Copy · SB-747-52-2307 1 · 121 pages

© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2017-0905; AD 2018-19-23 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = 'a4987eda68a86bdaf785d23e0eb38726c1c26e6353fb3abfe6c28094656a1cb6'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Commercial Airplanes 747 Service Bulletin

SPECIAL ATTENTION Number: 747-52-2307 Original Issue: May 23, 2017 ATA System: 5231 5234 SUBJECT: DOORS - Nose Cargo Door and Forward/Aft Cargo Door - Control Switch Change Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 300-774). An export license may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data has the individual responsibility to abide by all export laws.

9E991ECCN:

BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET Copyright © 2017 Boeing.

Unpublished Work. All Rights Reserved.

Treatment of this document and its content is governed by contract with Boeing. Rights to use this document are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company.

Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.

Original Issue: May 23, 2017 747-52-2307 1 of 121

3.0

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: May 23, 2017 747-52-2307 2 of 121 BOEING SERVICE BULLETIN 747-52-2307

BLANK PAGE

Table of Contents

S u m m a r y5

1. PLANNING INFORMATION9

A . E f f e c t i v i t y9

1. Airplanes9

2 . S p a r e s A f f e c t e d ........................................ 1 0 B. Concurrent Requirements ...................................... 1 0 C. Reason ................................................ 1 0 D. Description .............................................. 1 1 E. Compliance .............................................. 1 2 F . A p p r o v a l ............................................... 1 2 G. Manpower .............................................. 1 2 H. Weight and Balance Changes .................................... 1 5 I. Electrical Load Data ......................................... 1 5 J . R e f e r e n c e s .............................................. 1 6

1. Existing Data: ......................................... 1 6

2. Data Supplied with this Service Bulletin: ........................... 1 6

3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 1 6 K. Publications Affected ........................................ 1 7 L. Interchangeability and Intermixability of Parts ........................... 1 7 M. Software Accomplishment Summary ................................ 1 7

2. MATERIAL INFORMATION ........................................ 1 9 A. Material - Price and Availability ................................... 1 9 B. Industry Support Information .................................... 2 0 C. Parts Necessary for Each Airplane ................................. 2 1 1 . K i t s / P a r t s ............................................ 2 1

2. Parts and Materials Supplied by the Operator ........................ 3 2

3. Parts Modified and Reidentified ................................ 3 2

4. Parts Removed and Not Replaced .............................. 3 2 D. Parts Necessary to Change Spares ................................. 3 3 E. Special Tooling - Price and Availability ............................... 3 3 F. Special Tooling Necessary to do this Service Bulletin ....................... 3 3

3. ACCOMPLISHMENT INSTRUCTIONS .................................. 3 5 A. GENERAL INFORMATION ..................................... 3 5 B. WORK INSTRUCTIONS ....................................... 3 7 F I G U R E 1 : N O S E C A R G O D O O R C O N T R O L S W I T C H C H A N G E [ G r o u p 1 ] .............. 4 1 FIGURE 2: NOSE CARGO DOOR AND LIGHT CONTROL MODULE, H121 - WIRE BUNDLE W2572 CHANGE [Group 1] ....................................... 4 3 F I G U R E 3 : F O R W A R D C A R G O D O O R C O N T R O L S W I T C H R E M O V A L ................ 4 5 FIGURE 4: FORWARD CARGO DOOR CONTROL SWITCH PAN ASSY REMOVAL ......... 4 7 FIGURE 5: FORWARD CARGO DOOR CONTROL SWITCH PAN ASSY INSTALLATION ...... 5 1 FIGURE 6: P86 PANEL - RESISTOR R2331 REMOVAL ......................... 5 6 FIGURE 7: P86 PANEL - WIRE BUNDLE W0136 CHANGE ....................... 5 9 FIGURE 8: WIRE BUNDLE W0572 CHANGE ............................... 6 0 FIGURE 9: WIRE BUNDLE W1092 CHANGE ............................... 6 3 FIGURE 10: WIRE BUNDLE W0572 AND W1092 ROUTING ....................... 6 5 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: May 23, 2017 747-52-2307 3 of 121 BOEING SERVICE BULLETIN 747-52-2307

F I G U R E 1 1 : F O R W A R D C A R G O D O O R C O N T R O L S W I T C H I N S T A L L A T I O N ............. 7 0 FIGURE 12: FORWARD CARGO DOOR LIGHT SWITCH AND MARKER INSTALLATION ....... 7 2 FIGURE 13: FORWARD CARGO DOOR CONTROL MARKER CHANGE [Group 1-2] ......... 7 5 F I G U R E 1 4 : F O R W A R D C A R G O D O O R C O N T R O L M A R K E R C H A N G E [ G r o u p 3 ] ........... 7 8 F I G U R E 1 5 : A F T C A R G O D O O R C O N T R O L S W I T C H R E M O V A L .................... 8 1 F I G U R E 1 6 : A F T C A R G O D O O R C O N T R O L P A N E L R E M O V A L ..................... 8 3 F I G U R E 1 7 : A F T C A R G O D O O R C O N T R O L S W I T C H P A N C H A N G E .................. 8 6 FIGURE 18: P59 PANEL - RESISTOR R2332 REMOVAL ......................... 9 4 FIGURE 19: P59 PANEL - WIRE BUNDLE W0080 CHANGE ....................... 9 7 FIGURE 20: WIRE BUNDLE W0574 CHANGE ............................... 9 8 FIGURE 21: WIRE BUNDLE W0574 ROUTING .............................. 1 0 3 FIGURE 22: AFT CARGO DOOR CONTROL SWITCH INSTALLATION ................ 1 0 8 FIGURE 23: AFT CARGO DOOR LIGHT SWITCH AND MARKER INSTALLATION .......... 1 1 0 F I G U R E 2 4 : A F T C A R G O D O O R C O N T R O L M A R K E R C H A N G E [ G r o u p 1 - 2 ] ............. 1 1 5 FIGURE 25: AFT CARGO DOOR CONTROL MARKER CHANGE [Group 3] .............. 1 1 8 APPENDIX A: PART DEMAND INTENT ................................... 1 2 1 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: May 23, 2017 747-52-2307 4 of 121 BOEING SERVICE BULLETIN 747-52-2307

Commercial Airplanes 747 Service Bulletin

SPECIAL ATTENTION SummaryNumber: 747-52-2307Original Issue: May 23, 2017 ATA System: 5231 5234 SUBJECT: DOORS - Nose Cargo Door and Forward/Aft Cargo Door - Control Switch Change BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS DOCUMENT IMMEDIATELY.

CONCURRENT REQUIREMENTS None.

BACKGROUND This service bulletin gives instructions to change the nose, forward, and aft cargo door control switches and add an arm switch to the forward and aft cargo doors. The safety intent of this service bulletin is to prevent failures of the Nose, Forward, and Aft Cargo Door control switch from allowing un-commanded movement of the cargo doors, which if not corrected could lead to personnel injury or death.

Operators have reported un-commanded operation for the forward and aft cargo doors due to failed control switches. Testing of failed switches found that the cargo door control switch can remain actuated after released to the OFF position. 747-8/8F Certification Maintenance Requirements Document D011U721-02-03 requires existing Forward, Aft, and Nose Cargo Doors Control Switch replacement every 6 years. In the most recent report of un-commanded cargo door operation the switch had only been installed for 44 months. Replacement of the Nose, Forward, and Aft Cargo door control switch with a new improved switch, and the addition of an arm switch in the open and close circuitry of the Forward and Aft Cargo Doors in accordance with this service bulletin will prevent failures that could lead to cargo door un-commanded movement.

Boeing Service Related Problem (SRP) 747-8-SRP-52-0114 is related to this service bulletin.

Boeing Fleet Team Digest (FTD) 747 FTD 52-07001 is related to this service bulletin.

This table is provided to operators for planning purposes only. Refer to the applicable sections for more information.

ReferenceAffectedPlanning Data Paragraph 1.A.2., Spares AffectedNoSpares Affected Paragraph 1.E., Compliance and Paragraph

1.F., Approval YesAD Related Paragraph 1.H., Weight and Balance ChangesYesWeight and Balance Change Paragraph 1.I., Electrical Load DataNoElectrical Load Changed Paragraph 1.K., Publications AffectedYesPublications Affected Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: May 23, 2017 747-52-2307 5 of 121

ReferenceAffectedPlanning Data Paragraph 1.K., Publications AffectedYesAirplane Flight Operations Affected (Flight Crew Operations Manual and/or FAA Approved Airplane Flight Manual) Paragraph 2.C.1., Kits/PartsYesKits/Parts Required Paragraph 2.C.2., Parts and Materials Supplied by the Operator YesOperator Supplied Parts/Material Paragraph 2.F., Special Tooling Necessary to do this Service Bulletin NoSpecial Tooling Required ACTION (PRR 85901-148S) Group 1:

WORK PACKAGE 1: NOSE CARGO DOOR CONTROL SWITCH CHANGE

1. Change the nose cargo door control switch.

2. Change wire bundle W2572.

WORK PACKAGE 2: FORWARD CARGO DOOR CONTROL SWITCH CHANGE

1. Replace existing forward cargo door control switch pan assembly (assy) with new pan assy.

2. Remove resistor R2331 from the P86 panel.

3. Change wire bundles W0136, W0572, and W1092.

4. Route wire bundles W0572 and W1092.

5. Install new forward cargo door control switch, arm switch, indicator, and support panel.

6. Change the forward cargo door control switch markers.

WORK PACKAGE 3: AFT CARGO DOOR CONTROL SWITCH CHANGE

1. Change the aft cargo door control switch pan.

2. Remove resistor R2332 from the P59 panel.

3. Change wire bundles W0080 and W0574.

4. Route wire bundle W0574.

5. Install new aft cargo door control switch, arm switch, indicator, and support panel.

6. Change the aft cargo door control switch markers.

EFFECTIVITY 747-8/-8F Airplane(s). Refer to Paragraph 1.A.1., Airplanes, for the list of affected airplane(s).

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: May 23, 2017 747-52-2307 6 of 121 BOEING SERVICE BULLETIN 747-52-2307

COMPLIANCE The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin mandatory.

Boeing recommends that the change given in this service bulletin be done within 35 months after the original issue date of this service bulletin.

INDUSTRY SUPPORT INFORMATION Boeing warranty remedies are available for airplanes in warranty as of September 18, 2014. Please refer to Paragraph 2.B., Industry Support Information. The warranty remedies will expire eight years from the original issue date of this service bulletin.

MANPOWER Elapsed HoursTotal Task HoursAirplanes

55.3077.80Group 1

53.2575.75Group 2 and 3

MATERIAL INFORMATION Boeing Supplied Kits/Parts.

Refer to Paragraph 2.A., Material - Price and Availability.

Operators are encouraged to complete the survey provided in APPENDIX A of this service bulletin to help Boeing predict the quantity and timing of the Boeing Supplied Kits/Parts.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: May 23, 2017 747-52-2307 7 of 121 BOEING SERVICE BULLETIN 747-52-2307

Page 8OCROpen in PDF

BOEING SERVICE BULLETIN 747-52-2307

FORWARD CARGO

DOOR CONTROL

SWITCH CHANGE

AFT CARGO DOOR

CONTROL

SWITCH CHANGE

NOSE CARGO DOOR CHANGE CONTROL SWITCH 2508262 Original Issue: May 23, 2017 PROPRIETARY - Copyright © Unpublished Export Controlled ECCN: 9E991 - BOEING 747-52-2307 Work - See page 1 for details. 8 of 121

Commercial Airplanes 747 Service Bulletin

SPECIAL ATTENTION Number: 747-52-2307 Original Issue: May 23, 2017 ATA System: 5231 5234 SUBJECT: DOORS - Nose Cargo Door and Forward/Aft Cargo Door - Control Switch Change BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS DOCUMENT IMMEDIATELY.

1. PLANNING INFORMATION A. Effectivity

1. Airplanes This service bulletin is applicable to 747-8/-8F Airplanes, line numbers 1420-1536 in 3 Groups.

The Variable Numbers and Group Information for the applicable airplanes is given below. An equivalent change is on subsequent production airplanes. Refer to PRR 85901-148S for data about this change.

Refer to Service Bulletin Index D6-30300 Part 3 for Airplane Variable Number, Line Number, and Serial Number data.

DESCRIPTIONCONFIGURATIONGROUP 747-8F airplanes line numbers 1420-1536-1 747-8 airplanes line numbers 1434-1531 except line numbers 1499, 1507, 1508, 1510, 1515, 1517, and 1518 -2 747-8 airplanes line numbers 1499, 1507, 1508, 1510, 1515, 1517, and 1518 -3 Airplane Models:

747-8, 747-8F GroupVariable Number 2RC001 - RC009 2RC021 - RC040 2RC051 - RC057 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: May 23, 2017 747-52-2307 9 of 121

GroupVariable Number 3RC066 - RC072 2RC076 - RC077 1RC501 - RC514 1RC521 - RC528 1RC541 1RC546 - RC566 1RC571 - RC582 1RC601 - RC605 1RC641 - RC644 1RC651 - RC652 1RC661 1RC671 - RC674

2. Spares Affected None.

B. Concurrent Requirements None.

C. Reason This service bulletin gives instructions to change the nose, forward, and aft cargo door control switches and add an arm switch to the forward and aft cargo doors. The safety intent of this service bulletin is to prevent failures of the Nose, Forward, and Aft Cargo Door control switch from allowing un-commanded movement of the cargo doors, which if not corrected could lead to personnel injury or death.

Operators have reported un-commanded operation for the forward and aft cargo doors due to failed control switches. Testing of failed switches found that the cargo door control switch can remain actuated after released to the OFF position. 747-8/8F Certification Maintenance Requirements Document D011U721-02-03 requires existing Forward, Aft, and Nose Cargo Doors Control Switch replacement every 6 years. In the most recent report of un-commanded cargo door operation the switch had only been installed for 44 months. Replacement of the Nose, Forward, and Aft Cargo door control switch with a new improved switch, and the addition of an arm switch in the open and close circuitry of the Forward and Aft Cargo Doors in accordance with this service bulletin will prevent failures that could lead to cargo door un-commanded movement.

Boeing Service Related Problem (SRP) 747-8-SRP-52-0114 is related to this service bulletin.

Boeing Fleet Team Digest (FTD) 747 FTD 52-07001 is related to this service bulletin.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: May 23, 2017 747-52-2307 10 of 121 BOEING SERVICE BULLETIN 747-52-2307

D. Description Group 1:

WORK PACKAGE 1: NOSE CARGO DOOR CONTROL SWITCH CHANGE

1. Change the nose cargo door control switch.

2. Change wire bundle W2572.

WORK PACKAGE 2: FORWARD CARGO DOOR CONTROL SWITCH CHANGE

1. Replace existing forward cargo door control switch pan assembly (assy) with new pan assy.

2. Remove resistor R2331 from the P86 panel.

3. Change wire bundles W0136, W0572, and W1092.

4. Route wire bundles W0572 and W1092.

5. Install new forward cargo door control switch, arm switch, indicator, and support panel.

6. Change the forward cargo door control switch markers.

WORK PACKAGE 3: AFT CARGO DOOR CONTROL SWITCH CHANGE

1. Change the aft cargo door control switch pan.

2. Remove resistor R2332 from the P59 panel.

3. Change wire bundles W0080 and W0574.

4. Route wire bundle W0574.

5. Install new aft cargo door control switch, arm switch, indicator, and support panel.

6. Change the aft cargo door control switch markers.

The work in this service bulletin is done in the maintenance zone(s) given below.

Group 1:

Affected Maintenance Zones ZoneModel 122, 142, 211747-8F Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: May 23, 2017 747-52-2307 11 of 121 BOEING SERVICE BULLETIN 747-52-2307

Group 2-3:

Affected Maintenance Zones ZoneModel 122, 142747-8 E. Compliance The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin mandatory.

Boeing recommends that the change given in this service bulletin be done within 35 months after the original issue date of this service bulletin.

F. Approval This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified in this service bulletin comply with the applicable regulations and are FAA approved, as well as European Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on the airplane in its original Boeing delivery configuration or as modified by other approved Boeing changes.

If an airplane has a non-Boeing modification or repair that affects a component or system also affected by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval before incorporating this service bulletin.

G. Manpower The table below shows an estimate of the task hours necessary to do the cargo door control switch change for each nose, forward, and aft cargo door. This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator task hour data if necessary. The estimate does not include lost time. These are some examples of lost time:

• Time to adjust to the workplace

• Time to schedule the work

• Time to inspect the work

• Time to cure the materials

• Time to make the parts

• Time to find the tools Group 1:

WORK PACKAGE 1: NOSE CARGO DOOR CONTROL SWITCH CHANGE Elapsed HoursTask HoursNumber of PersonsTask

0.250.251OPEN ACCESS

0.500.501FIGURE 1

0.800.801FIGURE 2 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: May 23, 2017 747-52-2307 12 of 121 BOEING SERVICE BULLETIN 747-52-2307

Pages 13–24 of 121