Copy · SB 737-53-1246 R1 - BOEING · 407 pages

© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2018-1004; AD 2019-10-03 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '2da8152477c208034c2c381b4b54b751dd293cb7e93f46255addd67a64e60b07'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Commercial Airplanes 737 Service Bulletin

SPECIAL ATTENTION Number: 737-53-1246 Original Issue: January 03, 2007 Revision 1: May 30, 2018 ATA System: 5311 SUBJECT: FUSELAGE - Frames and Bulkheads - Body Station 685 Frame Lower Fitting Inspection, Repair and Preventive Modification Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 300-774). An export license may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data has the individual responsibility to abide by all export laws.

9E991ECCN:

BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET Copyright © 2007 Boeing.

Unpublished Work. All Rights Reserved.

Treatment of this document and its content is governed by contract with Boeing. Rights to use this document are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company.

Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.

Original Issue: January 03, 2007 737-53-1246Revision 1: May 30, 2018 1 of 407

3.0

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: January 03, 2007 737-53-1246Revision 1: May 30, 2018 2 of 407 BOEING SERVICE BULLETIN 737-53-1246

BLANK PAGE

Table of Contents

Revision Transmittal Sheet7

S u m m a r y ..................................................... 1 1

1. PLANNING INFORMATION ........................................ 1 7 A . E f f e c t i v i t y ............................................... 1 7

1. Airplanes ............................................ 1 7 2 . S p a r e s A f f e c t e d ........................................ 3 2 B. Concurrent Requirements ...................................... 3 2 C. Reason ................................................ 3 2 D. Description .............................................. 3 3 E. Compliance .............................................. 3 6 F . A p p r o v a l ............................................... 8 8 G. Manpower .............................................. 8 9 H. Weight and Balance Changes .................................... 9 3 I. Electrical Load Data ......................................... 9 3 J . R e f e r e n c e s .............................................. 9 3

1. Existing Data: ......................................... 9 3

2. Data Supplied with this Service Bulletin: ........................... 9 4

3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 9 4 K. Publications Affected ........................................ 9 4 L. Interchangeability and Intermixability of Parts ........................... 9 5 M. Software Accomplishment Summary ................................ 9 5

2. MATERIAL INFORMATION ........................................ 9 7 A. Material - Price and Availability ................................... 9 7 B. Industry Support Information .................................... 9 7 C. Parts Necessary for Each Airplane ................................. 9 7 1 . K i t s / P a r t s : ........................................... 9 7

2. Parts and Materials Supplied by the Operator: ........................ 9 9

3. Parts Modified and Reidentified: ............................... 1 0 0

4. Parts Removed and Not Replaced: ............................. 1 0 0 D. Parts Necessary to Change Spares ................................ 1 0 0 E. Special Tooling - Price and Availability .............................. 1 0 0 F. Special Tooling Necessary to do this Service Bulletin ...................... 1 0 1

3. ACCOMPLISHMENT INSTRUCTIONS ................................. 1 0 3 A. GENERAL INFORMATION .................................... 1 0 3 B. WORK INSTRUCTIONS ...................................... 1 0 5 FIGURE 1: RECORD THE EXISTING SHIM CONFIGURATION IN THE LEFT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 [Group 1-6] ........................... 1 4 0 FIGURE 2: REMOVAL OF FORWARD/AFT BUSHINGS IN THE LEFT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 [Group 1-6] ................................ 1 4 3 FIGURE 3: DETAILED INSPECTION FOR CORROSION IN THE LEFT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 WITH BUSHINGS REMOVED [Group 1-6] ............... 1 4 6 FIGURE 4: PREPARATION OF THE OUTER BUSHING FOR THE PREVENTIVE MODIFICATION OF THE LEFT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 [Group 2-3, 6] ........ 1 4 8 FIGURE 5: PREPARATION OF THE OUTER BUSHING FOR THE PREVENTIVE MODIFICATION OF THE LEFT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 [Group 4-5] ......... 1 5 1 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: January 03, 2007 737-53-1246Revision 1: May 30, 2018 3 of 407 BOEING SERVICE BULLETIN 737-53-1246

FIGURE 6: INSTALLATION OF THE OUTER BUSHING AND PREPARATION OF THE INNER BUSHING

FOR THE PREVENTIVE MODIFICATION OF THE LEFT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 [Group 2-3, 6] ............................... 1 5 4 FIGURE 7: INSTALLATION OF THE OUTER BUSHING AND PREPARATION OF THE INNER BUSHING

FOR THE PREVENTIVE MODIFICATION OF THE LEFT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 [Group 4-5] ................................ 1 5 7 FIGURE 8: INSTALLATION OF THE INNER BUSHING FOR THE PREVENTIVE MODIFICATION OF THE LEFT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 [Group 2-3, 6] ........ 1 6 0 FIGURE 9: INSTALLATION OF THE INNER BUSHING FOR THE PREVENTIVE MODIFICATION OF THE LEFT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 [Group 4-5] ......... 1 6 4 FIGURE 10: REMOVAL OF CORROSION DAMAGE FROM LEFT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 [Group 1-6] .................................... 1 6 8 FIGURE 11: PREPARATION OF THE LEFT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 FOR THE REPAIR BUSHING INSTALLATION [Group 2-3, 6] ..................... 1 7 5 FIGURE 12: PREPARATION OF THE LEFT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 FOR THE REPAIR BUSHING INSTALLATION [Group 4-5] ...................... 1 7 9 FIGURE 13: INSTALLATION OF THE OUTER BUSHING AND PREPARATION OF THE INNER BUSHING FOR THE REPAIR OF THE LEFT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 [Group 2 - 3 , 6 ] ............................................. 1 8 3 FIGURE 14: INSTALLATION OF THE OUTER BUSHING AND PREPARATION OF THE INNER BUSHING FOR THE REPAIR OF THE LEFT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 [Group 4 - 5 ] ............................................... 1 8 7 FIGURE 15: INNER BUSHING INSTALLATION FOR THE REPAIR OF THE LEFT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 [Group 2-3, 6] .......................... 1 9 1 FIGURE 16: INNER BUSHING INSTALLATION FOR THE REPAIR OF THE LEFT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 [Group 4-5] ........................... 1 9 6 FIGURE 17: RECORD THE EXISTING SHIM CONFIGURATION IN THE RIGHT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 [Group 1-6] ........................... 2 0 1 FIGURE 18: REMOVAL OF FORWARD/AFT BUSHINGS IN THE RIGHT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 [Group 1-6] ................................ 2 0 4 FIGURE 19: DETAILED INSPECTION FOR CORROSION IN THE RIGHT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 WITH BUSHINGS REMOVED [Group 1-6] ............... 2 0 7 FIGURE 20: PREPARATION OF THE OUTER BUSHING FOR THE PREVENTIVE MODIFICATION OF THE RIGHT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 [Group 2-3, 6] ....... 2 0 9 FIGURE 21: PREPARATION OF THE OUTER BUSHING FOR THE PREVENTIVE MODIFICATION OF THE RIGHT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 [Group 4-5] ......... 2 1 2 FIGURE 22: INSTALLATION OF THE OUTER BUSHING AND PREPARATION OF THE INNER BUSHING

FOR THE PREVENTIVE MODIFICATION OF THE RIGHT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 [Group 2-3, 6] ............................... 2 1 5 FIGURE 23: INSTALLATION OF THE OUTER BUSHING AND PREPARATION OF THE INNER BUSHING

FOR THE PREVENTIVE MODIFICATION OF THE RIGHT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 [Group 4-5] ................................ 2 1 8 FIGURE 24: INSTALLATION OF THE INNER BUSHING FOR THE PREVENTIVE MODIFICATION OF THE RIGHT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 [Group 2-3, 6] ....... 2 2 1 FIGURE 25: INSTALLATION OF THE INNER BUSHING FOR THE PREVENTIVE MODIFICATION OF THE RIGHT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 [Group 4-5] ......... 2 2 5 FIGURE 26: REMOVAL OF CORROSION DAMAGE FROM RIGHT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 [Group 1-6] .................................... 2 2 9 FIGURE 27: PREPARATION OF THE RIGHT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 FOR THE REPAIR BUSHING INSTALLATION [Group 2-3, 6] .................. 2 3 6 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: January 03, 2007 737-53-1246Revision 1: May 30, 2018 4 of 407 BOEING SERVICE BULLETIN 737-53-1246

FIGURE 28: PREPARATION OF THE RIGHT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 FOR THE REPAIR BUSHING INSTALLATION [Group 4-5] ................... 2 4 0 FIGURE 29: INSTALLATION OF THE OUTER BUSHING AND PREPARATION OF THE INNER BUSHING FOR THE REPAIR OF THE RIGHT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 [Group 2 - 3 , 6 ] ............................................. 2 4 4 FIGURE 30: INSTALLATION OF THE OUTER BUSHING AND PREPARATION OF THE INNER BUSHING FOR THE REPAIR OF THE RIGHT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 [Group 4 - 5 ] ............................................... 2 4 8 FIGURE 31: INNER BUSHING INSTALLATION FOR THE REPAIR OF THE RIGHT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 [Group 2-3, 6] .......................... 2 5 2 FIGURE 32: INNER BUSHING INSTALLATION FOR THE REPAIR OF THE RIGHT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 [Group 4-5] ........................... 2 5 7 FIGURE 33: PLUG HOLE IN THE ZERK FITTING ON THE LEFT SIDE-STRUT SUPPORT FITTING LUG AT BS 685 [Group 4-5] .................................... 2 6 2 FIGURE 34: PLUG HOLE IN THE ZERK FITTING ON THE RIGHT SIDE-STRUT SUPPORT FITTING LUG AT BS 685 [Group 4-5] .................................... 2 6 4 FIGURE 35: PREPARATION FOR THE INSTALLATION OF THE NEW OUTER BUSHING ON THE LEFT SIDE-STRUT SUPPORT FITTING AT BS 685 FOR PREVIOUSLY MODIFIED AIRPLANES [Group 2-3, 6] ......................................... 2 6 6 FIGURE 36: PREPARATION FOR THE INSTALLATION OF THE NEW OUTER BUSHING ON THE LEFT SIDE-STRUT SUPPORT FITTING AT BS 685 FOR PREVIOUSLY MODIFIED AIRPLANES [Group 4-5] .......................................... 2 6 9 FIGURE 37: PREPARATION FOR THE INSTALLATION OF THE NEW OUTER BUSHING ON THE LEFT SIDE-STRUT SUPPORT FITTING AT BS 685 FOR PREVIOUSLY REPAIRED AIRPLANES [Group 2-3, 6] ......................................... 2 7 2 FIGURE 38: PREPARATION FOR THE INSTALLATION OF THE NEW OUTER BUSHING ON THE LEFT SIDE-STRUT SUPPORT FITTING AT BS 685 FOR PREVIOUSLY REPAIRED AIRPLANES [Group 4-5] .......................................... 2 7 5 FIGURE 39: PREPARATION FOR THE INSTALLATION OF THE NEW OUTER BUSHING ON THE RIGHT SIDE-STRUT SUPPORT FITTING AT BS 685 FOR PREVIOUSLY MODIFIED AIRPLANES [Group 2-3, 6] ......................................... 2 7 8 FIGURE 40: PREPARATION FOR THE INSTALLATION OF THE NEW OUTER BUSHING ON THE RIGHT SIDE-STRUT SUPPORT FITTING AT BS 685 FOR PREVIOUSLY MODIFIED AIRPLANES [Group 4-5] .......................................... 2 8 1 FIGURE 41: PREPARATION FOR THE INSTALLATION OF THE NEW OUTER BUSHING ON THE RIGHT SIDE-STRUT SUPPORT FITTING AT BS 685 FOR PREVIOUSLY REPAIRED AIRPLANES [Group 2-3, 6] ......................................... 2 8 4 FIGURE 42: PREPARATION FOR THE INSTALLATION OF THE NEW OUTER BUSHING ON THE RIGHT SIDE-STRUT SUPPORT FITTING AT BS 685 FOR PREVIOUSLY REPAIRED AIRPLANES [Group 4-5] .......................................... 2 8 7 FIGURE 43: DETAILED INSPECTION FOR DAMAGE IN THE LEFT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 WITH BUSHINGS INSTALLED [Group 1-6] ............... 2 9 0 FIGURE 44: DETAILED INSPECTION FOR DAMAGE IN THE RIGHT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 WITH BUSHINGS INSTALLED [Group 1-6] ............... 2 9 2 FIGURE 45: REMOVAL OF THE OVERLAPPED BUSHINGS IN THE LEFT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 AFTER PREVIOUS REPAIR OR PREVENTIVE MODIFICATION [Group 1-6] ................................................. 2 9 4 FIGURE 46: REMOVAL OF THE OVERLAPPED BUSHINGS IN THE RIGHT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 AFTER PREVIOUS REPAIR OR PREVENTIVE MODIFICATION [Group 1-6] .......................................... 2 9 7 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: January 03, 2007 737-53-1246Revision 1: May 30, 2018 5 of 407 BOEING SERVICE BULLETIN 737-53-1246

FIGURE 47: HIGH FREQUENCY EDDY CURRENT INSPECTION FOR ANY CRACK IN THE LEFT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 [Group 1-6] ............. 3 0 0 FIGURE 48: HIGH FREQUENCY EDDY CURRENT INSPECTION FOR ANY CRACK IN THE RIGHT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 [Group 1-6] ............. 3 0 2 APPENDIX A: RECORD LUG DIMENSIONS [Group 1-6] ......................... 3 0 4 APPENDIX B: ALLOWABLE LIMITS FOR MINIMUM LUG WALL THICKNESS AGAINST IN BORE LUG T H I C K N E S S .......................................... 3 0 9 APPENDIX C: LUG DIMENSION ....................................... 3 2 1 APPENDIX D: LOGIC DIAGRAM FOR PARAGRAPH 1.E., COMPLIANCE TABLE 1: DETAILED INSPECTION

AND HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTIONS FOR ANY CORROSION,

ANY CRACK OR SEVERED LUG OF THE LEFT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 [Group 1] ....................................... 3 2 8 APPENDIX E: LOGIC DIAGRAM FOR PARAGRAPH 1.E., COMPLIANCE TABLE 2: DETAILED INSPECTION

AND HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTIONS FOR ANY CORROSION,

ANY CRACK OR SEVERED LUG OF THE RIGHT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 [Group 1] ..................................... 3 3 9 APPENDIX F: LOGIC DIAGRAM FOR PARAGRAPH 1.E., COMPLIANCE TABLE 3: DETAILED INSPECTION

AND HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTIONS FOR ANY CORROSION, ANY CRACK OR SEVERED LUG; REPAIR AND PREVENTIVE MODIFICATION OF THE LEFT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 [Group 2-3, 6] ........... 3 5 0 APPENDIX G: LOGIC DIAGRAM FOR PARAGRAPH 1.E., COMPLIANCE TABLE 4: DETAILED INSPECTION

AND HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTIONS FOR ANY CORROSION, ANY CRACK OR SEVERED LUG; REPAIR AND PREVENTIVE MODIFICATION OF THE RIGHT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 [Group 2-3, 6] ....... 3 6 3 APPENDIX H: LOGIC DIAGRAM FOR PARAGRAPH 1.E., COMPLIANCE TABLE 5: DETAILED INSPECTION

AND HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTIONS FOR ANY CORROSION, ANY CRACK OR SEVERED LUG; REPAIR AND PREVENTIVE MODIFICATION OF THE LEFT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 [Group 4-5] ............. 3 7 6 APPENDIX I: LOGIC DIAGRAM FOR PARAGRAPH 1.E., COMPLIANCE TABLE 6: DETAILED INSPECTION

AND HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTIONS FOR ANY CORROSION, ANY CRACK OR SEVERED LUG; REPAIR AND PREVENTIVE MODIFICATION OF THE RIGHT SIDE-STRUT SUPPORT FITTING LUGS AT BS 685 [Group 4-5] ......... 3 8 9 APPENDIX J: LEFT SIDE BUSHING CONFIGURATIONS [Group 1-6] .................. 4 0 2 APPENDIX K: RIGHT SIDE BUSHING CONFIGURATIONS [Group 1-6] ................. 4 0 5 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: January 03, 2007 737-53-1246Revision 1: May 30, 2018 6 of 407 BOEING SERVICE BULLETIN 737-53-1246

Commercial Airplanes 737 Service Bulletin

SPECIAL ATTENTION Revision Transmittal SheetNumber: 737-53-1246Original Issue: January 03, 2007 Revision 1: May 30, 2018 ATA System: 5311 SUBJECT: FUSELAGE - Frames and Bulkheads - Body Station 685 Frame Lower Fitting Inspection, Repair and Preventive Modification This Revision includes all pages of the service bulletin.

COMPLIANCE INFORMATION RELATED TO THIS REVISION The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin mandatory.

Effects of this Revision on airplanes on which the Original Issue was previously done:

None.

REASON FOR REVISION This revision is sent to add a detailed inspection with bushings installed, update the inspection threshold and repeat interval, add additional lug wall thickness information to the existing APPENDIX B, and add lug bore dimensions in the new APPENDIX C. This revision is also sent to include details of a special tool available to machine the lug bores and hone the outer bushings.

New Groups 6 and 7 were added and Group assignments were changed to help operators determine the lug configuration and the allowable limits in APPENDIX B and APPENDIX C. Required for Compliance (RC) tags were added, and the Work Instructions were converted to the Parts-Conditions-Actions format, in support of the planned FAA Airworthiness Directive (AD).

These sections were changed:

1. Subject, changed to agree with work to be done.

2. Summary, Background, added new report, a reference to a second Boeing Service Related Problem, a reference to the Boeing Fleet Team Digest and a planning data table.

3. Summary, Action, new detailed inspection and HFEC inspection information added to Group 1. Group 7 Limit of Validity (LOV) paragraph has been added. Group 2-6 paragraphs have been updated.

4. Summary, Effectivity, paragraph has been updated.

5. Summary, the summary illustration has been updated.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: January 03, 2007 737-53-1246Revision 1: May 30, 2018 7 of 407

6. Paragraph 1.A., Effectivity, Group 1 line numbers have been changed to 292 - 433, Line numbers 1 - 291 have been added to the new Group 7. Paragraph has been updated.

7. Paragraph 1.C., Reason, added new report, a reference to a second Boeing Service Related Problem, a reference to the Boeing Fleet Team Digest and reasons for revision paragraph.

8. Paragraph 1.D., Description, new detailed inspection and HFEC inspection information added to Group

1. Group 7 LOV paragraph has been added. Groups 2-6 Paragraphs have been updated. Maintenance zone tables have been added.

9. Paragraph 1.E., Compliance, Compliance tables 1 and 2 have been updated. Paragraphs have been added.

10. Paragraph 1.F., Approval, Approval section has been updated.

11. Paragraph 1.G., Manpower, manpower tables have been updated.

12. Paragraph 1.J.1., Existing Data, references have been updated.

13. Paragraph 1.J.2., Data Supplied with this Service Bulletin, a special tool drawing was added to Data supplied with this Service Bulletin.

14. Paragraph 1.K.1., Publications Affected, Publications tables have been updated.

15. Paragraph 1.K.2., Publications Affected, Damage Tolerance Based Structural Inspections paragraph added.

16. Paragraph 1.M., Software Accomplishment Summary, Paragraph has been added.

17. Paragraph 2.A., Material - Price and Availability, material table heading was added.

18. Paragraph 2.C.1., Parts Necessary for Each Airplane, kit requirement note has been updated. Group 6 added to the kit applicability table.

19. Paragraph 2.C.2., Parts and Materials Supplied by the Operator, footnotes have been added.

20. Paragraph 2.E., Special Tooling - Price and Availability: A special tool was added.

21. Paragraph 2.F., Special Tooling Necessary to do this Service Bulletin: A special tool was added.

22. Paragraph 3.A., General Information, Notes have been added and updated.

23. Paragraph 3.B., Work Instructions, Work Instructions have been updated, redundant HFEC instructions are removed from PARTS 6, 7, 14 and 15. PART 10, step (c) applicability has been updated. Group 7 LOV paragraph has been added.

24. Figure 1, Steps have been added and existing steps have been updated.

25. Figure 2, Steps have been removed and existing steps have been updated.

26. Figure 3, Step table updated to remove High Frequency Eddy Current inspection and update detailed inspection instructions.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: January 03, 2007 737-53-1246Revision 1: May 30, 2018 8 of 407 BOEING SERVICE BULLETIN 737-53-1246

27. Figures 4, 5, 11, 12, 20, 21, 27 and 28, A special tooling note was added to step 1.

28. Figures 6, 7, 13, 14, 22, 23, 29 and 30, A special tooling note was added to step 3.

29. Figures 8, 9, 15, 16, 24, 25, 31 and 32, A special tooling note was added to step 3.

30. Figures 4, 5, 6, 7, 11, 12, 13, 14, 20, 21, 22, 23, 27, 28, 29 and 30, A new step has been added and existing steps have been updated.

31. Figure 10, Illustration and step table have been updated.

32. Figure 19, Step table updated to remove High Frequency Eddy Current inspection.

33. Figure 26, Illustration and step table have been updated.

34. Figure 35, 36, 39 and 40 added to give new work instructions for preparation for the installation of the new outer bushing for previously modified airplanes.

35. Figure 37, 38, 41 and 42 added to give new work instructions for preparation for the installation of the new outer bushing for previously repaired airplanes.

36. Figure 43 and 44 added to show a new detailed inspection with bushings installed.

37. Figure 45 and 46 added to show removal of overlapped bushings after previous repair or preventive modification.

38. Figure 47 and 48 added to show High Frequency Eddy Current inspection with bushings removed

39. Appendix B has been updated to include additional information.

40. Appendix C added to give lug dimension information.

41. Appendix D through Appendix I added to give logic diagrams.

42. Appendix J through Appendix K added to give Left and Right Bushing Configuration.

Paragraph 1.A., Effectivity, shows changes of airplane operators. Each operator should examine the Effectivity paragraph for changes.

Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location of important changes.

Pages with no vertical lines have no important changes.

REVISION HISTORY January 03, 2007Original Issue:

May 30, 2018Revision 1:

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: January 03, 2007 737-53-1246Revision 1: May 30, 2018 9 of 407 BOEING SERVICE BULLETIN 737-53-1246

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: January 03, 2007 737-53-1246Revision 1: May 30, 2018 10 of 407 BOEING SERVICE BULLETIN 737-53-1246

BLANK PAGE

Commercial Airplanes 737 Service Bulletin

SPECIAL ATTENTION SummaryNumber: 737-53-1246Original Issue: January 03, 2007 Revision 1: May 30, 2018 ATA System: 5311 SUBJECT: FUSELAGE - Frames and Bulkheads - Body Station 685 Frame Lower Fitting Inspection, Repair and Preventive Modification BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS DOCUMENT IMMEDIATELY.

CONCURRENT REQUIREMENTS None.

BACKGROUND Accomplishment of this service bulletin will help to maintain the structural integrity of the lugs on the side-strut support fittings of the main landing gear. The bushings that are installed in this service bulletin will provide better corrosion protection and prevention. The bushings are installed one inside the other, which is referred to as the overlapped bushing configuration. This arrangement will withstand loads much better and reduce the likelihood of cracks and corrosion in the lugs. Failure to follow the instructions outlined in this service bulletin could result in the sudden loss of the side-strut support fitting joint and main landing gear attachment to the airplane, which could result in the collapse of a main landing gear.

One operator found the forward half of the left Body Station (BS) 685 side-strut support fitting lugs cracked from the edge of the bore to the outboard lug edge. The airplane had 72,237 flight hours and 71,299 flight cycles at the time the crack was discovered. Because the fitting has a fail-safe design, the aft half of the two piece fitting was able to handle the loads. The operator replaced the fitting and sent the cracked fitting to Boeing for further investigation. Metallurgical analysis by Boeing revealed that the crack initiated from a small corrosion pit on the spot-face of the lug at the edge of the bore.

Another operator reported a crack in the bore of the forward lug at the split line of the forward and aft lugs at BS

685. The crack was discovered during corrosion damage blend out of the bore. The airplane had 51,329 flight hours and 47,553 flight cycles at the time the crack was discovered. Normal maintenance and the inspection program for line number 1-291 airplanes in Group 1 of the Original Issue did not provide two opportunities to detect the crack before it reached a critical condition, which could have resulted in a main landing gear collapse.

In addition, corrosion has been found in the lug bore of the side-strut support fitting. Typically the damage is in the middle of the lug bore, at the split line between the two halves of the fitting, concurrent with the gap between the two journal bushings. Boeing has also received reports of corrosion in the spot face of the lug, underneath the flange of the bushings.

Boeing Service Related Problems (SRP) 737-SRP-53-0167 and 737-SRP-53-0511 are related to this service bulletin.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: January 03, 2007 737-53-1246Revision 1: May 30, 2018 11 of 407

Boeing Fleet Team Digest (FTD) 737-FTD-53-03002 is related to this service bulletin.

This table is provided to operators for planning purposes only. Refer to the applicable sections for more information.

ReferenceAffectedPlanning Data Paragraph 1.A.2., Spares AffectedNoSpares Affected Paragraph 1.E., Compliance and Paragraph

1.F., Approval YesAD Related Paragraph 1.H., Weight and Balance ChangesNoWeight and Balance Change Paragraph 1.I., Electrical Load DataNoElectrical Load Changed Paragraph 1.K., Publications AffectedYesPublications Affected Paragraph 1.K., Publications AffectedNoAirplane Flight Operations Affected (Flight Crew Operations Manual and/or FAA Approved Airplane Flight Manual) Paragraph 2.C.1., Kits/PartsYesKits/Parts Required Paragraph 2.C.2., Parts and Materials Supplied by the Operator YesOperator Supplied Parts/Material Paragraph 2.F., Special Tooling Necessary to do this Service Bulletin YesSpecial Tooling Required ACTION (PRR 35005-257RS)

1. Group 1-6:

On the left and right sides, do a detailed inspection of the forward and aft lugs at Body Station (BS) 685 with bushings installed for any corrosion, any crack, or severed lug.

a. If no corrosion or crack or severed lug is found, repeat the detailed inspection of the forward and aft lugs at BS 685 with bushings installed until the detailed and high frequency eddy current (HFEC) inspections of the forward and aft lugs at BS 685 with bushings removed have been accomplished.

NOTE: Detailed inspections of the forward and aft lugs at BS 685 with bushings installed are terminated when the detailed and HFEC inspections of the forward and aft lugs at BS 685 with bushings removed are accomplished.

b. If any corrosion is found on the forward or aft lugs at BS 685 with bushings installed, do a detailed inspection of the forward and aft lugs at BS 685 with bushings removed for any corrosion.

(1) If any corrosion is found on the forward or aft lugs at BS 685 with bushings removed, remove the corrosion, do HFEC inspections of the forward and aft lugs at BS 685 for any crack, and contact The Boeing Company for repair instructions and do the repair.

(2) If no corrosion is found on the forward or aft lugs at BS 685 with bushings removed, do HFEC inspections of the forward and aft lugs at BS 685 for any crack, and contact The Boeing Company for repair instructions and do the repair.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: January 03, 2007 737-53-1246Revision 1: May 30, 2018 12 of 407 BOEING SERVICE BULLETIN 737-53-1246

Pages 13–24 of 407