TextPartly OCR
Some pages are OCR from a scan. OCR can misread letters and numbers.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '7551acb4b59520567e08d9f695b2946431a522331472e88d1eb9531bb9d7087d' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = '7551acb4b59520567e08d9f695b2946431a522331472e88d1eb9531bb9d7087d' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
Commercial Airplanes 767 Service Bulletin Number: 767-28A0090 Original Issue: July 03, 2008 Revision 2: September 02, 2010 ATA System: 2822 2825 2826 2831 SUBJECT: FUEL - Main and Center Tanks - Valve Actuator Inspection and Replacement Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 730-774). An export license may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data has the individual responsibility to abide by all export laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET Copyright © 2008 The Boeing Company Unpublished Work - All Rights Reserved Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third parties.
Treatment of the document and the information it contains is governed by contract with Boeing. For more information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and the Boeing livery are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 03, 2008 767-28A0090Revision 2: September 02, 2010 1 of 119
2.0
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 03, 2008 767-28A0090Revision 2: September 02, 2010 2 of 119 BOEING SERVICE BULLETIN 767-28A0090
BLANK PAGE
Table of Contents
Revision Transmittal Sheet5
Summary7
1. PLANNING INFORMATION ........................................ 1 1 A. Effectivity ............................................... 1 1
1. Airplanes ............................................ 1 1
2. Spares Affected ........................................ 2 0 B. Concurrent Requirements ...................................... 2 0 C. Reason ................................................ 2 0 D. Description .............................................. 2 1 E. Compliance .............................................. 2 3 F. Approval ............................................... 2 3 G. Manpower .............................................. 2 3 H. Weight and Balance Changes .................................... 4 0 I. Electrical Load Data ......................................... 4 0 J. References .............................................. 4 1
1. Existing Data: ......................................... 4 1
2. Data supplied with this Service Bulletin: ........................... 4 1
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 4 1 K. Publications Affected ........................................ 4 1 L. Interchangeability and Intermixability of Parts ........................... 4 2
2. MATERIAL INFORMATION ........................................ 4 3 A. Material - Price and Availability ................................... 4 3 B. Industry Support Information .................................... 4 4 C. Parts Necessary For Each Airplane ................................. 4 4
1. Kits/Parts: ........................................... 4 4
2. Parts and Materials Supplied by the Operator: ........................ 4 5
3. Parts Modified and Reidentified: ............................... 4 6
4. Parts Removed and Not Replaced: .............................. 4 6 D. Parts Necessary to Change Spares ................................. 4 6 E. Special Tooling - Price and Availability ............................... 4 6 F. Special Tooling Necessary to do this Service Bulletin ....................... 4 6
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 4 7 A. GENERAL INFORMATION ..................................... 4 7 B. WORK INSTRUCTIONS ....................................... 4 8 FIGURE 1: INSPECT AND RECORD DEFUELING MOV ACTUATOR PART NUMBER ........ 7 2 FIGURE 2: REMOVE AND KEEP INDEX PLATE ............................. 7 4 FIGURE 3: REWORK INDEX PLATE ................................... 7 6 FIGURE 4: MEASURE AND RECORD ELECTRICAL RESISTANCE FROM ADAPTER PLATE TO THE AIRPLANE SURFACE ..................................... 7 7 FIGURE 5: PREPARE ADAPTER PLATE ................................. 7 8 FIGURE 6: PUT INDEX PLATE IN POSITION FOR INSTALLATION .................. 7 9 FIGURE 7: INSTALL THE MOV ACTUATOR ............................... 8 0 FIGURE 8: CLEAN ADAPTER PLATE AND AIRPLANE SURFACE ................... 8 4 FIGURE 9: INSPECT AND RECORD FUEL JETTISON TRANSFER MOV ACTUATOR PART NUMBER - LEFT .............................................. 8 5
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 03, 2008 767-28A0090Revision 2: September 02, 2010 3 of 119 BOEING SERVICE BULLETIN 767-28A0090
FIGURE 10: INSPECT AND RECORD FUEL JETTISON TRANSFER MOV ACTUATOR PART NUMBER - RIGHT .............................................. 8 7 FIGURE 11: INSPECT AND RECORD FUEL JETTISON NOZZLE MOV ACTUATOR PART NUMBER - LEFT .................................................. 8 9 FIGURE 12: INSPECT AND RECORD FUEL JETTISON NOZZLE MOV ACTUATOR PART NUMBER - RIGHT .............................................. 9 1 FIGURE 13: INSPECT AND RECORD APU SHUTOFF MOV ACTUATOR PART NUMBER ...... 9 3 FIGURE 14: INSPECT AND RECORD APU ISOLATION MOV ACTUATOR PART NUMBER ..... 9 4 FIGURE 15: INSPECT AND RECORD ENGINE FUEL SHUTOFF MOV ACTUATOR PART NUMBER - LEFT .................................................. 9 5 FIGURE 16: INSPECT AND RECORD ENGINE FUEL SHUTOFF MOV ACTUATOR PART NUMBER - RIGHT .............................................. 9 6 FIGURE 17: INSPECT AND RECORD DUAL FORWARD/AFT ENGINE FUEL CROSSFEED MOV ACTUATOR .................................................. 9 7 FIGURE 18: INSPECT AND RECORD SINGLE ENGINE FUEL CROSSFEED MOV ACTUATOR PART NUMBER - LEFT WING .................................... 9 9 FIGURE 19: INSTALL THE MOV ACTUATOR DIRECTLY TO THE MOTOR OPERATED VALVE . . 100 FIGURE 20: REMOVE BRACKET AND INSTALL NEW BRACKET ON ENGINE FUEL SHUTOFF MOV ACTUATOR DEFLECTOR - LEFT .............................. 1 0 4 FIGURE 21: REMOVE BRACKET AND INSTALL NEW BRACKET ON ENGINE FUEL SHUTOFF MOV ACTUATOR DEFLECTOR - RIGHT ............................. 1 0 7 FIGURE 22: INSTALL THE SHIM AND FORWARD ENGINE FUEL CROSSFEED MOV ACTUATOR . 110 FIGURE 23: INSTALL THE SHIM AND AFT ENGINE FUEL CROSSFEED MOV ACTUATOR .... 1 1 5
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 03, 2008 767-28A0090Revision 2: September 02, 2010 4 of 119 BOEING SERVICE BULLETIN 767-28A0090
Commercial Airplanes 767 Service Bulletin Revision Transmittal SheetNumber: 767-28A0090Original Issue: July 03, 2008 Revision 2: September 02, 2010 ATA System: 2822 2825 2826 2831 SUBJECT: FUEL - Main and Center Tanks - Valve Actuator Inspection and Replacement This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION Federal Aviation Administration (FAA) Airworthiness Directive AD 2009-22-13, is related to this service bulletin.
More work is necessary on airplanes VF181-VF184 changed in accordance with the original issue or Revision 1 of this service bulletin. These airplanes must be in Group 1 since they are equipped with equipment numbers V00157, V00158, V00159 and V00160.
REASON FOR REVISION This revision is sent to correct the effectivity, applicability, summary of hours in the Manpower tables, a number of typographical errors, and nomenclature in the figures. The changes are as follows:
1. In paragraph 1.A. Effectivity, moved VF181-VF184 from Group 4 to Group 1 to include equipment numbers V00157, V00158, V00159 and V00160.
2. In Summary, Manpower, corrected the total tasks hours and elapsed time in the summary table.
3. In paragraph 1.G, Manpower, corrected the applicability in the Work Package summary tables title: "Only the Work Packages for these Groups".
4. In Figure 7, Illustration, removed the applicability. Refer to the applicability in the Accomplishment Instructions.
5. In Figure 7, Illustration, removed the sentence "This figure has been deleted." This was a typographical error.
6. In Figure 13, Step Table, Step 1, QTY, revised the QTY to one (1).
7. In Figure 22, Illustration, removed the applicability. Refer to the applicability in the Accomplishment Instructions.
8. In Figure 23, Illustration, removed the applicability. Refer to the applicability in the Accomplishment Instructions.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location of important changes.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 03, 2008 767-28A0090Revision 2: September 02, 2010 5 of 119
Pages with no vertical lines have no important changes.
REVISION HISTORY July 03, 2008Original Issue:
April 01, 2010Revision 1:
September 02, 2010Revision 2:
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 03, 2008 767-28A0090Revision 2: September 02, 2010 6 of 119 BOEING SERVICE BULLETIN 767-28A0090
Commercial Airplanes 767 Service Bulletin SummaryNumber: 767-28A0090Original Issue: July 03, 2008 Revision 2: September 02, 2010 ATA System: 2822 2825 2826 2831 SUBJECT: FUEL - Main and Center Tanks - Valve Actuator Inspection and Replacement
CONCURRENT REQUIREMENTS None.
BACKGROUND This service bulletin gives instructions to inspect all the motor operated valve (MOV) actuators and to install new MOV actuators where necessary. The new MOV actuator will prevent electrical current flow through the actuator into the fuel tank. If this service bulletin is not done it is possible that a flow of electricity into the fuel tank will supply an ignition source for the fuel fumes in the tank.
The Boeing system safety assessment necessary for Special Federal Aviation Regulation (SFAR) 88, showed that under specific conditions it was possible for electrical current to flow through certain MOV actuators into the fuel tank. A new MOV actuator is available to replace the existing MOV actuator with this condition. The new MOV actuator includes an internal electrical isolator to give the MOV actuator protection against electrical energy from lightning, 115 VAC hot shorts, and 28 VDC internal shorts. The new MOV actuator will prevent the flow of an electrical current into the fuel tank and increase the reliability of the fuel system.
This service bulletin replaces the MOV actuator part number MA20A1001-1 with the new MOV actuator part number MA30A1001. The MOV actuator part number MA20A1001-1 is the only installed MOV actuator part number that is affected by this service bulletin.
This service bulletin gives instruction on how to measure the electrical resistance of bonds at the installed MOV actuator locations, how to prepare a Faying surface for the install of the new MOV actuator, how to prepare affected airplane parts, and how to install the new MOV actuator.
This service bulletin is the result of a safety assessment conducted by Boeing under SFAR 88, "Fuel Tank System Fault Tolerance Evaluation Requirements".
Section 9 of the 767 Maintenance Planning Data (MPD) Document was change.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 03, 2008 767-28A0090Revision 2: September 02, 2010 7 of 119
ACTION (PRR B13421-6) — Gain access to each MOV actuator.
— Inspect each MOV actuator part number. If the MOV actuator part number is MA20A1001-1, remove, discard, and replace with the MOV actuator part number MA30A1001. The MA20A1001-1 is the only installed MOV actuator part number that is affected by this service bulletin.
— If you are required to install the MA30A1001, you must do an electrical resistance check at each location.
If the measured resistance is not acceptable, you must rework the Faying bond and the airplane parts. This may require rework of the index plate and the adapter. This may require a tank entry to rework the interface between the adapter and the airplane structure.
— If you are required to install the MA30A1001 at the dual forward/aft engine fuel crossfeed valve actuator location, you must inspect for the "SWEENEY ENGR CORP" marking on the adapter. If found, you must install the shim kit.
— Some airplane models have a deflector installed at the left and right engine fuel shutoff MOV actuator location, where an installed wire support assembly can potentially interfere with the new MOV actuator. If you are required to install the MA30A1001 at these locations, you must also install the new wire support assembly on the deflector. The new wire support assembly will prevent part interference.
— Close access to each MOV actuator.
EFFECTIVITY 767 -200 /-300 /-300F /-400ER airplanes. Refer to Paragraph 1.A., Effectivity for the list of effected airplanes.
COMPLIANCE Federal Aviation Administration (FAA) Airworthiness Directive 2009-22-13 is related to this service bulletin.
Boeing recommends that this service bulletin be incorporated within 60 months from the effective date of FAA AD 2009-22-13.
INDUSTRY SUPPORT INFORMATION Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
MANPOWER Elapsed HoursTotal Task HoursAirplanes
188.95 (a)(b)437.45 (a)(b)Group 1.0
188.95 (a)(b)437.45 (a)(b)Group 2.0
104.65 (a)(b)227.15 (a)(b)Group 3.0
104.65 (a)(b)227.15 (a)(b)Group 4.0
191.05 (a)(b)440.05 (a)(b)Group 5.1
182.30 (a)(b)429.30 (a)(b)Group 5.2
104.75 (a)(b)229.75 (a)(b)Group 6.1
96.00 (a)(b)219.00 (a)(b)Group 6.2
191.05 (a)(b)440.05 (a)(b)Group 7.1
104.75 (a)(b)229.75 (a)(b)Group 7.2
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 03, 2008 767-28A0090Revision 2: September 02, 2010 8 of 119 BOEING SERVICE BULLETIN 767-28A0090
Elapsed HoursTotal Task HoursAirplanes
182.30 (a)(b)429.30 (a)(b)Group 7.3
96.00 (a)(b)219.00 (a)(b)Group 7.4
104.75 (a)(b)229.75 (a)(b)Group 8.1
96.00 (a)(b)219.00 (a)(b)Group 8.2
206.90 (a)(b)485.90 (a)(b)Group 9.0
191.05 (a)(b)440.05 (a)(b)Group 10.1
104.57 (a)(b)229.75 (a)(b)Group 10.2
182.30 (a)(b)429.30 (a)(b)Group 10.3
96.00 (a)(b)219.00 (a)(b)Group 10.4
(a) Entry into the fuel tank should not be frequent.
(b) If entry into the fuel tank is not necessary, the time needed to do the work is much less.
MATERIAL INFORMATION Operator Supplied Parts.
Refer to Paragraph 2.A., Material - Price and Availability.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 03, 2008 767-28A0090Revision 2: September 02, 2010 9 of 119 BOEING SERVICE BULLETIN 767-28A0090
BOEING SERVICE BULLETIN 767-28A0090
DEFUELING MOV
ENGINE FUEL
ACTUATOR
CROSS FEED
MOV ACTUATOR
FUEL JETTISON
APU FUEL SHUTOFF NOZZLE MOV
MOV ACTUATOR ACTUATOR
APU FUEL
ISOLATION MOV
ACTUATOR ENGINE FUEL FUEL JETTISON
DEFUELING MOV SHUTOFF MOV TRANSFER MOV
ACTUATOR ACTUATOR ACTUATOR
FUEL JETTISON
NOZZLE MOV FUEL JETTISON
ACTUATOR TRANSFER MOV
ACTUATOR INSPECT THE MOV ACTUATORS AT THE ABOVE LOCATIONS.
- IF THE MOV ACTUATOR HAS AN UNACCEPTABLE PART NUMBER, REPLACE THE MOV ACTUATOR.
- PREPARE AN ELECTRICAL BOND.
REAR SPAR
REAR SPAR
INDEX PLATE
ADAPTER PLATE → FWD FWD <
TYPICAL MOV ACTUATOR TYPICAL MOV ACTUATOR
INSTALLATION WITHOUT INDEX INSTALLATION WITH INDEX PLATE PLATE U31989 Original Issue: July 03, 2008 Revision 2: September 02, 2010 767-28A0090
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 10 of 119
Commercial Airplanes 767 Service Bulletin Number: 767-28A0090 Original Issue: July 03, 2008 Revision 2: September 02, 2010 ATA System: 2822 2825 2826 2831 SUBJECT: FUEL - Main and Center Tanks - Valve Actuator Inspection and Replacement
1. PLANNING INFORMATION A. Effectivity
1. Airplanes Refer to Service Bulletin Index Document D624T001 Part 3 for Airplane Variable Number, Line Number, and Serial Number data.
This service bulletin is for the airplanes shown below. An equivalent change is on subsequent production airplanes. Refer to PRR B13421-6 for data about this change.
DESCRIPTIONCONFIGURATIONGROUP 767-200/300/300F airplanes with the production dual crossfeed installation, and with the production fuel jettison installation. Requires an inspection to determine if the Sweeney adapters are present.
-1 767-200/300/300F airplanes with the production dual crossfeed installation, with the production fuel jettison installation, and with the Sweeney adapters installed during production. Requires an inspection to determine if the Sweeney adapters are present.
-2 767-200/300/300F airplanes with the production dual crossfeed installations, without the fuel jettison, without the APU isolation, with the center auxiliary tank defuel valve, and with the Sweeney adapters present.
-3 767-200/300/300F airplanes with the production dual crossfeed installation, without the fuel jettison installation, and without the production APU isolation installation. Requires an inspection to determine if the Sweeney adapters are present.
-4
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 03, 2008 767-28A0090Revision 2: September 02, 2010 11 of 119
DESCRIPTIONCONFIGURATIONGROUP 767-200/300/300F airplanes effected by Boeing service bulletin 767-28-0034 to install the dual crossfeed, with the production jettison installation, and with the production APU isolation. Requires an inspection to determine if the Sweeney adapters are present.
-5 Made changes as given in Boeing service bulletin 767-28-0034.1 Did not make changes as given in Boeing service bulletin 767-28-0034.
2 767-200/300/300F airplanes effected by Boeing service bulletin 767-28-0034 to install the dual crossfeed, without the production jettison installation, with the production APU isolation installation, and without the center auxiliary tank defuel valve.
-6 Made changes as given in Boeing service bulletin 767-28-0034.1 Did not make changes as given in Boeing service bulletin 767-28-0034.
2 767-200/300/300F airplanes effected by Boeing service bulletin 767-28-0034 to install the dual crossfeed, and effected by Boeing service bulletin 767-28-0027 to install the fuel jettison, and with the production APU isolation installation.
-7 Made changes as given in Boeing service bulletin 767-28-0034, and made changes as given in Boeing service bulletin 767-28-0027.
1 Made changes as given in Boeing service bulletin 767-28-0034, but did not make changes as given in Boeing service bulletin 767-28-0027.
2 Did not make changes as given in Boeing service bulletin 767-28-0034, but made changes as given in Boeing service bulletin 767-28-0027.
3 Did not make changes as given in Boeing service bulletin 767-28-0034, and did not make changes as given in Boeing service bulletin 767-28-0027.
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: July 03, 2008 767-28A0090Revision 2: September 02, 2010 12 of 119 BOEING SERVICE BULLETIN 767-28A0090