Copy · 737-27-1318 R02 (1) · 343 pages

© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2020-0686; AD 2020-24-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = 'b31fad71edaac3265d4f5ad9b96063ca5efda07af88fdc672f96063f761be218'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Commercial Airplanes 737 Service Bulletin

SPECIAL ATTENTION Number: 737-27-1318 Original Issue: June 10, 2020 Revision 2: November 10, 2020 ATA System: 2741 SUBJECT: FLIGHT CONTROLS - Horizontal Stabilizer Trim Control System - Wire Bundle Routing Change Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 300-774). An export license may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data has the individual responsibility to abide by all export laws.

9E991ECCN:

Copyright © 2020 Boeing.

Unpublished Work. All Rights Reserved.

Treatment of this document and its content is governed by contract with Boeing. Rights to use this document are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company.

Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.

Original Issue: June 10, 2020 737-27-1318Revision 2: November 10, 2020 1 of 343

4.0

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: June 10, 2020 737-27-1318Revision 2: November 10, 2020 2 of 343 BOEING SERVICE BULLETIN 737-27-1318

BLANK PAGE

Table of Contents

Revision Transmittal Sheet7

Summary13

1. PLANNING INFORMATION17

A. Effectivity17

1. Airplanes17

2. Spares Affected59

B. Concurrent Requirements59

C. Reason89

D. Description89

E. Compliance93

F. Approval93

G. Manpower93

H. Weight and Balance Changes97

I. Electrical Load Data98

J. References98

1. Existing Data:98

2. Data Supplied with this Service Bulletin:98

3. Installation Drawings Used in the Preparation of this Service Bulletin:98

K. Publications Affected99

L. Interchangeability and Intermixability of Parts99

M. Software Accomplishment Summary99

2. MATERIAL INFORMATION101

A. Material - Price and Availability101

B. Industry Support Information102

C. Parts Necessary for Each Airplane102

1. Kits/Parts102

2. Parts and Materials Supplied by the Operator111

3. Parts Modified and Reidentified114

4. Parts Removed and Not Replaced114

D. Parts Necessary to Change Spares114

E. Special Tooling - Price and Availability114

F. Special Tooling Necessary to do this Service Bulletin114

3. ACCOMPLISHMENT INSTRUCTIONS115

A. GENERAL INFORMATION115

B. WORK INSTRUCTIONS117

FIGURE 1: REMOVAL OF THE J4 PANEL128

FIGURE 2: ELECTRICAL AND ELECTRONICS COMPARTMENT AND FORWARD CARGO

COMPARTMENT - W5111 - CHANGE130

FIGURE 3: ELECTRICAL AND ELECTRONICS COMPARTMENT AND FORWARD CARGO

COMPARTMENT - W5119 - CHANGE131

FIGURE 4: ELECTRICAL AND ELECTRONICS COMPARTMENT AND FORWARD CARGO

COMPARTMENT - W5119 - CHANGE [Group 1]132

FIGURE 5: ELECTRICAL AND ELECTRONICS COMPARTMENT AND FORWARD CARGO

COMPARTMENT - W5119 - CHANGE [Group 2-3]145

FIGURE 6: ELECTRICAL AND ELECTRONICS COMPARTMENT AND FORWARD CARGO

COMPARTMENT - W5119 - CHANGE [Group 4]158

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: June 10, 2020 737-27-1318Revision 2: November 10, 2020 3 of 343 BOEING SERVICE BULLETIN 737-27-1318

FIGURE 7: ELECTRICAL AND ELECTRONICS COMPARTMENT AND FORWARD CARGO

COMPARTMENT - W5119 - CHANGE [Group 5-9]170

FIGURE 8: ELECTRICAL AND ELECTRONICS COMPARTMENT - W5711 - CHANGE [Group 1, 3-4, 6, 8]

.183

FIGURE 9: ELECTRICAL AND ELECTRONICS COMPARTMENT - W5711 - CHANGE [Group 1] . . 184 FIGURE 10: ELECTRICAL AND ELECTRONICS COMPARTMENT - W5711 - CHANGE [Group 3] . . 191 FIGURE 11: ELECTRICAL AND ELECTRONICS COMPARTMENT - W5711 - CHANGE [Group 4] . . 198 FIGURE 12: ELECTRICAL AND ELECTRONICS COMPARTMENT - W5711 - CHANGE [Group 6, 8] . 204 FIGURE 13: ELECTRICAL AND ELECTRONICS COMPARTMENT - W5711 - CHANGE [Group 2, 5, 7, 9]

.210

FIGURE 14: ELECTRICAL AND ELECTRONICS COMPARTMENT - W5711 - CHANGE [Group 2] . . 212 FIGURE 15: ELECTRICAL AND ELECTRONICS COMPARTMENT - W5711 - CHANGE [Group 5, 7, 9] .217 FIGURE 16: ELECTRICAL AND ELECTRONICS COMPARTMENT AND J4 PANEL - W6222 - CHANGE

[Group 1-3]223

FIGURE 17: ELECTRICAL AND ELECTRONICS COMPARTMENT AND J4 PANEL - W6224 - CHANGE

[Group 1-3]224

FIGURE 18: ELECTRICAL AND ELECTRONICS COMPARTMENT AND J4 PANEL - W6224 - CHANGE

[Group 1]226

FIGURE 19: ELECTRICAL AND ELECTRONICS COMPARTMENT AND J4 PANEL - W6224 - CHANGE

[Group 2-3]234

FIGURE 20: J4 PANEL - W0094 - CHANGE243

FIGURE 21: J4 PANEL - W0092 - CHANGE [Group 1-3]244

FIGURE 22: J4 PANEL - W0092 - CHANGE [Group 1-3]246

FIGURE 23: E1-1 SHELF - W0111 - CHANGE250

FIGURE 24: E1-1 SHELF - W0113 - CHANGE251

FIGURE 25: E1-1 SHELF - W0113 - CHANGE253

FIGURE 26: E1-4 SHELF - W0141 - CHANGE [Group 1, 3-4, 6, 8]258

FIGURE 27: E1-4 SHELF - W0149 - CHANGE [Group 1, 3-4, 6, 8]259

FIGURE 28: E1-4 SHELF - W0149 - CHANGE [Group 1, 3-4, 6, 8]261

FIGURE 29: E1-4 SHELF - W0141 - CHANGE [Group 2, 5, 7, 9]265

FIGURE 30: E1-4 SHELF - W0149 - CHANGE [Group 2, 5, 7, 9]266

FIGURE 31: E1-4 SHELF - W0149 - CHANGE [Group 2, 5, 7, 9]268

FIGURE 32: E4-2 SHELF - W5719 - CHANGE [Group 1-3]273

FIGURE 33: J4 PANEL - W0092 - CHANGE [Group 4-9]277

FIGURE 34: J4 PANEL - W0092 - CHANGE [Group 4-9]279

FIGURE 35: SECTION 48 WIRE BUNDLE W4134 AND W4222 CHANGES [Group 1-3]283

FIGURE 36: SECTION 48 WIRE BUNDLE W3391 AND W4222 CHANGES [Group 4-9]289

FIGURE 37: ABOVE NOSE WHEEL WELL - W5373 - CHANGE296

FIGURE 38: INSTALLATION OF THE J4 PANEL306

FIGURE 39: MAIN EQUIPMENT CENTER - WIRE SUPPORT BRACKET CHANGE308

APPENDIX A: ILS MASTER CAUTION FUNCTIONAL TEST311

APPENDIX B: BOEING PART DEMAND INTENT312

APPENDIX C: WIRE INSPECTION AREA NEAR STA 298.7 IN THE RIGHT SIDE OF THE MAIN EQUIPMENT

CENTER [Group 1, 3-4, 6, 8]313

APPENDIX D: PRODUCTION INSTALLATION DRAWINGS FOR THE WIRE INSPECTION AREA NEAR STA

298.7 IN THE RIGHT SIDE OF THE MAIN EQUIPMENT CENTER. [Group 1, 3-4, 6, 8] . 314

APPENDIX E: EXAMPLE OF WIRE ROUTING PLAN FOR WIRE INSPECTION AREA323

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: June 10, 2020 737-27-1318Revision 2: November 10, 2020 4 of 343 BOEING SERVICE BULLETIN 737-27-1318

APPENDIX F: BACS38AD( ) ASSEMBLY TOOLS AND TENSIONS330

APPENDIX G: WIRE INSPECTION AREA NEAR STA 298.7 IN THE LEFT SIDE OF THE MAIN EQUIPMENT

CENTER [Group 2-3, 5-9]332

APPENDIX H: PRODUCTION INSTALLATION DRAWINGS FOR THE WIRE COMPARISON AREA NEAR STA 298.7 IN THE LEFT SIDE OF THE MAIN EQUIPMENT CENTER. [Group 2-3, 5-9] . 334 APPENDIX I: METHOD TO PREPARE WIRE INSULATION TO DECREASE THE OUTER DIAMETER. 343 Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: June 10, 2020 737-27-1318Revision 2: November 10, 2020 5 of 343 BOEING SERVICE BULLETIN 737-27-1318

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: June 10, 2020 737-27-1318Revision 2: November 10, 2020 6 of 343 BOEING SERVICE BULLETIN 737-27-1318

BLANK PAGE

Commercial Airplanes 737 Service Bulletin

SPECIAL ATTENTION Revision Transmittal SheetNumber: 737-27-1318Original Issue: June 10, 2020 Revision 2: November 10, 2020 ATA System: 2741 SUBJECT: FLIGHT CONTROLS - Horizontal Stabilizer Trim Control System - Wire Bundle Routing Change This revision includes all pages of the service bulletin.

COMPLIANCE INFORMATION RELATED TO THIS REVISION Federal Aviation Administration (FAA) Notice of Proposed Rule Making NPRM 2019-NM-035-AD, is related to this service bulletin.

MOM-MOM-20-0608-01B(R3) provides a list of Installation Deviation Records (IDRs) that have been issued to airplanes in the 737 MAX fleet for Revision 1 of this service bulletin. Airplanes that have incorporated Revision 1 of this bulletin, including the IDR items listed below applicable by service bulletin group and airplane configuration, have incorporated the intent of Revision 2 and no further work is required.

Airplanes may have additional IDRs than what is listed below to address airplane or customer specific issues.

All IDRs have FAA approval and do not require additional regulatory approvals.

Service Bulletin Group/Configuration DescriptionIDR Item No. (Reference MOM- MOM-20-0608-01B(R3)) 1Figure 18 - The bundle support and routing shown in Figure 18, View A references detail View J and detail View K, which are enhanced for wire routing clarification. The Figure 18, View J and Figure 18, View K bundle support and routing shown in Figure 18 (Sheet 4 of 8) are improperly labelled (swapped).

1 1Figure 4 - Wire bundle W5119 routing error, wire W5119 should be routed under wire W5719. The service bulletin depicts wire W5119 going over wire W5719.

4 2, 5, 7, 9Figure 31, Step 2 - No reference/traceability to note (b) for additional instructions on the expandable sleeving installation.

8 Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: June 10, 2020 737-27-1318Revision 2: November 10, 2020 7 of 343

Service Bulletin Group/Configuration DescriptionIDR Item No. (Reference MOM- MOM-20-0608-01B(R3)) All GroupsFigure 37 - Steps 10, 11, & 12 are missing the size callout for fastener P/N BACS12GU3K*.

9 All GroupsFigures 35 & 36 - Step 15 allows use of plastic tie straps in an unpressurized area, this is not allowed per SWPM (only lacing tape is allowable in the unpressurized area).

13 All GroupsFigure 35 & 36 - Note (b) reference to SWPM 20-63-00 is incorrect, correct reference is SWPM 20-60-06.

19 All airplanes that have partial GLS provisions.

Appendix A, Step 4 - On aircraft equipped with "Partial GLS Provisions", the GLS and ILS lights are not enabled. For these aircraft, this step should ensure only the GPS lights on the IRS Mode Selector Unit (MSU) located on the P5 aft overhead panel are illuminated.

20 1, 3, 4, 6, 8Figures 9, 10, 11 & 12 - EWIS Concern - While performing wire routing changes in the E/E Bay for wire bundle W5711, it was noticed that the baseline wire bundle configuration did not match the expected routing in a specific area where bundle W5711 was to be routed.

Baseline bundles were expected to be routed with 0.25 inches of spacing between clamp locations. Routing of bundle W5711 cannot be completed per service bulletin intent until the area is brought to configuration per the intent of PI drawing 288A4121 and SWPM 20-10-11.

21 All GroupsPart 8 - The Cabin Pressure Controller (CPC) 2 is re-installed per Part 4; however, the CPC 2 installation test is not called out in Part 8 (Restoration and Test). This test was omitted in error.

22 Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: June 10, 2020 737-27-1318Revision 2: November 10, 2020 8 of 343 BOEING SERVICE BULLETIN 737-27-1318

Service Bulletin Group/Configuration DescriptionIDR Item No. (Reference MOM- MOM-20-0608-01B(R3)) 2, 5, 7, 9Figures 14 & 15 - Sleeving in the area from View L (Figure 14) or View H (Figure 15) extending to connector D40496J is not included in the installation steps. This sleeving exists on the original baseline bundle configuration.

23 1, 2, 3Figure 21 - Flag Note 10 is not required. This termination does not require the buildup of insulation for oversize contact to make a proper seal between the insulation of the wire and the grommet of the connector. Therefore, heat shrinkable wire insulation is not required for the wires W0092 installed on the MTCPQKT1R2SFBB receptacle.

24 All GroupsPart 4, Step 1 - E/E Compartment and J4 Panel Restoration - Lack of minimum required clearance (0.25 in.) between wire bundle W0141 and a bracket assembly behind the E1- 4 shelf. This condition may result in interference between wire bundle W0141 and the aft edge of the P/N 287A4132-77 bracket assembly.

Wire damage may occur if not corrected via re-positioning the bracket assembly.

25 2, 3, 5, 6, 7, 8, 9Figures 5 & 7 - EWIS Concern - While performing wire routing changes in the E/E Bay for wire bundle W5119, it was noticed that the baseline wire bundle configuration did not match the expected routing in a specific area where wire bundle W5119 was to be routed. In some cases, wires were incorrectly bundled together. In other cases, the bundles were routed incorrectly.

Rework of wire bundle W5119 may be required to achieve the 0.25 in.

minimum separation requirement and to comply with Boeing Production Installation drawing 288A4161.

28 Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: June 10, 2020 737-27-1318Revision 2: November 10, 2020 9 of 343 BOEING SERVICE BULLETIN 737-27-1318

Service Bulletin Group/Configuration DescriptionIDR Item No. (Reference MOM- MOM-20-0608-01B(R3)) 1, 4, 6, 8Figure 4, 6, 11 & 12 - LH Side of E1- 1 Rack Arm and Control separations

- If wire bundles W5119 and W5711 are not routed together, it is possible that 0.25 inch separation is not maintained between arm and control wires.

REASON FOR REVISION This revision is sent to incorporate the results of successfully completed incorporation of this service bulletin.

The Material Information section has been updated to provide additional parts necessary to complete this service bulletin. The work instructions, illustrations, and step tables have been updated.

The data given in Information Notice 737-27-1318 IN 01 is included in this revision.

These sections were changed:

1. Summary, Background, added Multi Operator Message (MOM) references, changed AD Related to 'Yes'.

2. Paragraph 1.A. Effectivity, updated SB reference.

3. Paragraph 1.B. Concurrent Requirements, updated SB reference.

4. Paragraph 1.C., Reason, added MOM references and added revision information.

5. Paragraph 1.D., Description, added revision information and IDR references.

6. Paragraph 1.E., Compliance, added NPRM reference.

7. Paragraph 1.F., Approval, updated.

8. Paragraph 1.J. References, updated.

9. Paragraph 2.C.2, Parts and Materials Supplied by the Operator, added additional parts.

10. Paragraph 3.B. Work Instructions, updated access instructions, updated LRU references, added new inspection, and added test procedures.

11. Figure 4, updated illustration.

12. Figures 4, 5, 6, 7, 9, 10, 11, 12, and 37, added optional sleeve part number and updated reference.

13. Figures 4, 5, 6, 7, 9, 10, 11, 12, 14, 15, 18, 19, 22, 25, 28, 31, 32, 34, and 37, added option to use BACS18BF1 spacers in place of CR4H connectors rings.

14. Figure 5, updated illustration.

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: June 10, 2020 737-27-1318Revision 2: November 10, 2020 10 of 343 BOEING SERVICE BULLETIN 737-27-1318

15. Figure 6, updated illustration and revised flag note.

16. Figure 7, updated illustration.

17. Figure 9, updated illustration.

18. Figures 9, 10, and 12, updated step numbers.

19. Figure 10, updated illustration.

20. Figure 11, updated illustration and revised flag note.

21. Figure 12, updated illustration and revised flag note.

22. Figure 14, updated illustration.

23. Figure 15, updated illustration.

24. Figure 16, updated illustration and step table.

25. Figure 18, updated illustration and step table.

26. Figure 19, updated step table.

27. Figures 23, 26, and 29, added optional sleeve part number.

28. Figure 21, updated illustration and step table.

29. Figure 22, updated illustration.

30. Figures 24, 27, and 30, updated illustration, added footnotes, and Flag Note table.

31. Figure 25, updated illustration.

32. Figure 28, updated illustration.

33. Figure 31, updated step table.

34. Figure 32, updated illustration.

35. Figure 34, updated illustration.

36. Figures 35 and 36, updated step table.

37. Figure 37, updated step table.

38. Appendix A, updated.

39. Appendix C, D, E, F, G, H and I, added.

Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity and format changes, to show the location of all content changes.

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: June 10, 2020 737-27-1318Revision 2: November 10, 2020 11 of 343 BOEING SERVICE BULLETIN 737-27-1318

Pages with no vertical lines have no changes.

REVISION HISTORY June 10, 2020Original Issue:

June 24, 2020Revision 1:

November 10, 2020Revision 2:

Export Controlled ECCN: 9E991 Copyright © Unpublished Work - See page 1 for details.

Original Issue: June 10, 2020 737-27-1318Revision 2: November 10, 2020 12 of 343 BOEING SERVICE BULLETIN 737-27-1318

Pages 13–24 of 343