original Issue: November 16, 2023 757-29A0071 RB 1 of 157

2.0

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 16, 2023 757-29A0071 RB 2 of 157 REQUIREMENTS BULLETIN 757-29A0071

ALERTALERT

BLANK PAGE

Table of Contents

1 . E F F E C T I V I T Y5

A. Airplanes5

B . S p a r e s A f f e c t e d8

2. CONCURRENT REQUIREMENTS8

3 . C O M P L I A N C E8

4. APPROVAL ................................................ 1 0

5. ACCOMPLISHMENT INSTRUCTIONS .................................. 1 1 A. General Information ......................................... 1 1 B. Work Instructions ........................................... 1 2 FIGURE 1: P33 PANEL - RELAYS K10902 AND K10904 - INSTALLATION .............. 1 7 FIGURE 2: P33 PANEL - WIRE BUNDLE W1230 - WIRE ROUTING [Group 1-5] ........... 1 9 FIGURE 3: P33 PANEL - WIRE BUNDLE W1230 - CHANGE [Group 1-5] ................ 2 1 FIGURE 4: P33 PANEL - ELECTRICAL CONNECTOR D43312J - INSTALLATION .......... 2 4 FIGURE 5: BETWEEN P11 PANEL AND P33 PANEL - WIRE BUNDLE W2360 - WIRE ROUTING . . 26 FIGURE 6: BETWEEN P11 PANEL AND P33 PANEL - WIRE BUNDLE W2360 - CHANGE ...... 3 0 FIGURE 7: BETWEEN P33 PANEL AND DISCONNECT BRACKET AD1090 - WIRE BUNDLE W4236 - REMOVAL [Group 1-2, 4] ................................... 3 2 FIGURE 8: BETWEEN P33 PANEL AND DISCONNECT BRACKET AD0880 - WIRE BUNDLE W4236 - WIRE ROUTING [Group 1-3] ................................. 3 3 FIGURE 9: BETWEEN P33 PANEL AND DISCONNECT BRACKET AD0880 - WIRE BUNDLE W4236 - INSTALLATION [Group 1-3] .................................. 4 5 FIGURE 10: RIGHT BODY FAIRING - FEEDTHRU SEALS - INSTALLATION [Group 1-4] ....... 4 7 FIGURE 11: RIGHT FORWARD CARGO MIXBAY - WIRE BUNDLE W4236 CLAMP - INSTALLATION [Group 1 - 4 ] ............................................... 4 9 FIGURE 12: DISCONNECT BRACKET AD0880 - ELECTRICAL CONNECTOR D43412J AND WIRE BUNDLE CLAMP - INSTALLATION [Group 1-3] ............................ 5 1 FIGURE 13: BETWEEN DISCONNECT BRACKET AD1090 AND POWER TRANSFER UNIT CONTROL VALVE - WIRE BUNDLE W2514 - REMOVAL [Group 1, 3] ................. 5 3 FIGURE 14: BETWEEN DISCONNECT BRACKET AD0880 AND POWER TRANSFER UNIT CONTROL VALVE - WIRE BUNDLE W2514 - WIRE ROUTING [Group 1, 3] .............. 5 4 FIGURE 15: BETWEEN DISCONNECT BRACKET AD0880 AND POWER TRANSFER UNIT CONTROL VALVE - WIRE BUNDLE W2514 - INSTALLATION [Group 1, 3] .............. 5 7 FIGURE 16: RIGHT WHEEL WELL BULKHEAD - FEEDTHRU SEALS - INSTALLATION ........ 6 0 FIGURE 17: BETWEEN DISCONNECT BRACKET AD1090 AND POWER TRANSFER UNIT CONTROL VALVE - WIRE BUNDLE W2514 - REMOVAL [Group 2] ................... 6 2 FIGURE 18: BETWEEN DISCONNECT BRACKET AD0880 AND POWER TRANSFER UNIT CONTROL VALVE - WIRE BUNDLE W2514 - WIRE ROUTING [Group 2] ............... 6 3 FIGURE 19: BETWEEN DISCONNECT BRACKET AD0880 AND POWER TRANSFER UNIT CONTROL VALVE - WIRE BUNDLE W2514 - INSTALLATION [Group 2] ................ 6 6 FIGURE 20: BETWEEN P33 PANEL AND DISCONNECT BRACKET AD0770 - WIRE BUNDLE W6670 - REMOVAL [Group 3] ...................................... 6 9 FIGURE 21: BETWEEN DISCONNECT BRACKET AD0770 AND DISCONNECT BRACKET AD1090 - WIRE BUNDLE W5770 - REMOVAL [Group 3] ........................... 7 0 FIGURE 22: BETWEEN P33 PANEL AND DISCONNECT BRACKET AD0880 - WIRE BUNDLE W4236 - WIRE ROUTING [Group 4] .................................. 7 1 FIGURE 23: BETWEEN P33 PANEL AND DISCONNECT BRACKET AD0880 - WIRE BUNDLE W4236 - INSTALLATION [Group 4] ................................... 8 3 Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 16, 2023 757-29A0071 RB 3 of 157 REQUIREMENTS BULLETIN 757-29A0071

ALERTALERT

FIGURE 24: DISCONNECT BRACKET AD0880 - ELECTRICAL CONNECTOR D43412J AND WIRE BUNDLE CLAMP - INSTALLATION [Group 4] .............................. 8 5 FIGURE 25: BETWEEN DISCONNECT BRACKET AD1090 AND POWER TRANSFER UNIT CONTROL VALVE - WIRE BUNDLE W2514 - REMOVAL [Group 4] ................... 8 7 FIGURE 26: BETWEEN DISCONNECT BRACKET AD0880 AND POWER TRANSFER UNIT CONTROL VALVE - WIRE BUNDLE W2514 - WIRE ROUTING [Group 4] ............... 8 8 FIGURE 27: BETWEEN DISCONNECT BRACKET AD0880 AND POWER TRANSFER UNIT CONTROL VALVE - WIRE BUNDLE W2514 - INSTALLATION [Group 4] ................ 9 1 FIGURE 28: BETWEEN P33 AND DISCONNECT BRACKET AD0881 - WIRE BUNDLE W4236 - REMOVAL [Group 5] ............................................ 9 4 FIGURE 29: BETWEEN P33 PANEL AND DISCONNECT BRACKET AD0881 - WIRE BUNDLE W4236 - WIRE ROUTING [Group 5] .................................. 9 5 FIGURE 30: BETWEEN P33 AND DISCONNECT BRACKET AD0881 - WIRE BUNDLE W4236 - INSTALLATION [Group 5] .................................. 1 0 7 FIGURE 31: RIGHT BODY FAIRING - FEEDTHRU - INSTALLATION [Group 5] ............ 1 1 0 FIGURE 32: RIGHT FORWARD CARGO MIXBAY - WIRE BUNDLE W4236 CLAMP - INSTALLATION [Group 5 ] ................................................ 1 1 2 FIGURE 33: DISCONNECT BRACKET AD0881 - ELECTRICAL CONNECTOR D43412J - INSTALLATION [Group 5] ............................................ 1 1 4 FIGURE 34: BETWEEN DISCONNECT BRACKET AD0881 AND POWER TRANSFER UNIT CONTROL VALVE - WIRE BUNDLE W2514 - REMOVAL [Group 5] .................. 1 1 6 FIGURE 35: BETWEEN DISCONNECT BRACKET AD0881 AND POWER TRANSFER UNIT CONTROL VALVE - WIRE BUNDLE W2514 - WIRE ROUTING [Group 5] ............... 1 1 7 FIGURE 36: BETWEEN DISCONNECT BRACKET AD0881 AND POWER TRANSFER UNIT CONTROL VALVE - WIRE BUNDLE W2514 - INSTALLATION [Group 5] ............... 1 2 0 FIGURE 37: P33 PANEL - WIRE BUNDLE W1230 - WIRE ROUTING [Group 6] ............ 1 2 3 FIGURE 38: P33 PANEL - WIRE BUNDLE W1230 - CHANGE [Group 6] ................ 1 2 5 FIGURE 39: BETWEEN P33 PANEL AND DISCONNECT BRACKET AE0503 - WIRE BUNDLE W4058 - REMOVAL [Group 6] ..................................... 1 2 8 FIGURE 40: BETWEEN E5-3 SHELF AND DISCONNECT BRACKET AE0503 - WIRE BUNDLE W1200 - REMOVAL [Group 6] ..................................... 1 2 9 FIGURE 41: BETWEEN DISCONNECT BRACKET AE0503 AND DISCONNECT BRACKET AD0881 - WIRE BUNDLE W4010 - REMOVAL [Group 6] ........................... 1 3 0 FIGURE 42: BETWEEN P33 PANEL AND DISCONNECT BRACKET AD0881 - WIRE BUNDLE W4236 - W I R E R O U T I N G [ G r o u p 6 ] .................................. 1 3 1 FIGURE 43: BETWEEN P33 AND DISCONNECT BRACKET AD0881 - WIRE BUNDLE W4236 - INSTALLATION [Group 6] .................................. 1 4 3 FIGURE 44: RIGHT BODY FAIRING - FEEDTHRU - INSTALLATION [Group 6] ............ 1 4 6 FIGURE 45: DISCONNECT BRACKET AD0881 - ELECTRICAL CONNECTOR D43412J - INSTALLATION [Group 6] ............................................ 1 4 8 FIGURE 46: BETWEEN DISCONNECT BRACKET AD0881 AND POWER TRANSFER UNIT CONTROL VALVE - WIRE BUNDLE W2514 - REMOVAL [Group 6] .................. 1 5 0 FIGURE 47: BETWEEN DISCONNECT BRACKET AD0881 AND POWER TRANSFER UNIT CONTROL VALVE - WIRE BUNDLE W2514 - WIRE ROUTING [Group 6] ............... 1 5 1 FIGURE 48: BETWEEN DISCONNECT BRACKET AD0881 AND POWER TRANSFER UNIT CONTROL VALVE - WIRE BUNDLE W2514 - INSTALLATION [Group 6] ............... 1 5 4 APPENDIX A: OPERATIONAL TEST .................................... 1 5 7 Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 16, 2023 757-29A0071 RB 4 of 157 REQUIREMENTS BULLETIN 757-29A0071

ALERTALERT

Commercial Airplanes 757 Requirements Bulletin ALERT Number: 757-29A0071 RB Original Issue: November 16, 2023 ATA System: 2922 SUBJECT: HYDRAULIC POWER - Hydraulic Power Transfer Unit System - Relay Installation and Wire Bundle Replacement

THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT. THE BOEING

PROCESSES USED TO CREATE THE SERVICE BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS…) OF THE RB WHICH THE SB REFERS TO AS THE RELATED DOCUMENT.

1. Effectivity A. Airplanes This bulletin is applicable to 757-200, 757-200CB, 757-200PF, 757-300 Airplane(s), line number(s) 1-2, 5, 14-15, 42, 46, 56, 74-75, 80, 97, 101-102, 106, 111-115, 117, 123, 127, 130, 132, 139, 141, 143, 145, 147-151, 153, 155, 162-163, 165-167, 169, 173-174, 176, 178, 180-184, 186-187, 189, 191, 193, 195, 197, 199-200, 203-204, 208-209, 211-215, 218-221, 224-232, 235-239, 246, 248-250, 255-257, 259, 264-265, 267-268, 270-271, 273-275, 279, 281, 285, 287-288, 291-294, 298, 300-302, 306, 312, 314, 317-319, 322-323, 325-326, 330, 332-335, 339-345, 347-350, 353-355, 359-364, 369-372, 374, 376-379, 382-389, 392-395, 397-400, 402-404, 407, 409-412, 414-418, 421-422, 424-425, 429-430, 432-433, 435-443, 445-446, 448-449, 453, 455, 458-459, 461, 465-466, 470-478, 480-482, 485-486, 489, 493, 495-503, 506, 508, 510-516, 518-519, 521, 523, 525-528, 530-546, 548-549, 551-556, 558-559, 561-571, 573-575, 577-586, 588-590, 592-597, 599, 601-605, 607-619, 622-625, 627-683, 685-707, 709-717, 719, 721-780, 782-800, 802-834, 836-875, 877-888, 890-894, 896-1050 in 6 Group(s). Where the effectivity is presented with hyphens between line numbers, the airplane applicability means "through" and "inclusive", e.g. line numbers 1-9 means line numbers 1 through 9 inclusive.

The Variable Numbers and Group Information for the applicable airplanes is given below.

DESCRIPTIONCONFIGURATIONGROUP 757-200, 757-200CB, 757-200PF, 757-300 Airplanes with a different wiring configuration.

-1 757-200 Airplanes with a different wiring configuration.-2 Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 16, 2023 757-29A0071 RB 5 of 157

DESCRIPTIONCONFIGURATIONGROUP 757-200, 757-300 Airplanes with a different wiring configuration.-3 757-200 Airplanes with a different wiring configuration.-4 757-200 Airplanes with a different wiring configuration.-5 757-200 Airplane with a different wiring configuration.-6 Airplane Models:

757-200, 757-200CB, 757-200PF, 757-300 GroupVariable Number 6NA001 5NA002 5NA005 2NA021 4NA022 - NA028 4NA195 4NA197 - NA199 5NA205 4NA227 - NA228 4NA230 4NA235 - NA239 4NA301 - NA305 4NA343 - NA344 4NA346 - NA352 4NA392 - NA399 5NA401 2NA404 4NA406 4NA441 - NA447 1NA505 1NA519 - NA522 1NA549 - NA552 GroupVariable Number 1NA554 - NA555 1NA558 - NA576 1NA578 - NA586 1NB023 1NB037 1NB041 1NB053 1NB062 - NB066 1NB070 - NB073 1NB079 1NB131 - NB148 1NB161 - NB162 1NB167 - NB168 4NB201 - NB202 4NB221 - NB228 4NB230 4NB236 4NB239 1NB261 - NB267 1NB291 - NB299 1NB301 - NB302 1NB311 - NB312 GroupVariable Number 1NB321 - NB330 1NB421 1NB424 1NB428 - NB431 1NB434 - NB435 1NB437 - NB438 1NB446 1NB451 - NB454 1NB501 - NB523 1NB571 1NB581 - NB583 1NC042 1NC051 - NC052 1NC056 - NC062 1NC066 - NC084 1NC091 - NC094 1NC151 1NC161 1NC901 - NC951 1NC971 1NC973 - NC974 1ND004 Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 16, 2023 757-29A0071 RB 6 of 157 REQUIREMENTS BULLETIN 757-29A0071

ALERTALERT

GroupVariable Number 1ND012 1ND017 1ND032 1ND039 - ND041 1ND044 1ND046 1ND048 1ND052 - ND053 1ND111 1ND113 1ND161 1ND163 - ND166 1ND169 - ND176 1ND178 - ND188 1ND190 - ND199 1ND201 - ND202 1ND221 - ND225 1ND241 - ND242 1ND244 - ND247 1ND301 - ND322 1ND401 1ND895 1NE001 - NE003 1NE008 1NE012 1NE017 1NE021 - NE022 1NE025 1NE029 1NE031 1NE036 - NE037 1NE040 - NE041 1NE044 GroupVariable Number 1NE048 - NE051 1NE054 - NE055 1NE067 - NE075 1NE077 - NE081 1NE083 - NE088 1NE092 - NE094 1NE145 1NE147 1NE161 - NE164 1NE166 1NE168 1NE170 - NE172 1NE174 - NE176 1NE201 1NE204 1NE301 1NE311 - NE325 3NJ001 - NJ004 3NJ031 - NJ032 3NJ551 - NJ555 1NL001 - NL002 1NL006 - NL017 3NL101 - NL109 3NL141 3NL601 - NL616 1NN001 - NN002 1NN051 - NN052 1NP901 - NP904 1NS601 - NS616 1NT001 - NT009 1NT201 - NT202 4NT231 - NT234 4NT237 - NT238 GroupVariable Number 1NT239 - NT240 1NT242 1NT245 - NT248 1NT281 - NT284 1NT286 - NT289 1NT341 - NT343 1NT345 - NT347 1NT351 - NT360 1NT371 - NT373 1NT375 - NT379 4NT381 - NT386 1NT401 - NT409 1NT411 - NT412 1NT426 - NT427 1NT431 - NT432 1NT436 - NT438 1NT441 - NT442 1NT446 1NT701 - NT750 1NT752 - NT769 1NT791 - NT796 1NT861 - NT862 1NT881 1NT884 - NT885 1NT901 - NT903 1NT905 - NT916 1NT971 - NT985 1NU031 - NU038 1NU701 - NU705 1NU721 - NU728 1NU731 - NU732 -- -- B. Spares Affected Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 16, 2023 757-29A0071 RB 7 of 157 REQUIREMENTS BULLETIN 757-29A0071

ALERTALERT

None.

2. CONCURRENT REQUIREMENTS None.

3. COMPLIANCE The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to Requirements bulletin 757-29A0071 RB. The Airworthiness Directive will make the compliance tasks and times given in Requirements bulletin 757-29A0071 RB mandatory.

When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When more than one ACTION is given for a CONDITION or an OPTION, do all of the ACTION numbers for that CONDITION or OPTION.

Accomplish the required action(s), based on the applicable condition(s) in Table(s) 1 through 3, in accordance with Accomplishment Instructions.

Group 1-2, 4-5:

Table 1: P33 Panel Relays Installation and Wiring Bundle Changes Repeat Interval (Not to Exceed) Boeing Recommended Compliance Time (Whichever Occurs First) ActionCondition -Within 30 months after the Original Issue date of Requirements Bulletin 757-29A0071 RB.

Within 2760 flight cycles after the Original Issue date of Requirements Bulletin 757- 29A0071 RB.

ACTION 1: In the P33 panel, install new relays, install new connector and change wire bundle W1230.

All Airplanes -ACTION 2: Install new connector and change wire bundle W2360.

-ACTION 3: Install new connector and change wire bundle W4236.

-ACTION 4: Install new connector and change wire bundle W2514.

-ACTION 5: Do the Operational Test. If the test fails, do applicable corrective action(s) and repeat the test until the test passes.

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 16, 2023 757-29A0071 RB 8 of 157 REQUIREMENTS BULLETIN 757-29A0071

ALERTALERT

Group 3:

Table 2: P33 Panel Relays Installation and Wiring Bundle Changes Repeat Interval (Not to Exceed) Boeing Recommended Compliance Time (Whichever Occurs First) ActionCondition -Within 30 months after the Original Issue date of Requirements Bulletin 757-29A0071 RB.

Within 2760 flight cycles after the Original Issue date of Requirements Bulletin 757- 29A0071 RB.

ACTION 1: In the P33 panel, install new relays, install new connector and change wire bundle W1230.

All Airplanes -ACTION 2: Install new connector and change wire bundle W2360.

-ACTION 3: Install new connector and change wire bundles W5770, W6670 and W4236.

-ACTION 4: Install new connector and change wire bundle W2514.

-ACTION 5: Do the Operational Test. If the test fails, do applicable corrective action(s) and repeat the test until the test passes.

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 16, 2023 757-29A0071 RB 9 of 157 REQUIREMENTS BULLETIN 757-29A0071

ALERTALERT

Group 6:

Table 3: P33 Panel Relays Installation and Wiring Bundle Changes Repeat Interval (Not to Exceed) Boeing Recommended Compliance Time (Whichever Occurs First) ActionCondition -Within 30 months after the Original Issue date of Requirements Bulletin 757-29A0071 RB.

Within 2760 flight cycles after the Original Issue date of Requirements Bulletin 757- 29A0071 RB.

ACTION 1: In the P33 panel, install new relays, install new connector and change wire bundle W1230.

All Airplanes -ACTION 2: Install new connector and change wire bundle W2360.

-ACTION 3: Install new connector and change wire bundles W1200, W4010, W4058 and W4236.

-ACTION 4: Install new connector and change wire bundle W2514.

-ACTION 5: Do the Operational Test. If the test fails, do applicable corrective action(s) and repeat the test until the test passes.

4. APPROVAL This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes specified in this document comply with the applicable regulations and are FAA approved, as well as European Union Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved airplanes listed in this Requirements Bulletin effectivity. This document and its approval were based on the airplane in its original Boeing delivery configuration or as modified by other Boeing changes.

If an airplane has a non-Boeing modification or repair that affects a component or system also affected by this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval before incorporating this Requirements Bulletin.

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 16, 2023 757-29A0071 RB 10 of 157 REQUIREMENTS BULLETIN 757-29A0071

ALERTALERT

5. ACCOMPLISHMENT INSTRUCTIONS A. GENERAL INFORMATION NOTE: 1. This is an Enhanced Required for Compliance document. There will be a separate Service Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated by an Airworthiness Directive (AD), then all applicable requirements specified in the RB must be done. For the related SB, some locations are marked RC Start and RC End to identify the requirements that are restated from the RB. For the related SB, the areas between RC Start and RC End, including sub-steps and any figures identified between RC Start and RC End, must be done to comply with the AD.

Therefore, an Alternative Method of Compliance (AMOC) is required for any deviations to steps between RC Start and RC End, including substeps and identified figures.

For the related SB, the steps not between RC Start and RC End may be deviated from using accepted methods in accordance with the operator's maintenance or inspection program without obtaining approval of an AMOC; this is provided that the steps between RC Start and RC End, including sub-steps and identified figures, can still be done as specified, and the airplane can be put back in an airworthy condition.

Figures not required for compliance are omitted from the RB.

2. This is an Enhanced Required for Compliance document. The Boeing processes used to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure that the information between "RC Start" and "RC End" in the SB are identical to the information in the same sections (Compliance, Work Instructions...) of the RB which the SB refers to as the related document.

3. The compliance times for the actions in WORK INSTRUCTIONS are in Compliance.

4. Unless shown differently, these dimensions and tolerances are used:

– Linear dimensions are in inches – Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus or minus 0.03 inch – Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch – Angular tolerance is plus or minus 2 degrees – Hole dimensions for standard solid rivets and fasteners are in Structural Repair Manual (SRM) Chapter 51 – Torque Values:

— Values for structural fasteners are given in 757 Structural Repair Manual, Chapter 51.

— Values for airframe maintenance tasks are included in Chapter 20 of 757 Aircraft Maintenance Manual (AMM).

— Values for electrical maintenance tasks are included in Chapter 20 of Standard Wiring Practices Manual (SWPM).

— Values for engine maintenance tasks are included in Chapter 70 of 757 Aircraft Maintenance Manual (AMM).

— Non-standard torque values for maintenance tasks are included in the applicable installation step.

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 16, 2023 757-29A0071 RB 11 of 157 REQUIREMENTS BULLETIN 757-29A0071

ALERTALERT

5. These work instructions refer to procedures included in other Boeing documents.

When the words "refer to" are used and the operator has an accepted alternative procedure, the accepted alternative procedure can be used. When the words "in accordance with" are included in the instruction, the procedure in the Boeing document must be used.

6. Where the work instructions include installation of a kept part, a new or serviceable part with the same part number can be installed as an alternative to the kept part.

7. If it is necessary to remove more parts for access, you can remove those parts. If you can get access without removing identified parts, it is not necessary to remove all of the identified parts. Jacking and shoring limitations must be observed.

8. Use the approved fastener, process and material substitutions in accordance with SRM Chapter 51.

9. Refer to the SWPM 20-10-11 and SWPM 20-10-12 for the wire installation procedures, and SWPM 20-10-19 for the wire separation requirements, as accepted procedures.

10. The necessary conditions for selection of clamp type and size are included in SWPM 20-10-12. If any wire bundle support clamp specified in this service bulletin does not make a correct fit on the wire bundle, refer to SWPM 20-10-12 as an accepted procedure to select a clamp that fits correctly.

11. If the length of any fastener specified in this service bulletin does not meet installation standards given in SRM Chapter 51, then a fastener of the same specification, or an approved substitute, with a length which meets the installation standards given in SRM Chapter 51 may be used. In addition, washers may be installed for fastener grip length in accordance with SRM Chapter 51. Refer to SOPM 20-50-01 for alternate full threaded fasteners (screws) needed for installation in this service bulletin.

B. WORK INSTRUCTIONS Actions Required for Compliance

1. Requirements Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 16, 2023 757-29A0071 RB 12 of 157 REQUIREMENTS BULLETIN 757-29A0071

ALERTALERT

Pages 13–24 of 157