TextOCR
This text is OCR from a scan. OCR can misread letters and numbers.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'b5c0d481acaee5969f5a1a65f55abfbaa74df8a541640e47bd42bd896561de11' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'b5c0d481acaee5969f5a1a65f55abfbaa74df8a541640e47bd42bd896561de11' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
ALERT DOUGLAS AIRCRAFT COMPANY ALERT
SERVICE BULLETIN
FUS (FSN) EUS (ESN FUS (FSN) FUS (FSN) FUS (FSN) FUS (ESN) 1158(49256) 11.84 (49205) 1210 (49291) 1235 (49236) 1260 (49415) 1285 (49394) 1159(49262) 1185 (49265) 1211 (49292) 1236 (49383) 1261 (49402) T286 (49395) 1160 (49257) 1186 (49250) 1212 (49293) 1237 (49384) 1262 (49216) 1287 (49386) 1161 (49258) 1187 (49288) 1213(49294) 1238 (49266) 1263 (49421) 1288 (49387) 1162(49259) 1188 (49206) 1214 (49295) 1239 (49267) 1264 (49422) 1289 (49324) 1163 (49263) 1189 (49207) 1215 (49296) 1240 (49425) 1265 (49318) 1290 (49325) 1164(49269) 1190 (49208) 1216 (49297) 1241 (49428) 1266 (49319) 1291 (49443) 1165 (49270) 1191 (49209) 1217 (49298) 1242 (49429) 1267 (49320) 1292(49501) 1166 (49271) 1192 (49210) 1218 (49299) 1243 (49213) 1268 (49217) 1293 (49478) 1167 (49272) 1193 (49289) 1219 (49300) 1244 (49385) 1269 (49390) 1294 (49358) 1168 (49273) 1194(49280) 1220 (49301) 1245 (49214) 1270 (49391) 1295(49326) 1169 (49252) 1195(49290) 1221 (49302) 1246 (49309) 1271 (49416) 1296 (49327) 1170 (49202) 1196 (49366) 1222 (49303) 1247 (49310) 1272 (49392) • 1297 (49479) 1171 (49264) 1197 (49367) 1223 (49304) 1248 (49311) 1273 (49321) 1298 (49480) 1172 (49188) 1198 (49368) 1224 (49355) 1249 (49312) 1274 (49218) 1299 (49283) 1174 1173 (49189) (49203) 1199(49369) 1200 (49281) 1225 1226 (49380) (49305) 1251 1250 (49356) 1275 (49363) 1300 (49502) (49357) 1276 (49364) 1301 (49328) 1175(49286) 1201 (49373) 1227 (49306) 1252 (49372) 1277 (49365) 1302 (49329) 1176 (49287) 1202 (49211) 1228 (49307) 1253 (49215) 1278 (49417) 1303 (49436) 1177 (49231) 1203 (49233) 1229 (49308) 1254 (49420) 1279 (49393) 1304 (49440) 1178 (49232) 1204(49234) 1230 (49279) 1255 (49313) 1280 (49322) 1305 (49396) 1179 (49204) 1205 (49379) 1231 (49381) 1256 (49314) 1281 (49323) 1306 (49331) 1180(49190) 1206 (49370) 1232 (49382) 1257 (49315) 1282 (49282) 1307 (49332) 181 (49277) 1207 (49371) 1233 (49212) 1258 (49316) 1283 (49423) 1308 (49481) 1182 (49164) 1208 (49374) 1183 (49278) 1209 (49284) 1234 (49235) 1259 (49317) 1284 (49424) 1309 (49482) This modification will be incorporated prior to delivery on all applicable DC-9, Series MD-80; MD-88 aircraft, manufacturer's fuselage number 1310 and subsequent.
(2) Spares Affected:
None.
B. Reason:
Eight operators have reported cracks in the ventral aft pressure bulkhead attach tee sections on eight aircraft. The affected aircraft had accumulated between 45,492 and 60,969 landings when the cracks were found. The predominate areas of cracks are at the upper pylon attach angle between longerons 13 and 14 (6 cases) and lower pylon attach angle between longerons 16 and 17 (2 cases). Longerons 2, 7, 11, and 18 each had one crack. The cracks exhibited similar behavior, cracking circumferentially approximately l.9 inches outboard of the inboard edge of the upstanding leg of the bulkhead attach tee sections. Cracks were found up to 8.8 inches in length. Analysis of failed parts revealed that the cracks initiated at multiple sites on the forward surface of the upstanding leg of the tee as the result of fatigue due primarily to bending loads. If cracks are not detected and repaired, they could progress to the point that rapid decompression could occur. Inspection of high cycle aircraft and accomplishment of repairs based on condition will allow continued flight operation.
Bulletin A53-232 March 28/90 Page 12 Revision 2 April 28/95 McDonnell Douglas Corporation Propriatary Infomation. Use or disclosure of THESE DATA SUBJECT TO RESTRICTIVE LEGEND ON TITLE PAGE OR FIRST PAGE.
ALERT DOUGLAS AIRCRAFT COMPANY ALERT -
SERVICE BULLETIN C. Description:
This Service Bulletin accomplishes the following on the fuselage aft pressure bulkhead.
Option I (Inspection from aft side of bulkhead) Performs visual and low frequency eddy current inspections for cracked aft pressure bulkhead web-to-fuselage tee sections around entire periphery of the fuselage from aft side of bulkhead and accomplishes the following:
Condition 1 (No Crack) Repetitively visually and low frequency eddy current inspects for cracks from aft side of bulkhead at intervals specified in Compliance paragraph.
Condition 2 (Crack) Replaces cracked tee section with new like or improved part and repetitively visually and low frequency eddy current inspects for cracks from aft side of bulkhead at intervals specified in Compliance paragraph.
Option II (Inspection from forward side of bulkhead) Performs high and low frequency eddy current inspections for cracked aft pressure bulkhead web-to-fuselage tee sections around the entire periphery of the fuselage from the forward side of the bulkhead and accomplishes the following:
Condition 1 (No crack) Repetitively high and low frequency eddy current inspects for cracks from forward side of bulkhead at intervals specified in Compliance paragraph.
Condition 2 (Crack) Replaces cracked tee section with new like or improved part and paragraph. from forward side of bulkhead at intervals specified in Compliance repetitively high and low frequency eddy current inspects for cracks NOTE: Replacement of all six aft pressure bulkhead tee sections with new improved parts constitutes closing action for the repetitive inspection requirements of this Alert Service Bulletin.
March 28/90 Bulletin A53-232 Revision 2 April 28/95 Page 13 McDonnell Douglas Corporation Proprietary Information. Use or disclosure of
THESE DATA SUBJECT TO RESTRICTIVE I FGEND ON TITI E PAGE OR FIRST PAGE
ALERT DOUGLAS AIRCRAFT COMPANY ALERT
SERVICE BULLETIN D. Compliance:
It is recommended that initial inspection/repair of aft pressure bulkhead tee per Option I or II be accomplished as follows on aircraft having logged over 35,000 landings.
Accumulated Landings Initial Inspection 35,000 to 49,999 Within 1500 landings from issue date of this Service Bulletin.
50,000 to 59,999 Within 1000 landings from issue date of this Service Bulletin.
60,000 and over Within 300 landings from issue date of this Service Bulletin.
When aft pressure bulkhead tee section is replaced with new like part, the repetitive inspection for that section of tee may be discontinued until the aircraft has accumulated an additional 35,000 landings at which time the repetitive inspection for that section of tee are reinstated along with the ongoing repetitive inspections of the remaining original sections of tee.
When aft pressure bulkhead tee section is replaced with new improved part per this Service Bulletin, the repetitive inspection for that section of tee may be discontinued as this constitutes closing action for that section of tee. Perform the recommended Option I or Option II repetitive inspections on the remaining original tee sections.
Replacement of all six aft pressure bulkhead tee sections with new improved parts per this Alert Service Bulletin constitutes closing action for the inspection requirements of this Alert Service Bulletin.
It is recommended that repetitive inspection/repair of aft pressure bulkhead tee be accomplished per Option I or II as follows:
Option I (Inspection from aft side of bulkhead) It is recommended that repetitive low frequency eddy current inspection for cracks of side areas above floor between longerons 7 and 17 on exceed 1500 landings. fuselage left and right sides, be accomplished at intervals not to It is recommended that repetitive visual inspection for cracks of top and lower areas from longeron 7 left side to longeron 7 right side, and lower fuselage longeron 17 to longeron 20 on fuselage left and right sides, be accomplished at intervals not to exceed 1500 landings.
Bulletin A53-232 March 28/90 Page 14 Revision 2 April 28/95 McDonnell Douglas Corporation Proprietary Information. Use or disclosure of THESE DATA SUBJECT TO RESTRICTIVE LEGEND ON TITLE PAGE OR FIRST PAGE.
ALERT DOUGLAS AIRCRAFT COMPANY ALERT
SERVICE BULLETIN It is recommended that repetitive visual inspection for cracks of bottom areas from longeron 20 left side to longeron 20 right side, be accomplished at intervals not to exceed 3500 landings.
It is recommended that cracked tee section be replaced prior to further pressurized flight.
Option II (Inspection from forward side of bulkhead) It is recommended that repetitive high and low frequency eddy current inspection for cracks around entire periphery of fuselage from forward side of bulkhead be accomplished at intervals not to exceed 2500 landings.
It is recommended that cracked tee section be replaced prior to further pressurized flight.
E. Approval:
The resultant modification described in paragraph 1.C has been shown to comply with the applicable Federal Aviation Regulations and Revision 2 is approved by the Manager, Los Angeles Aircraft Certification Office, FAA Northwest Mountain Region, on April 28, 1995, and is approved as an Directive 89-16-12. alternate means of compliance with paragraphs A and B of Airworthiness F. Manpower:
NOTE: Man-hours are estimated based on work to be performed by skilled personnel on aircraft/unit which has been placed in a maintenance status. Only actual work performed on aircraft/unit is accounted for in man-hour estimates. No man-hours have been estimated to perform the following or other incidental work required to accomplish this Service Bulletin:
1. Preparation for the modification: Examples; defueling, purging, placing work stands, opening standard access doors, obtaining tools, and jacking when not essential to the modification.
2. Nonproductive elapsed time: Examples; sealant or adhesive cure time, cleaning, paint drying time, lunch and/or rest periods, and quality assurance inspections.
3. Administrative functions: Examples; planning, engineering liaison, parts requisition, shift change coordination, and report writing.
Operators should take the above into consideration when scheduling this modification.
March 28/90 Bulletin A53-232 Revision 2 April 28/95 Page 15 McDonnell Douglas Corporation Proprietary Information. Use or disclosure of THESE DATA SUBJECT TO RESTRICTIVE LEGEND ON TITLE PAGE OR FIRST PAGF.
ALERT DOUGLAS AIRCRAFT COMPANY ALERT
SERVICE BULLETIN Option I (Inspection from aft side of bulkhead) Optically aided visual inspection from the aft side of the fuselage aft pressure bulkhead may be accomplished in approximately 22.0 man-hours or 11.0 elapsed hours per aircraft.
Low frequency eddy current inspection from the aft side of the fuselage aft pressure bulkhead may be accomplished in approximately
11.5 man-hours or 5.8 elapsed hours per aircraft.
Man-hours do not include time for fabrication of flexible borescope guide tube.
Option II (Inspection from forward side of bulkhead) Removal and reinstallation of lavatories, equipment, and sealant for access to the forward side of the fuselage aft pressure bulkhead tee *an our or 5239 diased may be accomplished in approximately 140.1 man-hours or 52.9 elapsed hours per aircraft.
High and low frequency eddy current inspection from the forward side of the fuselage aft pressure bulkhead may be accomplished in approximately 8.0 man-hours or 4.0 elapsed hours per aircraft.
Man-hours do not include time for fabrication of eddy current reference standard.
Maximum total man-hours and elapsed hours are given for inspection per aircraft. Actual man-hours and elapsed hours for repair are contingent upon inspection findings and are to be estimated by the operator.
G. Material - Cost and Availability:
Aircraft:
Parts and materials required to accomplish this modification are listed in paragraph 3.A and are to be procured as indicated. Parts bearing Douglas Aircraft Company part numbers are proprietary parts and must be procured under the spare parts article of the purchase agreement, unless methods of manufacture are shown.
Cost and availability of parts are to be negotiated between the operator and Douglas Aircraft Company. Reference this Service Bulletin number and direct inquiries to:
Douglas Aircraft Company P.O. Box 1771 Long Beach, California 90801 Attn: Parts Sales - Commercial 35-12 (DC-9 Alert Service Bulletin A53-232)
(2) Spares:
Not applicable.
Bulletin A53-232 March 28/90 Page 16 Revision 2 April 28/95 McDonnell Douglas Corporation Propriatary Information. Use or disclosure of THESE DATA SUBJECT TO RESTRICTIVE LEGEND ON TITLE PAGE OR FIRST PAGE.
ALERT DOUGLAS AIRCRAFT COMPANY ALERT
SERVICE BULLETIN H. Tooling - Price and Availability:
Option I (Inspection from aft side of bulkhead)
(1) Special test equipment is required to accomplish the low frequency eddy current inspection per Option I outlined in this Service Bulletin. Special test equipment is to be procured from operator's stock, or sources indicated in paragraph 3.C.
(2) Douglas eddy current reference standard shown in Figure 2 and listed in paragraph 3.C is required to accomplish low frequency eddy current inspection per Option I and will be made available to the operator at no charge.
Procurement and availability of SB09530231-9 eddy current reference standard should be negotiated between the operator and the Douglas Aircraft Company. Specify this Service Bulletin number and direct inquiries to:
Douglas Aircraft Company 910 East 236th Street Carson, California 92805 Attn: Group Leader - Recovery and Modification Services 35-35 (DC-9 Alert Service Bulletin A53-232) Option II (Inspection from forward side of bulkhead)
(3) Test equipment required to accomplish high and low frequency eddy current inspections per Option II is listed in service sketch 3683D. Choice of test. equipment is at operator's option and is to be procured from operator's stock or sources indicated in service sketch 3683D.
(4) Reference standard required to accomplish high and low frequency eddy current inspections per Option II is shown in service sketch 3683D. Reference standard may be procured from operator's stock, fabricated by the operator, or purchased from source indicated in paragraph 3.D.
I. Weight and Balance:
Weight change at appropriate fuselage stations by incorporation of any part of this Service Bulletin is contingent upon the modification of each particular aircraft. weight data is to be computed by the operator by weighing parts installed and parts removed during modification. Necessary revisions should be made to the appropriate - weight and balance document.
March 28/90 Bulletin A53-232 Revision 2 April 28/95 Page 17 McDonnell Douglas Corporation Proprietary Information. Use or disclosure of
THESE DATA SUBJECT TO RESTRICTIVE LEGEND ON TITI F PAGF OR FIRST PAGE
ALERT DOUGLAS AIRCRAFT COMPANY ALERT
SERVICE BULLETIN J. References:
Federal Aviation Administration Airworthiness Directive No. 89-16-12: Amendment 39-6287, effective September 7, 1989.
(2) Alert Service Bulletins A53-147 and A53-191.
(3) Data used in preparation of this Alert Service Bulletin:
Data Identification Change Type of Data DMS 2082 Douglas Material Specification J060157 Service Rework Shoring J060157 B Advance E.O.
MM Chapters 6, 20, Maintenance Manual 21, 25, 26, 36, 49, 52, and 53 NDT Chapter 1-3 Nondestructive Testing Manual SRM Chapters 51 and 53 Structural Repair Manual SR09530001 C Service Rework Drawing SR09530001 D Advance E.O.
SR09530048 New Service Rework Drawing SR09530056 C Service Rework Drawing SR09530056 D Advance E.O.
SR09530083 New Service Rework Drawing 3683D Service Sketch (attached) 5910130 DY Drawing 5930760 AM Drawing
(4) Data supplied in support of this Alert Service Bulletin:
Data Identification Change Type of Data J060157 Service Rework Shoring J060157 B Advance E.O.
SR09530001 C Service Rework Drawing SR09530001 D Advance E.O.
SR09530048 New Service Rework Drawing SRO9530056 C Service Rework Drawing SR09530056 D Advance E.O.
SRO9530083 New Service Rework Drawing NOTE: Listed data are being furnished to each affected operator.
K. Publications Affected:
The modification outlined in this Service Bulletin affects the DC-9 Weight and Balance Documents.
L. Electrical Load Data:
Not affected.
M. Software Accomplishment Summary:
Not affected.
Bulletin A53-232 March 28/90 Page 18 Revision 2 April 28/95 McDonnell Douglas Corporation Proprietary Information. Use or discloure of THESE DATA SUBJECT TO RESTRICTIVE LEGEND ON TITLE PAGE OR FIRST PAGE.
ALERT DOUGLAS AIRCRAFT COMPANY ALERT -
SERVICE BULLETIN
2. Accomplishment Instructions:
WARNING: TO AVOID INJURY TO MAINTENANCE PERSONNEL
OR DAMAGE TO EQUIPMENT, MAKE CERTAIN
ADEQUATE PRECAUTIONS ARE TAKEN WHILE
PERFORMING ANY WORK IF ELECTRICAL POWER IS APPLIED TO THE AIRCRAFT.
CAUTION: ELECTRICALLY GROUND THE AIRCRAFT.
GENERAL NOTES:
1. Replacement of all six aft pressure bulkhead tee sections with new improved parts constitutes closing action for the repetitive inspection requirements of this Alert Service Bulletin.
If replacing all six aft pressure bulkhead tee sections, replacement should be accomplished one tee section at a time.
Refer to sections of the Maintenance Manual (MM), Structural Repair Manual (SRM), and Non-Destructive Testing Manual (NDT).
3. Refer to the following manual chapters for applicable operations:
Manual Chapter Operation MM 20-30-0 Sealant Application NOT 1-3 Eddy Current Inspection SRM 51-10-4 Drilling And Countersinking SRM SRM 51-30-2 51-30-1 . Removing And Installing Rivets Installing Bolts, Screws, and Washers SRM 51-30-3 Removing And Installing Lockbolts SRM 51-30-5 Removing And Installing Pins
4. For approved fastener and process material substitutions, see DC-9 SRM chapter 51-60-0, paragraph entitled "Interchangeability of Fasteners" and "Interchangeability of Materials."
5. If the length of the fasteners specified in this Service Bulletin do not meet acceptable installation standards, fasteners of the same type, or approved substitutions, one increment longer or shorter in length may be used.
6. A combined total of two (maximum) 1/16-inch thick washers or four (maximum) 1/32-inch thick washers or any combination thereof not exceeding 1/8-inch total stackup thickness of the washer types called for in this Service Bulletin may be used under fastener head or nut to counteract accumulation of tolerances.
If substitutions are used other than those in Douglas approved publications, operator must obtain FAA approval from local authorized agency.
March 28/90 Bulletin A53-232 Revision 2 April 28/95 Page 19 McDonnell Douglas Corporation Proprietary Information. Use or disclosure of
THESE DATA SUBJECT TO RESTRICTIVE LEGEND ON TITI F PAGF OR FIRST PAGF
ALERT DOUGLAS AIRCRAFT COMPANY ALERT
SERVICE BULLETIN Option I (Inspection from aft side of bulkhead) A. Operator's Option - Access doors may be installed in skin on bottom of fuselage forward of auxiliary power unit (APU) door per service rework drawing SR09530048 to facilitate inspection.
B. Operator's Option - Fabricate guide tube (to be used with flexiscope) from flexible or thin wall tubing to fit outside diameter of flexiscope as shown on Figure 1.
C. Operator's option - Fabricate reference standard as shown on Figure 2.
D. Gain access to inspection areas on aft side of bulkhead by opening or removing and retaining the following access doors/panels as applicable to accomplish visual and/or low frequency eddy current inspection:
AcceSS NO. Access Area MM Chapter 5806A Auxiliary Exit Door, 6-12-0 Non-Ventral Bulkhead 5901A Thrust Reverser Control 6-11-4 Valve (Left Side) 5902A Thrust Reverser Control 6-11-4 Valve (Right Side) 5903A APU Service (Left Side) 6-11-4 5904A APU Service (Right Side) 6-11-4 5910A Ventral Stair Ceiling 6-12-0 5911A Ventral Stair (Right Side) 6-12-0 5912A Ventral Stair (Left Side) 6-12-0 NOTE: The following paragraphs 2.D through 2.H may be accomplished at operator's option and are applicable to visual inspection requirements.
E. Remove and retain APU and attaching parts. (See MM chapter 49-10-0, paragraph entitled "Removal/Installation Power Plant.") Remove and retain APU compartment enclosure and attaching parts.
(See MM chapter 53-20-5, paragraph entitled "Removal/Installation APU Compartment Enclosure.") Bulletin A53-232 March 28/90 Page 20 Revision 2 April 28/95 McDonnell Douglas Corporation Propriotary Information. Use or diacloure of THESE NATA CIR IEFT TO RECTRICTIVE I FGEND ON TITLE PAGE OR FIRST PAGE.
ALERT DOUGLAS AIRCRAFT COMPANY ALERT
SERVICE BULLETIN G. Remove and retain lower firex bottle and attaching parts. (See MM chapter 26-20-1, paragraph entitled Removal/Installation Fire Extinguishing Containers.") H. Remove and retain right pneumatic crossfeed valve pushrod and attacning parts. (See мм cnapter Sb-10-3, paragrapn entitled "Removal/Installation Pneumatic Crossfeed Valve.") I. Remove and retain two upper conditioned air duct assemblies, check valves, and attaching parts aft of pressure bulkhead center ceiling.
(See MM chapter 21-20-2, paragraph entitled Removal/Installation Conditioned and Cold Air Check Valve.
J. Roll back or remove and retain insulation blankets from aft side of aft pressure bulkhead. (See MM chapter 25-22-0, paragraph entitled "Removal/Installation Insulation Blankets.") K. Perform optically aided visual and low frequency eddy current inspection/repair of the aft pressure bulkhead web to fuselage skin attach tee sections from the aft side of the bulkhead as follows:
(1) Inspect the upstanding leg of 5910130 ventral bulkhead tee sections from aft side of bulkhead around the periphery of the bulkhead as shown on Figure 3 and accomplish the following:
Condition 1 (No Crack)
(2) Perform repetitive visual and/or low frequency eddy current inspections from aft side of bulkhead at intervals specified in Compliance paragraph.
Condition 2 (Crack) Replace cracked tee section with new like or improved part per Figure 4 (See Table I for configuration) prior to further pressurized flight. Perform repetitive visual and/or low frequency eddy current inspections from aft side of bulkhead at intervals specified in Compliance paragraph.
If any tee section is to be replaced, remove and retain engines 1 and 2. (See MM chapter 71-00-0, paragraph entitled "Removal/Installation Power Plant.") NOTE: If replacing all six aft pressure bulkhead tee sections, replacement should be accomplished one tee section at a time.
(5) Shore aircraft as shown on Figure 5.
March 28/90 Bulletin A53-232 Revision 2 April 28/95 Page 21 McDonnell Douglas Corporation Proprietary Information. Use or disclosure of
THESE DATA SUBJECT TO RESTRICTIVE LEGEND ON TITI F PAGE OR FIRST PARE
ALERT DOUGLAS AIRCRAFT COMPANY ALERT
SERVICE BULLETIN -. Record and report all results, both negative and positive of inspectior to DAC. Include fuselage number, factory serial number, crack location, Forward to: crack length, flight-hours, and accumulated landings of aircraft.
Douglas Aircraft Company P.O. Box 1771 Long Beach, California 90801 Attn: Business Unit Manager Customer Services - Airframe Product Support 35-35 (DC-9 Alert Service Bulletin A53-232) M. Apply PR-1422 B-2 sealant around entire periphery of the bulkhead tee sections, as applicable.
N. Reinstall retained insulation blankets on aft side of aft pressure bulkhead. (See M chapter 25-22-0, paragraph entitled "Removal/Installation Insulation Blankets."
O. Reinstall right pneumatic crossfeed valve pushrod and attaching parts as applicable. (See MM chapter 36-10-3, paragraph entitled "Removal/Installation Pneumatic Crossfeed Valve.")
p. Reinstall two upper conditioned air duct assemblies, check valves, and attaching parts as applicable. entitled "Removal/Installation Conditioned and Cold Air Check Valve.") (See MM chapter 21-20-2, paragrapr Q. Reinstall lower firex bottle and attaching parts as applicable.
(See MM chapter 26-20-1, paragraph entitled Removal/Installation Fire Extinguishing Containers.").
R. Reinstall APU compartment enclosure, as applicable. (See MM chapter 53-20-5, paragraph entitled Removal/Installation APU Compartment Enclosure.i) S. Reinstall APU and attaching parts as applicable. (See MM chapter 49-10-0, paragraph entitled "Removal/Installation Power Plant.") T. Reinstall engines 1 and 2 as applicable. (See MM chapter 71-00-0, paragraph entitled "Removal/Installation Power Plant.") U. Remove shoring as shown on Figure 5 as applicable.
V. Close/reinstall access doors/panels as outlined under Option I paragraph 2.C.
Bulletin A53-232 March 28/90 Page 22 Revision 2 April 28/95 McDonnell Douglas Corporation Proprietary Information. Use or disclosure of THESE DATA SUBJECT TO RESTRICTIVE LEGEND ON TITLE PAGE OR FIRST PAGE.
ALERT DOUGLAS AIRCRAFT COMPANY ALERT -
SERVICE BULLETIN Option II (Inspection from forward side of bulkhead) Perform high and low frequency eddy current inspections of the aft pressure bulkhead web to fuselage skin attach tee sections from the forward side of the bulkhead as follows:
(1) Operator's Option - Fabricate eddy current reference standard as shown on service sketch 3683D, Figure 5.
(2) Remove and retain items as outlined in service sketch 3683D, Table I, as applicable.
(3) Inspect the standing leg of ventral bulkhead tee sections from forward side of bulkhead around the entire periphery of the bulkhead as shown on service sketch 3683D, and accomplish the following:
Condition 1 (No Crack) Perform repetitive high and low frequency eddy current inspections from forward side of bulkhead at intervals specified in Compliance paragraph.
Condition 2 (Crack) Replace cracked tee section with new like or improved part per Figure 4 (See Table I for configuration) prior to further pressurized flight. Perform repetitive high and low frequency eddy current inspections from forward side of bulkhead at intervals specified in Compliance paragraph.
(4) If any tee section is to be replaced, remove and retain engines 1 and 2. (See MM chapter 71-00-0, paragraph entitled "Removal/Installation Power Plant.") Shore aircraft as shown on Figure 5.
NOTE: If replacing all six aft pressure bulkhead tee sections, replacement should be accomplished one tee section at a time.
Forward to:
Douglas Aircraft Company P.O. Box 1771 Long Beach, California 90801 Attn: Business Unit Manager Customer Services - Airframe Product Support 35-35 (DC-9 Alert Service Bulletin A53-232) March 28/90 Bulletin A53-232 Revision 2 April 28/95 Page 23 McDonnell Douglas Corporation Proprietary Information. Use or disclosure of