TextOCR
This text is OCR from a scan. OCR can misread letters and numbers.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'b5c0d481acaee5969f5a1a65f55abfbaa74df8a541640e47bd42bd896561de11' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'b5c0d481acaee5969f5a1a65f55abfbaa74df8a541640e47bd42bd896561de11' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
ALERT DOUGLAS AIRCRAFT COMPANY ALERT
SERVICE BULLETIN C. Apply PR-1422 B-2 sealant around entire periphery of the bulkhead tee sections, as applicable.
D. Retagrall engitied Removal instalfation power Mantapter 71-00-0.
E. Remove shoring as shown on Figure 5 as applicable.
F. Close/reinstall retained items as outlined in service sketch 3683D Table I, as applicable.
Bulletin A53-232 March 28/90 Page 24 Revision 2 April 28/95 McDonnell Douglas Corporation Proprietary Information. Use or disclosure of THESE DATA SUBJECT TO RESTRICTIVE LEGEND ON TITLE PAGE OR FIRST PAGE.
ALERT DouGLAS aiRcraFT cOMpAnY ALERT -
SERVICE BULLETIN TUBE I.D. TO FIT O. D. OF FLEXISCOPE STA X=-20.000 • FLEXISCOPE GUIDE TUBE - STA Z=-40.000 -FLEXIBILE OR THIN WALL TUBING APPROX 3 FEET DETAIL FLEXISCOPE GUIDE TUBE MAKE FROM COMMERCIAL FLEXIBLE OR THIN WALL TUBING 3/8 OR 1/2-INCH DIAMETER STA X=-10.000 - INTERCOSTAL VIEW LOOKING FORWARD RIGHT SIDE AT FRAME INSTALLATION AFT OF PRESSURE BULKHEAD ILLUSTRATION OF GUIDE TUBE USE APPROX 2-3 INCHES.
FLEXIBLE BORESCOPE GUIDE TUBE - FABRICATION AND USE March 28/90 FIGURE 1 Bulletin A53-232 Revision 2 April 28/95 Page 25 McDonnail Douglas Corporation Proprietary Information. Use or disclosure of
THESE DATA SUBJECT TO RESTRICTIVE LEGEND ON TITLE PAGE OR FIRST PAGE
ALERT DOUGLAS AIRCRAFT COMPANY ALERT -
SERVICE BULLETIN EDM NOTCH • EDM NOTCH EDM NOTCH NO. 3 NO. 2 NO. 1
- + FORWARD
1.906 IN. (34.92 MM) 1.375 IN. 1.906 IN. SURFACE
(48.41 MM) (48.41 MM)
- 1.000 IN.
(25.40 MM)
- 2.750 IN.
(69.85 MM)
4.500 IN.
(114.30 MM)
6.000 IN.
(152.40 MM) LENGTH •DEPTH DETAIL SB09530231-9 EDDY CURRENT REFERENCE STANDARD MAKE FROM 1D0008S TEE-EXTRUDED SECTION (2024-0) HEAT TREAT TO 2024T42.
GENERAL NOTES:
EDM NOTCH (TYP)
1. EDM NOTCH MAXIMUM WIDTH .010-INCH (.25 MM).
2. NOTCH TO BE ON AND PERPENDICULAR TO FORWARD SURFACE.
EDM NOTCH
3. SCALE NONE.
- 2 3
4. THIS SB09530231-9 EDDY CURRENT REFERENCE LENGTH 1.000 1.000 1.000 STANDARD REQUIRED TO ACCOMPLISH OPTION I DEPTH 0.055 0.050 0.028 WILL BE MADE AVAILABLE BY DAC AT NO CHARGE, SEE PARAGRAPH 1.H.
TOLERANCES IN. = INCHES MM = MILLIMETERS ANGLES + 0° 30' 3 PLACE DECIMAL ‡.015 IN. (0.38 MM) 2 PLACE DECIMAL ‡.03 IN. (0.8 MM)
OPTION I EDDY CURRENT REFERENCE STANDARD - FABRICATION Bulletin A53-232 FIGURE 2 March 28/90 Page 26 Revision 2 April 28/95 McDonnell Douglas Corporation Proprietary Information. Use or disclosure of THESE DATA SUBJECT TO RESTRICTIVE LEGEND ON TITI E DARE nO CIDOT NA
ALERT DOUGLAS AIRCRAFT cOMPANY ALERT
SERVICE BULLETIN GENERAL NOTES:
1. PERFORM INSPECTION PROCEDURE A, SEQUENCES 1 THROUGH 3 BEFORE CLEANING THE TEE AND AFTER CLEANING THE TEE AS NOTED.
2. PROCEDURE A - DESCRIBES AN OPTICALLY AIDED VISUAL INSPECTION OF DC-9 AFT PRESSURE BULKHEAD
WEB TO FUSELAGE SKIN ATTACH TEE SECTIONS TO DETECT FATIGUE CRACKS IN THE UPSTANDING LEG OF TEE SECTIONS.
PROCEDURE B - DESCRIBES A LOW FREQUENCY EDDY CURRENT INSPECTION OF DC-9 AFT PRESSURE
BULKHEAD WEB TO FUSELAGE SKIN ATTACH TEE SECTIONS TO DETECT FATIGUE CRACKS IN THE UPSTANDING LEG OF TEE SECTIONS.
4. INSPECTION OF THE BULKHEAD TEE FOR CRACKS BY PROCEDURE A OR B IS MADE FROM THE AFT SIDE OF THE AFT PRESSURE BULKHEAD.
5. INSPECTION BY PROCEDURE A IS DIVIDED INTO THREE SEQUENCES BASED ON ACCESS LOCATION.
6. INSPECTION BY PROCEDURE B IS DIVIDED INTO TWO SEQUENCES BASED ON INSPECTION PROBE DESIGN.
a. INSPECTION PROCEDURE B, SEQUENCE 1, INSPECTS THE TEE ACUTE ANGLE TANGENT AREA OF THE UPSTANDING LEG OF TEE USING A MOLDED PROBE THAT CONFORMS TO THE RADIUS.
b. INSPECTION PROCEDURE B, SEQUENCE 2, INSPECTS EXTENDED AREA OF UPSTANDING LEG OF TEE.
AREA EXTENDS FROM THE VICINITY OF THE INBOARD ROW OF ATTACHMENTS INSTALLED THROUGH THE
TEE UPSTANDING LEG AND THEN EXTENDS OUTBOARD TO AND OVERLAPS THE AREA INSPECTED IN SEQUENCE 1. INSPECTION IS MADE USING A 90 DEGREE PROBE.
7. SIGNS OF NICOTINE STAINS MAY INDICATE CRACKS.
8. THE FOLLOWING EQUIPMENT OR EQUIVALENT IS REQUIRED:
SEE PARAGRAPH 3.C FOR TEST EQUIPMENT SUPPLIERS.
VISUAL EQUIPMENT:
a. FLASHLIGHT.
b. INSPECTION MIRROR WITH ADJUSTABLE VIEWING ANGLE.
ENDOSCOPE EQUIPMENT:
ONE 70 OR 90 DEGREE ENDOSCOPE OF ANY DIAMETER WITH 18-INCH (457.2 MM) MINIMUM LENGTH AND LIGHT SOURCE SUCH AS:
(1) ENDOSCOPE MODEL 10320D, 70 DEGREE (FOREOBLIQUE) ANGLE, 19-INCH (482.6 MM) LONG, 0.217-INCH DIAMETER.
(2) FIBER OPTIC LIGHT BUNDLE MODEL 495NL.
(3) ENDOSCOPE LIGHT SOURCE NUMBER 00482 (110 OR 220 VOLT) OR NUMBER E0590 (110 VOLT ONLY).
(4) SYLVANIA PROJECTOR LAMP (150 WATT, 120 VOLT).
AFT PRESSURE BULKHEAD TEE - INSPECTION March 28/90 FIGURE 3 (SHEET 1 OF 17) Bulletin A53-232 Revision 2 April 28/95 Page 27 McDonnell Douglas Corporation Proprietary Information. Use or disclosure of THESE DATA SUBJECT TO RESTRICTIVE LEGEND ON TITLE PAGE OR FIRST PAGE.
ALERT DOUGLAS AIRCRAFT COMPANY ALERT
SERVICE BULLETIN FLEXIBLE BORESCOPE:
d. ONE FORWARD VIEWING ENDOSCOPE OF ANY DIAMETER WITH 30 INCH MINIMUM LENGTH SUCH AS:
(1) OLYMPUS MODEL 1F8D3, 29.8-INCH (757 MM) LONG, 0.315-INCH DIAMETER. =
(2) COLD LIGHT SUPPLY NUMBER 1LK-4 (100 TO 230 VOLT).
EDDY CURRENT EQUIPMENT:
e. ONE EDDY CURRENT FLAW DETECTOR WITH IMPEDANCE PLANE DISPLAY SUCH AS:
STAVELEY INSTRUMENTS EDDY CURRENT INSTRUMENT, TYPE NDT-18 OR NDT-19 OR ZETEC EDDY CURRENT INSTRUMENT, MIZ-20A
f. LOW FREQUENCY EDDY CURRENT PROBES SUCH AS:
(1) MOLDED PROBE OPERATING BETWEEN 5 AND 50 kHz: CATALOG NUMBER 935-0120, PART NUMBER APB/MSP, ZETEC INCORPORATED; OR MODEL SPO-4080 STAVELEY INSTRUMENTS. (SEE SHEET 6.)
NOTE: IF SERVICE BULLETIN 53-147 HAS BEEN
ACCOMPLISHED, SUBSTITUTE STAVELEY INSTRUMENTS SPO-5222 IN PLACE OF PROBES LISTED IN PARAGRAPH F.(1).
(SEE SHEET 7.)
PENCIL 90 DEGREE ANGLE PROBE OPERATING BETWEEN 5 AND 50 kHZ:
CRADEL SO-4081 STAVELEY INSTRUMENTS. 582E SHEET INCORPORATED;
g. SB09530231-9 EDDY CURRENT REFERENCE STANDARD.
AFT PRESSURE BULKHEAD TEE - INSPECTION Bulletin A53-232 FIGURE 3 (SHEET 2 OF 17) March 28/90 Page 28 Revision 2 April 28/95 McDonnell Douglas Corporation Proprietary Information. Use or disclosure of
THESE DATA SUBJECT TO RESTRICTIVE LEGEND ON TITLE PAGE OR FIRST PAGE
ALERT DOUGLAS AIRCRAFT COMPANY ALERT SERVICE BULLETIN -
INSPECTION PROCEDURE A. VISUAL INSPECTION PROCEDURE A:
SEQUENCE 1:
PERFORM MIRROR/FLASHLIGHT OR ENDOSCOPE INSPECTION OF UPPER FUSELAGE TEE SECTIONS FROM LONGERON L7 LEFT SIDE TO LONGERON L7 RIGHT SIDE, LOWER
FUSELAGE LONGERON LIZ LEFT SIDE TO LONGERON LZO LEFT SIDE, AND LONGERON L17 RIGHT TO LONGERON L19 RIGHT SIDE.
(2) PERFORM ENDOSCOPE OR FLEXIBLE BORESCOPE INSPECTION OF LOWER FUSELAGE TEE SECTIONS FROM LONGERON L19 RIGHT SIDE TO LONGERON L20 RIGHT SIDE.
SEQUENCE 2:
PERFORM MIRROR/FLASHLIGHT OR ENDOSCOPE INSPECTION OF LOWER FUSELAGE TEE SECTION THROUGH THRUST REVERSER LOCKOUT ACCESS OPENING 5901A FROM LONGERON L20 LEFT SIDE TO LONGERON L23 LEFT SIDE.
(2) PERFORM MIRROR/FLASHLIGHT OR ENDOSCOPE INSPECTION OF LOWER FUSELAGE TEE SECTION THROUGH THRUST REVERSER LOCKOUT ACCESS OPENING 5902A FROM LONGERON L20 RIGHT SIDE TO LONGERON L24 RIGHT SIDE.
NOTE: SEQUENCE 2 AND 3 MAY BE ACCOMPLISHED
USING INSPECTION MIRROR AND FLASHLIGHT IF SUFFICIENT ACCESS IS AVAILABLE.
SEQUENCE 3:
(1) PERFORM VISUAL INSPECTION OF LOWER FUSELAGE TEE SECTIONS WITH FLASHLIGHT FROM LONGERON L23 LEFỊ SIDE TO LONGERON L24 RIGHT SIDE.
REMOVE SEALANT FROM INSPECTION AREA OF TEE SECTIONS THAT MAY HINDER INSPECTION. CLEAN DIRT, GREASE, AND ALL FOREIGN MATERIALS FROM INSPECTION AREA OF TEE SECTIONS USING LINT-FREE WIPER AND 1,1,1 TRICHLOROETHANE SOLVENT OR EQUIVALENT. PERFORM INSPECTION SEQUENCES 1 THROUGH 3 AFTER CLEANING THE TEE SECTIONS.
B. LOW FREQUENCY EDDY CURRENT INSPECTION PROCEDURE B:
NOTE: PROCEDURE B, LOW FREQUENCY EDDY CURRENT
INSPECTION PROCEDURE IS APPLICABLE TO AREA OF TEE SECTION BETWEEN LONGERONS 17 AND L17
ON LEFT AND RIGHT SIDES OF FUSELAGE THAT ARE NOT COVERED BY SPLICE PLATES OR SHOVEL CLIPS.
AFT PRESSURE BULKHEAD TEE - INSPECTION March 28/90 FIGURE 3 (SHEET 3 OF 17) Bulletin A53-232 Revision 2 April 28/95 Page 29 McDonnell Douglas Corporation Proprietary Information. Use or disclosure of THESE DATA SUBJECT TO RESTRICTIVE LEGEND ON TITLE PAGE OR FIRST PAGE.
ALERT DOUGLAS AIRCRAFT COMPANY ALERT
SERVICE BULLETIN SEQUENCE 1:
(1) CALIBRATE EDDY CURRENT EQUIPMENT AS FOLLOWS:
CONNECT MOLDED PROBE TO EDDY CURRENT INSTRUMENT AND SET OPERATING FREQUENCY AT 7 KHZ PER MANUFACTURER'S INSTRUCTIONS.
NOTE: IF SERVICE BULLETIN 53-147 HAS BEEN
ACCOMPLISHED, USE STAVELEY INSTRUMENT SPO-5222 PROBE. IF SERVICE BULLETIN 53-147 HAS NOT BEEN ACCOMPLISHED, USE
MOLDED PROBE LISTED IN PARAGRAPH F.(1). SEE SHEETS 6 AND 7.)
(b) PLACE MOLDED PROBE ON REFERENCE STANDARD IN AN AREA FREE FROM NOTCH OR EDGE EFFECTS. NULL/BALANCE THE INSTRUMENT AND ADJUST LIFT-OFF PER MANUFACTURER'S INSTRUCTIONS.
SCAN ACROSS REFERENCE STANDARD EDM NOTCH 1 WITH MOLDED PROBE AND
ADJUST SENSITIVITY AND PHASE CONTROLS TO OBTAIN A DISPLAY SIMILAR TO THAT SHOWN ON SHEET 15 FOR STANDARD PROBE OR SHEET 16 FOR MODIFIED PROBE.
(2) PERFORM EDDY CURRENT INSPECTION OF AFT PRESSURE BULKHEAD TEE AS FOLLOHS:
PLACE MOLDED PROBE IN THE RADIUS OF UPSTANDING LEG OF TEE AFT SIDE OF TEE, AND RENULL/BALANCE INSTRUMENT. IN AREA FREE FROM EDGE OR FASTENER EFFECTS, SCAN THE TANGENT AREA NOTE: THE MOLDED PROBE WILL NOT FIT INTO THE
TEE RADIUS IN THE AREA OF LONGERON SHOVEL INSPECTED IN SEQUENCE 2 PROCEDURE. PORTIONS OF THESE AREAS WILL BE
(b) PROGRESSIVELY SCAN ENTIRE LENGTH OF TEE TANGENT AREA BETWEEN LONGERONS L7 AND L17 ON FUSELAGE LEFT AND RIGHT SIDES.
NOTE: ONE TECHNICIAN IS TO OPERATE THE PROBE
WHILE ANOTHER TECHNICIAN EVALUATES THE EDDY CURRENT RESPONSE. THE TECHNICIAN
WATCHING THE DISPLAY SHOULD PERIODICALLY
ERASE LIFT-OFF TRACE TO AVOID MISSING A SMALL CRACK INDICATION.
TECHNICIAN WATCHING DISPLAY MUST BE IN
CONSTANT COMMUNICATION WITH TECHNICIAN
OPERATING PROBE TO MAKE SURE PROBE IS
MAKING GOOD CONTACT WITH TEE SECTION SURFACE.
AFT PRESSURE BULKHEAD TEE - INSPECTION Bulletin A53-232 FIGURE 3 (SHEET 4 OF 17) March 28/90 Page 30 Revision 2 April 28/95 McDonnell Douglas Corporation Proprietary Information. Use or disclosure of THESE DATA SUBJECT TO RESTRICTIVE LEGEND ON TITLE PAGE OR FIRST PAGE.
ALERT DOUGLAS AIRCRAFT COMPANY ALERT
SERVICE BULLETIN SEQUENCE 2:
(1) CALIBRATE EDDY CURRENT EQUIPMENT AS FOLLOWS:
(a) CONNECT 90 DEGREE PROBE TO EDDY CURRENT INSTRUMENT AND SET OPERATING FREQUENCY AT 10 KHZ PER MANUFACTURER'S INSTRUCTIONS.
(b) PLACE 90 DEGREE PROBE ON REFERENCE STANDARD IN AN AREA FREE FROM NOTCH OR EDGE EFFECTS. NULL/BALANCE THE INSTRUMENT AND ADJUST LIFT-OFF PER MANUFACTURER'S INSTRUCTIONS.
(C) SCAN ACROSS REFERENCE STANDARD EDM NOTCH 2 WITH 90 DEGREE PROBE
AND ADJUST SENSITIVITY AND PHASE CONTROLS TO OBTAIN A DISPLAY SIMILAR TO THAT SHOWN ON SHEET 17.
(2) PERFORM EDDY CURRENT INSPECTION OF AFT PRESSURE BULKHEAD TEE AS FOLLOHS:
PLACE 90 DEGREE PROBE ON AFT SIDE OF TEE UPSTANDING LEG IN AN AREA FREE OF FASTENER EFFECTS, SCAN AND RENULL/BALANCE INSTRUMENT.
PROGRESSIVELY SCAN THE EXTENDED AREA OF THE UPSTANDING LEG OF TEE
FROM THE VICINITY OF THE INBOARD ROW OF ATTACHMENTS THROUGH THE
TEE UPSTANDING LEG THEN OUTBOARD TO AND OVERLAPPING THE TANGENT AREA SCANNED IN SEQUENCE 1.
NOTE: SCAN ONLY THOSE AREAS WHERE THE PROBE
WILL FIT EASILY IN THE AREA OF LONGERON SHOVEL CLIPS.
ONE TECHNICIAN IS TO OPERATE THE PROBE
WHILE ANOTHER TECHNICIAN EVALUATES THE EDDY CURRENT RESPONSE. THE TECHNICIAN
WATCHING THE DISPLAY SHOULD PERIODICALLY
ERASE LIFT-OFF TRACE TO AVOID MISSING A SMALL CRACK INDICATION.
TECHNICIAN WATCHING DISPLAY MUST BE IN
CONSTANT COMMUNICATION WITH TECHNICIAN
OPERATING PROBE TO MAKE SURE PROBE IS
MAKING GOOD CONTACT WITH TEE SECTION SURFACE.
RAPID SCANNING OF TEE SURFACE CAN
GENERATE EXCESSIVE NOISE WHICH COULD MASK A SMALL CRACK INDICATION.
(c) ANY INDICATION WHICH EXHIBITS SAME RELATIVE PHASE ANGLE AND AN AMPLITUDE EQUAL TO OR GREATER THAN 50 PERCENT OF THAT OBTAINED FROM REFERENCE STANDARD IS CONSIDERED A CRACK.
(a) RECORD LENGTH AND LOCATION OF EACH CRACK AND DISTANCE BETWEEN MULTIPLE CRACKS. REPORT ALL CRACK INDICATIONS TO DAC AS NOTED IN PARAGRAPH 2.K.
AFT PRESSURE BULKHEAD TEE - INSPECTION March 28/90 FIGURE 3 (SHEET 5 OF 17) Bulletin A53-232 Revision 2 April 28/95 Page 31 McDonnell Douglas Corporation Propriatary Information. Use or disclosure of THESE DATA SUBJECT TO RESTRICTIVE LEGEND ON TITLE PAGE OR FIRST PAGE.
ALERT DOUGLAS AIRCRAFT COMPANY ALERT -
SERVICE BULLETIN
TOLERANCES IN. = INCHES MM = MILLIMETERS ANGLES + 0° 30° 3 PLACE DECIMAL ‡ .015 IN. (0.38 MM) 2 PLACE DECIMAL ‡.03 IN. (0.8 MM)
•625 IN.
(15.88 MM) -
(7.92 MM) •312 IN. (4.75 MM) •187 IN. SIDE VIEW
•562 IN.-
(14.27 MM)
•687 IN.
(17.45 MM)
•812 IN.
(20.62 MM)
•375 IN.
(9.52 MM) ZETEC INCORPORATED C/N 935-0120 P/N APB/MSP
LOW FREQUENCY EDDY CURRENT PROBE OR EQUIVALENT
AFT PRESSURE BULKHEAD TEE - INSPECTION Bulletin A53-232 FIGURE 3 (SHEET 6 OF 17) March 28/90 Page 32 Revision 2 April 28/95 McDonnell Douglas Corporation Proprietary Information. Use or disclosure of THESE DATA SUBJECT TO RESTRICTIVE LEGEND ON TITLE PAGE OR FIRST PAGE.
ALERT DOUGLAS AIRCRAFT COMPANY ALERT -
SERVICE BULLETIN
TOLERANCES IN. = INCHES MM = MILLIMETERS ANGLES + 0° 30' 3 PLACE DECIMAL ‡ .015 IN. (0.38 MM) 2 PLACE DECIMAL ‡ .03 IN. (0.8 MM)
EXCEPT SPECIFIED TOLERANCES SHOWN .203 IN.
RADIUS .062 IN. .187 IN. (5.16 MM) (9.52 MM) .375 IN.
RADIUS .234 IN. -.687 IN.→
(5.94 MM) (17.45 MM)
(15.88 MM) .. • 625 IN.- . 187 IN. (4.75 MM) .843 IN.
(21.41 MM)
REFLECTANCE
COIL PLACEMENT .281 IN.
(7.14 MM) SPO-5222 OR EQUIVALENT
AFT PRESSURE BULKHEAD TEE - INSPECTION March 28/90 FIGURE 3 (SHEET 7 OF 17) Bulletin A53-232 Revision 2 April 28/95 Page 33 McDonnell Douglas Corporation Proprietary Information. Use or disclosure of THESE DATA SUBJECT TO RESTRICTIVE LEGEND ON TITLE PAGE OR FIRST PAGE.
ALERT DoUGLAS AIRCRAFT cOMPANY ALERT
SERVICE BULLETIN
•250 IN.
DIA COIL
•300 IN.
(7.62 MM)
4.00 IN.
(101.6 MM) ZETEC INCORPORATED C/N 910-5830 P/N APB/90DP
LOW FREQUENCY EDDY CURRENT PROBE OR EQUIVALENT
AFT PRESSURE BULKHEAD TEE - INSPECTION Bulletin A53-232 FIGURE 3 (SHEET 8 OF 17) March 28/90 Page 34 Revision 2 April 28/95 McDonnell Douglas Corporation Propriatary Information. Use or disclosure of THESE DATA SUBJECT TO RESTRICTIVE LEGEND ON TITLE PAGE OR FIRST PAGE.
ALERT DOUGLAS AIRCRAFT COMPANY ALERT
SERVICE BULLETIN
FUSELAGE LONGERON NUMBERING VIEW LOOKING
FORWARD AT AFT PRESSURE BULKHEAD TEE 212 00 10 10,13
12. •12 13 - 13 14- -14 15 : 15 16° — 16 1í8- ~ 1817 19 20 2019 *ENDOSCOPE OR FLEXISCOPE ...
INSPECTION SEQUENCE 1
FUSELAGE
CUSP LINE 20- 2221 23 INSPECTION SEQUENCE 2
FUSELAGE .CUSP LINE 23 24 26/28/30|28 26 25 27 29 29 27 24 INSPECTION SEQUENCE 3
VISUAL INSPECTION PROCEDURE A SEQUENCES
FOR AFT PRESSURE BULKHEAD TEE
AFT PRESSURE BULKHEAD TEE - INSPECTION March 28/90 FIGURE 3 (SHEET 9 OF 17) Bulletin A53-232 Revision 2 April 28/95 Page 35 McDonnell Douglas Corporation Propriatary Information. Use or disclosure of THESE DATA SUBJECT TO RESTRICTIVE LEGEND ON TITLE PAGE OR FIRST PAGE.