© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2025-0348; AD 2026-05-15 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '72e51eb952a10a4c7434ed334f00ab998a5ff9378f9348121489236546edecba'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

REQUIREMENTS BULLETIN 777-33-0069

FIGURE 4: PASSENGER COMPARTMENT - SIDEWALL LIGHT BRACKET AND RINGPOST - INSTALLATION (SHEET 2 OF 3) Original Issue: October 15, 2024

Export Controlled ECCN: 9E991 See page 1 for details

777-33-0069 RB 26 of 36

REQUIREMENTS BULLETIN 777-33-0069 27 of 36 See page 1 for details

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY numbers shown below are the number of parts necessary for each sidewall light location.

Step Task Name Identification Qty More Data 1 Remove / Keep SIDEWALL LIGHT WITH RGB LED 1J5011-200135-() OR 1J5011-200142-() OR 1J5011-200156-() 1 (a) 2 Remove SCREW - 2 - 3 Install (New) BRACKET, SIDEWALL LIGHT 421W3352-8 1 - 4 Install (New) SCREW BACS12GU3K5 2 (b) 5 Install (New) NUTPLATE BACN10YD1G 1 (b) Install (New) RINGPOST, WIRE HARNESS

MOUNTING SUPPORT BACS31H2B 1 (c) 6 Route POWER CONNECTOR WIRE BUNDLE

- 1 (d) Install (New) STRAP BACS38W3 1 (c)(e) 7 Install (Kept) SIDEWALL LIGHT WITH RGB LED 1J5011-200135-() OR 1J5011-200142-() OR 1J5011-200156-() 1 (a)

(a) Refer to 777 AMM 33-21-03 as an accepted procedure.

(b) Refer to SOPM 20-50-01 as an accepted procedure.

(c) Refer to SWPM 20-10-12 as an accepted procedure.

(d) Refer to SWPM 20-10-11 as an accepted procedure.

(e) Use to tie power connector wire bundle to ringpost. Make sure wire bundle has sufficient length to connect to airplane connector.

FIGURE 4: PASSENGER COMPARTMENT - SIDEWALL LIGHT BRACKET AND RINGPOST - INSTALLATION (SHEET 3 OF 3) Original Issue: October 15, 2024

Export Controlled ECCN: 9E991

777-33-0069 RB

REQUIREMENTS BULLETIN 777-33-0069 28 of 36 See page 1 for details

This Figure applies only to: Group 5.

FIGURE 5: PASSENGER COMPARTMENT - SIDEWALL LIGHT BRACKET AND RINGPOST AT STA 554 -

INSTALLATION (SHEET 1 OF 3) Original Issue: October 15, 2024

Export Controlled ECCN: 9E991

777-33-0069 RB

Page 4OCROpen in PDF

REQUIREMENTS BULLETIN 777-33-0069 STA 554

1.00 MAX FWD

VIEW LOOKING INBOARD (TYPICAL)

VIEW LOOKING OUTBOARD (TYPICAL) 3047742 FIGURE 5: PASSENGER COMPARTMENT - SIDEWALL LIGHT BRACKET AND RINGPOST AT STA 554 -

INSTALLATION (SHEET 2 OF 3) Original Issue: October 15, 2024 777-33-0069 RB Export Controlled ECCN: 9E991 See page 1 for details 29 of 36

REQUIREMENTS BULLETIN 777-33-0069 30 of 36 See page 1 for details

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY numbers shown below are the number of parts necessary for each airplane.

Step Task Name Identification Qty More Data 1 Install (New) GULL WING BRACKET 421W3352-5 1 - 2 Install (New) WASHER BACW10P461CG 1 - Install (New) SCREW BACS12GU3K4 1 (a)(b) 3 Install (New) NUTPLATE BACN10YD1G 1 (b) Install (New) RINGPOST, WIRE

HARNESS MOUNTING

SUPPORT BACS31H2B 1 (c) 4 Route POWER CONNECTOR

WIRE BUNDLE

- 1 (d) Adjust POWER CONNECTOR

WIRE BUNDLE

- 1 (e) Install (New) STRAP BACS38W3 1 (c)(f)

(a) Engage with existing fastener.

(b) Refer to SOPM 20-50-01 as an accepted procedure.

(c) Refer to SWPM 20-10-12 as an accepted procedure.

(d) Refer to SWPM 20-10-11 as an accepted procedure.

(e) Make loop in POWER CONNECTOR WIRE BUNDLE for possible expansion.

(f) Use to tie power connector wire bundle to ringpost.

FIGURE 5: PASSENGER COMPARTMENT - SIDEWALL LIGHT BRACKET AND RINGPOST AT STA 554 -

INSTALLATION (SHEET 3 OF 3) Original Issue: October 15, 2024

Export Controlled ECCN: 9E991

777-33-0069 RB

REQUIREMENTS BULLETIN 777-33-0069 31 of 36 See page 1 for details

This Figure applies only to: Group 5, 7.

FIGURE 6: PASSENGER COMPARTMENT - SIDEWALL LIGHT BRACKET AND RINGPOST - INSTALLATION (SHEET 1 OF 3) Original Issue: October 15, 2024

Export Controlled ECCN: 9E991

777-33-0069 RB

Page 7OCROpen in PDF

REQUIREMENTS BULLETIN 777-33-0069

VIEW LOOKING INBOARD (TYPICAL)

VIEW LOOKING OUTBOARD (TYPICAL) 3047750 FIGURE 6: PASSENGER COMPARTMENT - SIDEWALL LIGHT BRACKET AND RINGPOST - INSTALLATION (SHEET 2 OF 3) Original Issue: October 15, 2024 777-33-0069 RB Export Controlled ECCN: 9E991 See page 1 for details 32 of 36

REQUIREMENTS BULLETIN 777-33-0069 33 of 36 See page 1 for details

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY numbers shown below are the number of parts necessary for each sidewall light location.

Step Task Name Identification Qty More Data 1 Install (New) GULL WING BRACKET 421W3352-6 1 - 2 Install (New) WASHER BACW10P461CG 1 - Install (New) SCREW BACS12GU3K4 1 (a)(b) 3 Install (New) NUTPLATE BACN10YD1G 1 (b) Install (New) RINGPOST, WIRE HARNESS

MOUNTING SUPPORT BACS31H2B 1 (c) 4 Route POWER CONNECTOR WIRE BUNDLE

- 1 (d) Install (New) STRAP BACS38W3 1 (c)(e)

(a) Engage with existing fastener.

(b) Refer to SOPM 20-50-01 as an accepted procedure.

(c) Refer to SWPM 20-10-12 as an accepted procedure.

(d) Refer to SWPM 20-10-11 as an accepted procedure.

(e) Use to tie power connector wire bundle to ringpost.

FIGURE 6: PASSENGER COMPARTMENT - SIDEWALL LIGHT BRACKET AND RINGPOST - INSTALLATION (SHEET 3 OF 3) Original Issue: October 15, 2024

Export Controlled ECCN: 9E991

777-33-0069 RB

REQUIREMENTS BULLETIN 777-33-0069 34 of 36 See page 1 for details

This Figure applies only to: Group 7.

FIGURE 7: PASSENGER COMPARTMENT - SIDEWALL LIGHT CLIP AND RINGPOST AT STA 478 -

INSTALLATION (SHEET 1 OF 3) Original Issue: October 15, 2024

Export Controlled ECCN: 9E991

777-33-0069 RB