Copy · Boeing - Service Bulletin · 206 pages

© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2011-1065; AD 2012-17-12 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '2581715412bf5fc9819e6c93776db9fa7a476e9e43e20abf14741b999cfdfb2a'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Commercial Airplanes 747 Service Bulletin

SPECIAL ATTENTION Number: 747-25-3586 Original Issue: November 12, 2010 ATA System: 2550 2521 5141 5321 SUBJECT: EQUIPMENT/FURNISHINGS - Cargo Compartments - Forward Main Deck Drain and Floor Panel Seal Installation Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 730-774). An export license may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data has the individual responsibility to abide by all export laws.

9E991ECCN:

BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET Copyright © 2010 The Boeing Company Unpublished Work - All Rights Reserved Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.

This document includes proprietary information owned by The Boeing Company and/or one or more third parties.

Treatment of the document and the information it contains is governed by contract with Boeing. For more information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.

Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and the Boeing livery are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 12, 2010 747-25-3586 1 of 206

2.0

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 12, 2010 747-25-3586 2 of 206 BOEING SERVICE BULLETIN 747-25-3586

BLANK PAGE

Table of Contents

Summary5

1. PLANNING INFORMATION9

A. Effectivity9

1. Airplanes9

2. Spares Affected ........................................ 1 0 B. Concurrent Requirements ...................................... 1 0 C. Reason ................................................ 1 1 D. Description .............................................. 1 1 E. Compliance .............................................. 1 2 F. Approval ............................................... 1 2 G. Manpower .............................................. 1 2 H. Weight and Balance Changes .................................... 1 3 I. Electrical Load Data ......................................... 1 3 J. References .............................................. 1 4

1. Existing Data .......................................... 1 4

2. Data supplied with this Service Bulletin ............................ 1 4

3. Installation Drawings Used in the Preparation of this Service Bulletin ............ 1 4 K. Publications Affected ........................................ 1 5 L. Interchangeability and Intermixability of Parts ........................... 1 5

2. MATERIAL INFORMATION ........................................ 1 7 A. Material - Price and Availability ................................... 1 7 B. Industry Support Information .................................... 1 7 C. Parts Necessary For Each Airplane ................................. 1 7

1. Kits/Parts ............................................ 1 7

2. Parts and Materials Supplied by the Operator ........................ 2 2

3. Parts Modified and Reidentified ................................ 2 3

4. Parts Removed and Not Replaced .............................. 2 4 D. Parts Necessary to Change Spares ................................. 2 4 E. Special Tooling - Price and Availability ............................... 2 4 F. Special Tooling Necessary to do this Service Bulletin ....................... 2 4

3. ACCOMPLISHMENT INSTRUCTIONS .................................. 2 5 A. GENERAL INFORMATION ..................................... 2 5 B. WORK INSTRUCTIONS ....................................... 2 6 FIGURE 1: STATION 206 MOP SILL REMOVAL ............................. 2 8 FIGURE 2: SHORT RACEWAY REMOVAL [Group 1, 3, 5] ........................ 3 0 FIGURE 3: LEFT HAND LONG RACEWAY REMOVAL [Group 2, 4] ................... 3 5 FIGURE 4: RIGHT HAND LONG RACEWAY REMOVAL [Group 2, 4] .................. 4 0 FIGURE 5: STATION 210 FLOOR PANEL MODIFICATION ....................... 4 4 FIGURE 6: STATION 210 DRAIN REMOVAL ............................... 5 2 FIGURE 7: STATION 210 FLOOR SUPPORT INSTALLATION ..................... 5 5 FIGURE 8: STATION 210 FLOOR DRAIN TROUGH DOUBLER INSTALLATION ........... 6 5 FIGURE 9: STATION 210 FLOOR DRAIN TROUGH INSTALLATION .................. 7 4 FIGURE 10: STATION 210 DRAIN INSTALLATION ............................ 8 5 FIGURE 11: STATION 530 FLOOR PANEL MODIFICATION ....................... 9 2 FIGURE 12: STATION 530 DRAIN REMOVAL .............................. 1 0 3

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 12, 2010 747-25-3586 3 of 206 BOEING SERVICE BULLETIN 747-25-3586

FIGURE 13: STATION 530 FLOOR SUPPORT INSTALLATION ..................... 1 0 6 FIGURE 14: STATION 530 FLOOR DRAIN TROUGH DOUBLER INSTALLATION ........... 1 2 0 FIGURE 15: STATION 530 FLOOR DRAIN TROUGH INSTALLATION ................. 1 3 4 FIGURE 16: STATION 530 DRAIN INSTALLATION ........................... 1 4 8 FIGURE 17: FLOOR PANEL INSTALLATION ............................... 1 6 3 FIGURE 18: FLOOR PANEL SEALANT INSTALLATION ......................... 1 6 7 FIGURE 19: SHORT RACEWAY INSTALLATION [Group 1, 3, 5] .................... 1 7 3 FIGURE 20: LEFT HAND LONG RACEWAY INSTALLATION [Group 2, 4] ............... 1 7 8 FIGURE 21: RIGHT HAND LONG RACEWAY INSTALLATION [Group 2, 4] .............. 1 8 5 FIGURE 22: STATION 206 MOP SILL INSTALLATION .......................... 1 9 1 FIGURE 23: FLOOR PANEL TAPE INSTALLATION ........................... 1 9 5 FIGURE 24: IATA STANDARD MARKING INSTALLATION [Group 1-2] ................. 2 0 1 FIGURE 25: BOEING STANDARD MARKING INSTALLATION [Group 3-4] ............... 2 0 3 FIGURE 26: CUSTOMER MARKING INSTALLATION [Group 5] ..................... 2 0 5

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 12, 2010 747-25-3586 4 of 206 BOEING SERVICE BULLETIN 747-25-3586

Commercial Airplanes 747 Service Bulletin

SPECIAL ATTENTION SummaryNumber: 747-25-3586Original Issue: November 12, 2010 ATA System: 2550 2521 5141 5321 SUBJECT: EQUIPMENT/FURNISHINGS - Cargo Compartments - Forward Main Deck Drain and Floor Panel Seal Installation BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS SERVICE BULLETIN IMMEDIATELY.

CONCURRENT REQUIREMENTS None.

BACKGROUND Operators of 747-400 Boeing Converted Freighters (BCF) airplanes reported water leaked into electrical and electronic equipment in the main equipment center. The water leaked through the main deck floor panels, fasteners and floor fittings. The sources of the water include rain and snow coming through the main deck doors and wet cargo. Water in the electrical and electronic equipment could result in an electrical short and potential loss of several functions essential for safe flight This service bulletin seals the floor panels to make sure no water leaks at the seams, fasteners and floor fittings into the main equipment center. Drains and drain channels are also installed in the forward main cargo deck floor to remove the water from the area.

Boeing Service Related Problem (SRP) 747-SRP-25-0283 is related to this service bulletin.

As a part of a service bulletin remote certification program, this change was completed on airplane RT461 by Service Bulletin 747-25-3586 Remote Certification Copy 1 before the initial release of this service bulletin. The change completed on airplane RT461 by Service Bulletin 747-25-3586 Remote Certification Copy 1 is equivalent to the initial release of this service bulletin. Airplane RT461 has the configuration of a Group 1 airplane.

ACTION (PRR F04000-1RS) Station 210 – Remove and rework floor panels – Remove drains – Install new floor supports – Install new drain channels – Install new drains Station 530

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 12, 2010 747-25-3586 5 of 206

– Remove and rework floor panels – Remove drains – Install new floor supports – Install new drain channels – Install new drains Sealing – Install floor panels – Install sealant and tape

EFFECTIVITY 747-400 Airplanes. Refer to Paragraph 1.A.1., Airplanes, for the list of affected airplanes.

COMPLIANCE The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin mandatory.

Boeing recommends that the change given in this service bulletin be done within 24 months after the original issue date of this service bulletin.

INDUSTRY SUPPORT INFORMATION Boeing warranty remedies are available for airplanes in warranty as of December 10, 2008. Please refer to Paragraph 2.B., Industry Support Information.

MANPOWER Elapsed HoursTotal Task HoursAirplanes

135.75639.75Groups 1, 3 and 5

141.25643.75Groups 2 and 4

MATERIAL INFORMATION Boeing Supplied Kits/Parts.

Refer to Paragraph 2.A., Material - Price and Availability.

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 12, 2010 747-25-3586 6 of 206 BOEING SERVICE BULLETIN 747-25-3586

Page 7OCROpen in PDF

BOEING SERVICE BULLETIN 747-25-3586 STATION 210 AND 530:

-REWORK FLOOR PANELS -REMOVE HOSE AND DRAINS -INSTALL FLOOR SUPPORTS,

DRAIN TROUGHS

AND NEW DRAINS 'STA 140 STA STATION 140-640: 205 -SEAL FLOOR PANELS STATION 205-640:

-TAPE FLOOR PANELS ~ STA 1923142 640 Original Issue: November 12, 2010 BOEING PROPRIETARY - 747-25-3586 Copyright © Unpublished Work - See page 1 for details. / 01 206

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 12, 2010 747-25-3586 8 of 206 BOEING SERVICE BULLETIN 747-25-3586

BLANK PAGE

Commercial Airplanes 747 Service Bulletin

SPECIAL ATTENTION Number: 747-25-3586 Original Issue: November 12, 2010 ATA System: 2550 2521 5141 5321 SUBJECT: EQUIPMENT/FURNISHINGS - Cargo Compartments - Forward Main Deck Drain and Floor Panel Seal Installation BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS SERVICE BULLETIN IMMEDIATELY.

1. PLANNING INFORMATION A. Effectivity

1. Airplanes This service bulletin is for the airplanes shown below. An equivalent change is on subsequent production airplanes. Refer to PRR F04000-1RS for data about this change.

Refer to Service Bulletin Index Document D6-30300 Part 3 for Airplane Variable Number, Line Number, and Serial Number data.

DESCRIPTIONCONFIGURATIONGROUP 747-400 Airplanes modified to 747-400 Boeing Converted Freighters (BCF) with IATA standard markings and short raceways -1 747-400 Airplanes modified to 747-400 Boeing Converted Freighters (BCF) with IATA standard markings and long raceways -2 747-400 Airplanes modified to 747-400 Boeing Converted Freighters (BCF) with Boeing standard markings and short raceways -3 747-400 Airplanes modified to 747-400 Boeing Converted Freighters (BCF) with Boeing standard markings and long raceways -4 747-400 Airplanes modified to 747-400 Boeing Converted Freighters (BCF) with customer markings and short raceways -5 Airplane Models:

747-400

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 12, 2010 747-25-3586 9 of 206

GroupVariable Number 5RM128 1RT021 - RT022 1RT031 - RT033 4RT061 1RT071 - RT072 1RT075 3RT161 3RT164 1RT456 1RT461 1RT501 1RT506 - RT510 1RT513 1RT516 1RT518 - RT520 1RT524 4RT526 1RT528 4RT530 3RT572 - RT577 4RT578 - RT579 2RT642 5RT655 - RT657 1RT751 - RT752 1RT781 - RT782 2RT837 5RT967

2. Spares Affected None.

B. Concurrent Requirements None.

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 12, 2010 747-25-3586 10 of 206 BOEING SERVICE BULLETIN 747-25-3586

C. Reason Operators of 747-400 Boeing Converted Freighters (BCF) airplanes reported water leaked into electrical and electronic equipment in the main equipment center. The water leaked through the main deck floor panels, fasteners and floor fittings. The sources of the water include rain and snow coming through the main deck doors and wet cargo. Water in the electrical and electronic equipment could result in an electrical short and potential loss of several functions essential for safe flight This service bulletin seals the floor panels to make sure no water leaks at the seams, fasteners and floor fittings into the main equipment center. Drains and drain channels are also installed in the forward main cargo deck floor to remove the water from the area.

Boeing Service Related Problem (SRP) 747-SRP-25-0283 is related to this service bulletin.

As a part of a service bulletin remote certification program, this change was completed on airplane RT461 by Service Bulletin 747-25-3586 Remote Certification Copy 1 before the initial release of this service bulletin. The change completed on airplane RT461 by Service Bulletin 747-25-3586 Remote Certification Copy 1 is equivalent to the initial release of this service bulletin. Airplane RT461 has the configuration of a Group 1 airplane.

D. Description Station 210 – Remove and rework floor panels – Remove drains – Install new floor supports – Install new drain channels – Install new drains Station 530 – Remove and rework floor panels – Remove drains – Install new floor supports – Install new drain channels – Install new drains Sealing – Install floor panels – Install sealant and tape The work in this service bulletin is done in the maintenance zone(s) given below.

Affected Maintenance Zones ZoneModel 112, 121, 122, 211, 212, 231, 232747-400

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 12, 2010 747-25-3586 11 of 206 BOEING SERVICE BULLETIN 747-25-3586

E. Compliance The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin mandatory.

Boeing recommends that the change given in this service bulletin be done within 24 months after the original issue date of this service bulletin.

F. Approval This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified in this service bulletin comply with the applicable regulations and are FAA approved. This service bulletin and its approval were based on the airplane in its original Boeing delivery configuration or as modified by other approved Boeing changes.

If an airplane has a non-Boeing modification or repair that affects a component or system also affected by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval before incorporating this service bulletin.

G. Manpower The table below shows an estimate of the task hours necessary to do this change for each airplane.

This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator task hour data if necessary. The estimate does not include lost time. These are some examples of lost time:

 Time to adjust to the workplace  Time to schedule the work  Time to inspect the work  Time to cure the materials  Time to make the parts  Time to find the tools.

Elapsed HoursTask HoursNumber of PersonsTask

4.2517.004Open Access

1.503.002Figure 1

5.5011.002Figure 2 (Group 1, 3, and 5)

3.757.502Figure 3 (Group 2 and 4)

3.507.002Figure 4 (Group 2 and 4)

4.0016.004Figure 5

2.755.502Figure 6

4.0016.004Figure 7

5.7523.004Figure 8

BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: November 12, 2010 747-25-3586 12 of 206 BOEING SERVICE BULLETIN 747-25-3586

Pages 13–24 of 206