TextOCR
This text is OCR from a scan. OCR can misread letters and numbers.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'cb58aad47acc6e392bb4112602f816797bb535d7d631d56fd0f22ba95802aad9' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'cb58aad47acc6e392bb4112602f816797bb535d7d631d56fd0f22ba95802aad9' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
Commercial ABDEING Group Airplane 747 Service Bulletin Number: 747-28-2300 Date: January 16, 2008 Revision 1: June 02, 2008 ATA System: 2811 SUBJECT: CONVERSION AIRPLANE - Boeing Converted Freighter Modification of a 747-400 Combi Airplane to a 747-400 Special Freighter (SF) Airplane - Horizontal Stabilizer Tank Deactivation Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 730-774). An export license may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data has the individual responsibility to abide by all export laws.
ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET Copyright © 2008 The Boeing Company Unpublished Work - All Rights Reserved Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third parties.
Treatment of the document and the information it contains is governed by contract with Boeing. For more information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, MD-10, MD-11, MD-80, MD-88, MD-90, and the Boeing livery are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.
January 16, 2008 Revision 1: June 02, 2008 747-28-2300 BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 1 of 75
2.0
BOEING SERVICE BULLETIN 747-28-2300
BLANK PAGE January 16, 2008 Revision 1: June 02, 2008 747-28-2300 BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 2 of 75
BOEING SERVICE BULLETIN 747-28-2300 Table of Contents Revision Transmittal Sheet 5 Summary 7
1. PLANNING INFORMATION Effectivity .
1. Airplanes
2. Spares Affected . 11 Concurrent Requirements 12 Reason . 12 Description 12 Compliance 13 Approval 13 Manpower . 13 H. Weight and Balance Changes 13 Electrical Load Data 13 References . 14
1. Existing Data:. 14
2. Data supplied with this Service Bulletin: 15
3. Installation Drawings Used in the Preparation of this Service Bulletin: 15
4. Process Data: 15 K. Publications Affected. 16 Interchangeability and Intermixability of Parts 16
2. MATERIAL INFORMATION. 17 A. Material - Price and Availability . 17 B. Industry Support Information 17 C. Parts Necessary For Each Airplane 17
1. Kits/Parts: 17 Parts and Materials Supplied by the Operator:. 18 Parts Modified and Reidentified: 18 Parts Removed and Not Replaced: 18 Parts Necessary to Change Spares. 20 Special Tooling - Price and Availability 20 Special Tooling Necessary to do this Service Bulletin. 20
3. ACCOMPLISHMENT INSTRUCTIONS 21 GENERAL INFORMATION. • 21 WORK INSTRUCTIONS.. 21 FIGURE 1: OVERHEAD CIRCUIT BREAKER PANEL P7-2 CHANGE . 35 FIGURE 2: HORIZONTAL STABILIZER TANK AFT FUEL TRANSFER SYSTEM LOCATION. 37 FIGURE 3: HORIZONTAL STABILIZER TANK FWD FUEL TRANSFER SYSTEM LOCATION. 39 FIGURE 4: LEFT WING REFUELING PANEL P42 MODIFICATION. 41 FIGURE 5: H.STAB FUEL PUMP LOW PRESSURE SWITCHES AND P85 PANEL CHANGE. 43 FIGURE 6: HORIZONTALSTABILIZER TRANSFER PUMP MOTOR IMPELLER ASSY CHANGE 45 FIGURE 7: REMOTE ELECTRONIC UNIT CHANGES - E8 EQUIPMENT RACK 48 FIGURE 8: FUEL SYSTEM CARD FILE CHANGE 50 FIGURE 9: FUEL MANAGEMENT CONTROL PANEL CHANGE 51 January 16, 2008 Revision 1: June 02, 2008 747-28-2300 BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 3 of 75
BOEING SERVICE BULLETIN 747-28-2300 FIGURE 10: DEACTIVATION OF TAIL TANK AT LEFT, CENTER, AND RIGHT EIU - E2-6 WIU WIRE CHANGE.......••• 52 FIGURE 11: REMOVAL OF HORIZONTAL STABILIZER TANK TRANSFER LINE . 62 FIGURE 12: REWORK OF WIRE BUNDLES. . • 70 FIGURE 13: REWORK OF WIRE BUNDLES. . . . 73 January 16, 2008 Revision 1: June 02, 2008 747-28-2300 BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 4 of 75
Commercial QBOEING Group Airplane 747 Service Bulletin Number: 747-28-2300 Revision Transmittal Sheet Date: January 16, 2008 Revision 1: June 02, 2008 ATA System: 2811 SUBJECT: CONVERSION AIRPLANE - Boeing Converted Freighter Modification of a 747-400 Combi Airplane to a 747-400 Special Freighter (SF) Airplane - Horizontal Stabilizer Tank Deactivation This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION No more work is necessary on airplanes changed as shown in the original release of this service bulletin.
Airplane RT164 was added to this service bulletin effectivity and will be included as Group 2 airplane.
REASON FOR REVISION The changes in this service bulletin were requested by the operator.
This Revision adds airplane RT164 (Group 2) to the service bulletin effectivity.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location ofimportant changes.
Pages with no vertical lines have no important changes.
REVISION HISTORY Original Issue: January 16, 2008 Revision 1: June 02, 2008 January 16, 2008 Revision 1: June 02, 2008 747-28-2300 BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 5 of 75
BOEING SERVICE BULLETIN 747-28-2300
BLANK PAGE January 16, 2008 Revision 1: June 02, 2008 747-28-2300 BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 6 of 75
Commercial @BOEING Group Airplane 747 Service Bulletin Number: Date: January 16, 2008 747-28-2300 Summary Revision 1: June 02, 2008 ATA System: 2811 SUBJECT: CONVERSION AIRPLANE - Boeing Converted Freighter Modification of a 747-400 Combi Airplane to a 747-400 Special Freighter (SF) Airplane - Horizontal Stabilizer Tank Deactivation
CONCURRENT REQUIREMENTS Refer to Paragraph 1.B., Concurrent Requirements.
BACKGROUND As part of the Boeing Converted Freighter (BCF), the horizontal stabilizer fuel tank is to be deactivated and the fuel transfer line removed. This service bulletin provides instructions and a kit of parts to do that.
ACTION (MC 0100MK4090) On P7-2 overhead circuit breaker panel, remove the Horizontal Stabilizer REFUEL & XFR circuit breakers C10125 and C10126. Rework the circuit breaker wiring.
On the horizontal stabilizer refuel valve control unit, disconnect electrical connector, cap and stow wiring.
At the FWD and AFT fuel isolation valves for the horizontal stabilizer transfer system, disconnect the electrical connector from each valve actuator, coil and stow wiring. Position manual override lever for affected valves, located on valve actuator, to closed position and lockwire to secure in place.
On the P42 left wing refueling panel coil and stow wiring for indicator, switches and lights. Place "H.STAB TANK DEACTIVATED" placard above H.STAB indicator.
On P85 panel, remove HOR STAB XFER/JETT PUMP circuit breakers C03141 and C03142. Remove HOR STAB XFER/JETT PUMP placard below the circuit breakers. Rework circuit breaker wire and pump wiring. Cap and stow plugs S1884 and S1885 for H.STAB fuel pump low pressure switches.
On the horizontal stabilizer transfer / jettison pumps, remove two motor impeller assemblies located on the front spar of H. Stab tank. Install plugs and associated pins.
On the E8 equipment rack, in the Remote Electronic Unit (REU), M7861, remove REU cover plate and H.STAB Individual Fuel Quantity Channel (IFQC) card. Re-install REU cover plate. Placard REU "INOP" and rework the wiring.
On the Fuel System Card File, remove horizontal stabilizer transfer Single Point Sensor Control (SPS) card and install cover assembly. Coil and stow SPSC card wiring. Insert jumper wire in Fuel System Card File.
On P5 overhead panel, remove the Fuel Management Control Module (M00154) and rework the wiring.
January 16, 2008 Revision 1: June 02, 2008 747-28-2300 BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 7 of 75
BOEING SERVICE BULLETIN 747-28-2300 On the Fuel Quantity Indicating System (FQIS), reprogram FQIS card file for Horizontal Stabilizer absent.
On the Wire Interface Unit (WIU), modify affected wire bundles at WIU.
On the fuel transfer line, remove and discard fuel transfer line from center wing tank to the horizontal stabilizer fuel tank, and install plugs.
On the E2 equipment rack, make changes to the left, center, and right Electronic Instrument Unit (EIU) configuration pins to disable the Horizontal Stab Tank display and associated messaging on the Integrated Display Unit (IDS).
EFFECTIVITY NOTE: This change was purchased by United Parcel Service (UPS) for the airplane shown below.
Group Operator Airplanes 1 EVA RT161 EVA RT164
COMPLIANCE Federal Aviation Administration (FAA) Airworthiness Directives: Refer to the Section 1.E., Compliance
INDUSTRY SUPPORT INFORMATION Boeing Industry Support information is provided in Master Change 0100MK4090.
MANPOWER Man Hours are not listed in this Service Bulletin. They are negotiated separately between Boeing and the contracted modification facility.
MATERIAL INFORMATION Negotiated Kits.
January 16, 2008 Revision 1: June 02, 2008 747-28-2300 BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 8 of 75
BOEING SERVICE BULLETIN 747-28-2300
POSITION MANUAL OVERRIDE LEVER
FOR FWD ISOLATION VALVES TO
CLOSE POSITION AND DISCONNECT
ELECTRICAL CONNECTOR FROM
VALVE ACTUATOR
POSITION MANUAL OVERRIDE
LEVER FOR AFT ISOLATION
VALVES TO CLOSE POSITION
AND DISCONNECT
ELECTRICAL CONNECTOR
FROM VALVE ACTUATOR REMOVE 2 MOTOR REMOVE SPS CARD FROM IMPELLER UNITS.
FUEL SYSTEM CARD FILE INSTALL PLUGS
AND INSTALL COVER ASSY IN AFT EQUIPMENT RACK E8 REMOVE IFQC CARD IN REU.
PLACARD REU INOP. REMOVE REMOVE FUEL 2 CIRUIT BREAKERS ON P85 MGMT PANEL PANEL.
IN THE P5
REMOVE HORIZONTAL
STABILIZER FUEL
TRANSFER LINE AND REMOVE REFUEL AND PLACARDH. STAB TANK INSTALL PLUGS XFR STAB L AND DEACTIVATED" ON LEFT STAB R CIRCUIT WING REFUELING P42 PANEL BREAKERS ON P7
PANEL REMOVE RELAYS AND CHANGE THE WIRING AT THE P7, P414 FUEL SYSTEM CARD FILE, E2-6 SHELF AND THE P54 PANEL. REVISE PIN PROGRAMMING TO THE LEFT, CENTER AND RIGHT EIU ON SHELF 6 OF E2-6. 1477225 January 16, 2008 Revision 1: June 02, 2008 747-28-2300 BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 9 of 75
BOEING SERVICE BULLETIN 747-28-2300
BLANK PAGE January 16, 2008 Revision 1: June 02, 2008 747-28-2300 BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 10 of 75
Commercial LBOEING Group Airplane 747 Service Bulletin Number: 747-28-2300 Date: January 16, 2008 Revision 1: June 02, 2008 ATA System: 2811 SUBJECT: CONVERSION AIRPLANE - Boeing Converted Freighter Modification of a 747-400 Combi Airplane to a 747-400 Special Freighter (SF) Airplane - Horizontal Stabilizer Tank Deactivation
1. PLANNING INFORMATION A. Effectivity
1. Airplanes Refer to Service Bulletin Index Document D6-30300 Part 3 for Airplane Variable Number, Line Number, and Serial Number data.
This service bulletin is for the airplanes shown below. Refer to Master Change 0100MK4090 for data about this change.
NOTE: This change was purchased by United Parcel Service (UPS) for the airplane shown below.
GROUP CONFIGURATION DESCRIPTION 1 747-400 airplane RT161 to be modified to a 747-400SF.
2 747-400 airplane RT164 to be modified to a 747-400SF.
Airplane Models:
747-400 Variable Number | Group RT161 1 RT164 2
2. Spares Affected None.
January 16, 2008 Revision 1: June 02, 2008 747-28-2300 BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 11 of 75
BOEING SERVICE BULLETIN 747-28-2300 B. Concurrent Requirements This service bulletin is to be accomplished concurrently with the 747-400 Boeing Converted Freighter Modification.
The service bulletin(s) listed below must be done before or at the same time as this service bulletin:
Company Service Bulletin Description Boeing 747-28-2182 FUEL - INDICATING - Fuel Quantity Processor And Remote Electronics Unit Change Boeing 747-28-2201 FUEL - Horizontal Stabilizer Tank Fuel Transfer System - Drain Mast Assembly Modification and Drain Line Replacement C. Reason As part of the Boeing Converted Freighter (BCF), the horizontal stabilizer fuel tank is to be deactivated and the fuel transfer line removed. This service bulletin provides instructions and a kit of parts to do that.
D. Description On P7-2 overhead circuit breaker panel, remove the Horizontal Stabilizer REFUEL & XFR circuit breakers C10125 and C10126. Rework the circuit breaker wiring.
On the horizontal stabilizer refuel valve control unit, disconnect electrical connector, cap and stow wiring.
At the FWD and AFT fuel isolation valves for the horizontal stabilizer transfer system, disconnect the electrical connector from each valve actuator, coil and stow wiring. Position manual override lever for affected valves, located on valve actuator, to closed position and lockwire to secure in place.
On the P42 left wing refueling panel coil and stow wiring for indicator, switches and lights. PlaceiH.STAB TANK DEACTIVATED" placard above H.STAB indicator.
On P85 panel, remove HOR STAB XFER/JETT PUMP circuit breakers C03141 and C03142. Remove HOR STAB XFER/JETT PUMP placard below the circuit breakers. Rework circuit breaker wire and pump wiring. Cap and stow plugs S1884 and S1885 for H.STAB fuel pump low pressure switches.
On the horizontal stabilizer transfer / jettison pumps, remove two motor impeller assemblies located on the front spar of H. Stab tank. Install plugs and associated pins.
On the E8 equipment rack, in the Remote Electronic Unit (REU), M7861, remove REU cover plate and H.STAB Individual Fuel Quantity Channel (IFQC) card. Re-install REU cover plate. Placard REU "INOP® and rework the wiring.
On the Fuel System Card File, remove horizontal stabilizer transfer Single Point Sensor Control (SPSC) card and install cover assembly. Coil and stow SPSC card wiring. Insert jumper wire in Fuel System Card File.
January 16, 2008 Revision 1: June 02, 2008 747-28-2300 BOEING PROPRIETARY - Copyright @ Unpublished Work - See page 1 for details. 12 of 75