© The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2017-0905; AD 2018-19-23 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

TextPartly OCR

Some pages are OCR from a scan. OCR can misread letters and numbers.

Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license
  FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256)
  WHERE p.file_sha256 = '8d6416afca132a8c42eee287e0bf3c953aaaf69b42567b8e6a750ce481bc45be'
  ORDER BY p.page"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

Commercial Airplanes 757 Service Bulletin

SPECIAL ATTENTION Number: 757-52-0093 Original Issue: May 05, 2016 Revision 2: November 14, 2017 ATA System: 5234 SUBJECT: DOORS - No. 1 and 2 Cargo Door - Cargo Door Arm Switch and Relay Installation Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15 CFR 300-774). An export license may be required before it is used for development, production or use by foreign persons from specific countries. The controller of this data has the individual responsibility to abide by all export laws.

9E991ECCN:

BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET Copyright © 2016 Boeing.

Unpublished Work. All Rights Reserved.

Treatment of this document and its content is governed by contract with Boeing. Rights to use this document are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company.

Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection with this document unless provided in writing by Boeing.

Original Issue: May 05, 2016 757-52-0093Revision 2: November 14, 2017 1 of 337

2.0

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: May 05, 2016 757-52-0093Revision 2: November 14, 2017 2 of 337 BOEING SERVICE BULLETIN 757-52-0093

BLANK PAGE

Table of Contents

Revision Transmittal Sheet7

Summary9

1. PLANNING INFORMATION13

A. Effectivity13

1. Airplanes13

2. Spares Affected21

B. Concurrent Requirements21

C. Reason21

D. Description22

E. Compliance24

F. Approval24

G. Manpower25

H. Weight and Balance Changes50

I. Electrical Load Data51

J. References51

1. Existing Data:51

2. Data Supplied with this Service Bulletin:52

3. Installation Drawings Used in the Preparation of this Service Bulletin:52

K. Publications Affected53

L. Interchangeability and Intermixability of Parts53

M. Software Accomplishment Summary53

2. MATERIAL INFORMATION55

A. Material - Price and Availability55

B. Industry Support Information59

C. Parts Necessary for Each Airplane59

1. Kits/Parts59

2. Parts and Materials Supplied by the Operator85

3. Parts Modified and Reidentified86

4. Parts Removed and Not Replaced86

D. Parts Necessary to Change Spares86

E. Special Tooling - Price and Availability86

F. Special Tooling Necessary to do this Service Bulletin86

3. ACCOMPLISHMENT INSTRUCTIONS87

A. GENERAL INFORMATION87

B. WORK INSTRUCTIONS89

FIGURE 1: MAIN ELECTRONICS COMPARTMENT - FLOOR PANELS AND COVERS - REMOVAL. 105 FIGURE 2: MAIN EQUIPMENT CENTER - P65 PANEL - RELAY CUTOUT AND GROUND BLOCK

INSTALLATION [Group 1-8, 15-16, 50]107

FIGURE 3: MAIN EQUIPMENT CENTER - P65 PANEL - RELAY CUTOUT AND GROUND BLOCK

INSTALLATION [Group 9-14, 18-20, 23-26, 28-32, 36-39, 41-42, 44, 46-49]110

FIGURE 4: MAIN EQUIPMENT CENTER - P65 PANEL - RELAY CUTOUT [Group 17, 21-22, 27, 33-35,

40, 43, 45]113

FIGURE 5: MAIN EQUIPMENT CENTER - P65 PANEL - DECAL INSTALLATION [Group 1-8, 15-16, 50]

.115

FIGURE 6: MAIN EQUIPMENT CENTER - P65 PANEL - DECAL INSTALLATION [Group 9-14, 18-20,

23-26, 28-32, 36-39, 41-42, 44, 46-49]117

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: May 05, 2016 757-52-0093Revision 2: November 14, 2017 3 of 337 BOEING SERVICE BULLETIN 757-52-0093

FIGURE 7: MAIN EQUIPMENT CENTER - P65 PANEL - DECAL INSTALLATION [Group 17, 21-22, 27,

33-35, 40, 43, 45]119

FIGURE 8: FORWARD CARGO DOOR AREA - P43 PANEL - CARGO DOOR ARM SWITCH CUTOUT

.121

FIGURE 9: FORWARD CARGO DOOR AREA - P43 PANEL - CARGO DOOR CONTROL AND ARM

SWITCH INSTALLATION123

FIGURE 10: FORWARD CARGO COMPARTMENT AND MAIN EQUIPMENT CENTER - WIRE BUNDLES

W0816 AND W4104 - WIRE ROUTING [Group 1]125

FIGURE 11: FORWARD CARGO COMPARTMENT AND MAIN EQUIPMENT CENTER - WIRE BUNDLES

W0816, W4104 AND W4162 - WIRE ROUTING [Group 2-20, 22-50]130

FIGURE 12: FORWARD CARGO COMPARTMENT AND MAIN EQUIPMENT CENTER - WIRE BUNDLES

W0816, W4162 AND W6634 - WIRE ROUTING [Group 21]135

FIGURE 13: P43 PANEL - W0816 WIRE BUNDLE - WIRING CHANGE [Group 1]139

FIGURE 14: P43 PANEL - W0816 WIRE BUNDLE - WIRING CHANGE [Group 2-20, 22-51]141

FIGURE 15: P43 PANEL - W0816 WIRE BUNDLE - WIRING CHANGE [Group 21]143

FIGURE 16: P41 PANEL - W4104 WIRE BUNDLE - WIRING CHANGE [Group 1]145

FIGURE 17: P41 PANEL - W4104 WIRE BUNDLE - WIRING CHANGE [Group 2-20, 22-51]147

FIGURE 18: P65 PANEL - W4162 WIRE BUNDLE - WIRING CHANGE [Group 2-20, 22-51]148

FIGURE 19: P65 PANEL - W4162 WIRE BUNDLE - WIRING CHANGE [Group 21]149

FIGURE 20: P41 PANEL - W6634 WIRE BUNDLE - WIRING CHANGE [Group 21]150

FIGURE 21: P65 PANEL - W0808 WIRE BUNDLE - WIRING CHANGE [Group 1]152

FIGURE 22: P65 PANEL - W0808 WIRE BUNDLE - WIRING CHANGE [Group 2-8, 15-16, 50]154

FIGURE 23: P65 PANEL - W0808 WIRE BUNDLE - WIRING CHANGE [Group 9-14, 17-20, 23-34, 36-39,

41-49, 51]156

FIGURE 24: P65 PANEL - W0808 WIRE BUNDLE - WIRING CHANGE [Group 21]158

FIGURE 25: P65 PANEL - W0808 WIRE BUNDLE - WIRING CHANGE [Group 22, 35]160

FIGURE 26: P65 PANEL - W0808 WIRE BUNDLE - WIRING CHANGE [Group 40]162

FIGURE 27: AFT CARGO DOOR AREA - P44 PANEL - CARGO DOOR ARM SWITCH CUTOUT . . 164 FIGURE 28: AFT CARGO DOOR AREA - P44 PANEL - CARGO DOOR CONTROL AND ARM SWITCH

INSTALLATION166

FIGURE 29: AFT CARGO COMPARTMENT - WIRE BUNDLES W1016 AND W2632 - WIRE ROUTING

[Group 1]168

FIGURE 30: AFT CARGO COMPARTMENT - WIRE BUNDLES W1016, W2662 AND W4106 - WIRE

ROUTING [Group 2, 50]172

FIGURE 31: AFT CARGO COMPARTMENT - WIRE BUNDLES W1016, W2662 AND W2716 - WIRE

ROUTING [Group 3]176

FIGURE 32: AFT CARGO COMPARTMENT - WIRE BUNDLES W1016, W2632 AND W2662 - WIRE

ROUTING [Group 4]180

FIGURE 33: AFT CARGO COMPARTMENT - WIRE BUNDLES W1016, W2662 AND W4106 - WIRE

ROUTING [Group 5]184

FIGURE 34: AFT CARGO COMPARTMENT - WIRE BUNDLES W1016, W2662 AND W2716 - WIRE

ROUTING [Group 6-7]189

FIGURE 35: AFT CARGO COMPARTMENT - WIRE BUNDLES W1016, W2632 AND W2662 - WIRE

ROUTING [Group 8, 15-16]194

FIGURE 36: AFT CARGO COMPARTMENT - WIRE BUNDLES W1016, W2662 AND W2716 - WIRE

ROUTING [Group 9, 28]198

FIGURE 37: AFT CARGO COMPARTMENT - WIRE BUNDLES W1016, W2632 AND W2662 - WIRE

ROUTING [Group 10-11, 13-14, 17-19, 24-27, 29, 31, 33-34, 36-40, 42-49]202

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: May 05, 2016 757-52-0093Revision 2: November 14, 2017 4 of 337 BOEING SERVICE BULLETIN 757-52-0093

FIGURE 38: AFT CARGO COMPARTMENT - WIRE BUNDLES W1016, W2632 AND W2662 - WIRE

ROUTING [Group 12]206

FIGURE 39: AFT CARGO COMPARTMENT - WIRE BUNDLES W1016, W2632 AND W2662 - WIRE

ROUTING [Group 20, 32, 41]210

FIGURE 40: AFT CARGO COMPARTMENT - WIRE BUNDLES W1016, W5910 AND W2660 - WIRE

ROUTING [Group 21]216

FIGURE 41: AFT CARGO COMPARTMENT - WIRE BUNDLES W1016, W2632 AND W2662 - WIRE

ROUTING [Group 22, 35]220

FIGURE 42: AFT CARGO COMPARTMENT - WIRE BUNDLES W1016, W2632 AND W2662 - WIRE

ROUTING [Group 23]224

FIGURE 43: AFT CARGO COMPARTMENT - WIRE BUNDLES W1016, W2632 AND W2662 - WIRE

ROUTING [Group 30]230

FIGURE 44: P44 PANEL - W1016 WIRE BUNDLE - WIRING CHANGE [Group 1]234

FIGURE 45: P44 PANEL - W1016 WIRE BUNDLE - WIRING CHANGE [Group 2, 5, 50]236

FIGURE 46: P44 PANEL - W1016 WIRE BUNDLE - WIRING CHANGE [Group 3, 6-7, 9, 28]238

FIGURE 47: P44 PANEL - W1016 WIRE BUNDLE - WIRING CHANGE [Group 4, 8, 10-20, 22-27, 29-49,

51]240

FIGURE 48: P44 PANEL - W1016 WIRE BUNDLE - WIRING CHANGE [Group 21]242

FIGURE 49: AFT CARGO COMPARTMENT - W2632 WIRE BUNDLE - WIRING CHANGE [Group 1] . 244 FIGURE 50: AFT CARGO COMPARTMENT - W2632 WIRE BUNDLE - WIRING CHANGE [Group 4, 8,

10-20, 22-27, 29-49, 51]246

FIGURE 51: E6 RACK - W2660 WIRE BUNDLE - WIRING CHANGE [Group 21]248

FIGURE 52: E6 RACK - W2662 WIRE BUNDLE - WIRING CHANGE [Group 2, 5, 50]249

FIGURE 53: E6 RACK - W2662 WIRE BUNDLE - WIRING CHANGE [Group 3, 6-7, 9, 28]250

FIGURE 54: E6 RACK - W2662 WIRE BUNDLE - WIRING CHANGE [Group 4, 8, 10-19, 22, 24-27, 29, 31,

33-40, 42-48, 51]251

FIGURE 55: E6 RACK - W2662 WIRE BUNDLE - WIRING CHANGE [Group 20, 23, 32, 41]252

FIGURE 56: E6 RACK - W2662 WIRE BUNDLE - WIRING CHANGE [Group 30, 49]253

FIGURE 57: P42 PANEL - W2716 WIRE BUNDLE - WIRING CHANGE [Group 3, 6-7, 9, 28]254

FIGURE 58: P42 PANEL - W4106 WIRE BUNDLE - WIRING CHANGE [Group 2, 5, 50]256

FIGURE 59: P42 PANEL - W5910 WIRE BUNDLE - WIRING CHANGE [Group 21]257

FIGURE 60: P72 PANEL - W1028 WIRE BUNDLE - WIRING CHANGE [Group 1]259

FIGURE 61: E6 RACK - W1040 WIRE BUNDLE - WIRING CHANGE [Group 20, 23, 32, 41]261

FIGURE 62: E6 RACK - W1024 WIRE BUNDLE - WIRING CHANGE [Group 4, 8, 15-16]263

FIGURE 63: E6 RACK - W1024 WIRE BUNDLE - WIRING CHANGE [Group 2-3, 5-7, 50]265

FIGURE 64: E6 RACK - W1024 WIRE BUNDLE - WIRING CHANGE [Group 9, 28, 30, 49]267

FIGURE 65: E6 RACK - W1024 WIRE BUNDLE - WIRING CHANGE [Group 10-14, 17-19, 22, 24-27, 29,

31, 33-40, 42-48, 51]269

FIGURE 66: E6 RACK - W1024 WIRE BUNDLE - WIRING CHANGE [Group 21]271

FIGURE 67: AFT CARGO COMPARTMENT - P74 PANEL - WIRE BUNDLE W1028 ROUTING [Group 1]

.273

FIGURE 68: AFT CARGO COMPARTMENT - E6 RACK - WIRE BUNDLE W1040 ROUTING [Group 20, 23,

32, 41]274

FIGURE 69: AFT CARGO COMPARTMENT - E6 RACK - WIRE BUNDLE W1024 ROUTING [Group 2-3,

5-7, 50]275

FIGURE 70: AFT CARGO COMPARTMENT - E6 RACK - WIRE BUNDLE W1024 ROUTING [Group 4, 8,

15-16]276

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: May 05, 2016 757-52-0093Revision 2: November 14, 2017 5 of 337 BOEING SERVICE BULLETIN 757-52-0093

FIGURE 71: AFT CARGO COMPARTMENT - E6 RACK - WIRE BUNDLE W1024 ROUTING [Group 9, 28,

30, 49]277

FIGURE 72: AFT CARGO COMPARTMENT - E6 RACK - WIRE BUNDLE W1024 ROUTING [Group 10-14,

17-19, 21-22, 24-27, 29, 31, 33-40, 42-48, 51]278

FIGURE 73: MAIN EQUIPMENT CENTER - P65 PANEL - K10433 RELAY INSTALLATION [Group 1-8,

15-16, 50]279

FIGURE 74: MAIN EQUIPMENT CENTER - P65 PANEL - K10433 RELAY INSTALLATION [Group 9-14,

18-20, 23-26, 28-32, 36-39, 41-42, 44, 46-49, 51]282

FIGURE 75: MAIN EQUIPMENT CENTER - P65 PANEL - K10433 RELAY INSTALLATION [Group 17, 21-22,

27, 33-35, 40, 43, 45]285

FIGURE 76: AFT CARGO COMPARTMENT - P74 PANEL - K10434 RELAY AND DECAL INSTALLATION

[Group 1]288

FIGURE 77: AFT CARGO COMPARTMENT - E6 RACK - K10434 RELAY AND DECAL INSTALLATION

[Group 20, 23, 32, 41]291

FIGURE 78: AFT CARGO COMPARTMENT - E6 RACK - K10434 RELAY AND DECAL INSTALLATION

[Group 2-3, 5-7, 50]294

FIGURE 79: AFT CARGO COMPARTMENT - E6 RACK - K10434 RELAY AND DECAL INSTALLATION

[Group 4, 8, 15-16]297

FIGURE 80: AFT CARGO COMPARTMENT - E6 RACK - K10434 RELAY AND DECAL INSTALLATION

[Group 9, 28, 30, 49]300

FIGURE 81: AFT CARGO COMPARTMENT - E6 RACK - K10434 RELAY AND DECAL INSTALLATION

[Group 10-14, 17-19, 21-22, 24-27, 29, 31, 33-40, 42-48, 51]303

FIGURE 82: P65 PANEL - W0808 WIRE BUNDLE - WIRE ROUTING [Group 1-8, 15-16, 50]306

FIGURE 83: P65 PANEL - W0808 WIRE BUNDLE - WIRE ROUTING [Group 9-14, 17-49]308

FIGURE 84: MAIN ELECTRONICS COMPARTMENT - FLOOR PANELS AND COVERS - INSTALLATION

.310

FIGURE 85: P43 PANEL - CARGO DOOR ARM SWITCH IDENTIFICATION INSTALLATION312

FIGURE 86: P44 PANEL - CARGO DOOR ARM SWITCH IDENTIFICATION INSTALLATION314

FIGURE 87: P43 PANEL - CARGO DOOR ARM SWITCH IDENTIFICATION REPLACEMENT [Group 1-50]

.316

FIGURE 88: P44 PANEL - CARGO DOOR ARM SWITCH IDENTIFICATION REPLACEMENT [Group 1-50]

.318

FIGURE 89: MAIN EQUIPMENT CENTER - P65 PANEL - GROUND BLOCK INSTALLATION [Group 51]

.320

FIGURE 90: FORWARD CARGO COMPARTMENT AND MAIN EQUIPMENT CENTER - WIRE BUNDLES

W0816, W4104 AND W4162 - WIRE ROUTING [Group 51]324

FIGURE 91: P65 PANEL - W0808 WIRE BUNDLE - WIRE ROUTING [Group 51]329

FIGURE 92: AFT CARGO COMPARTMENT - WIRE BUNDLES W1016, W2632 AND W2662 - WIRE

ROUTING [Group 51]330

APPENDIX A: REPETITIVE FUNCTIONAL TEST - NO. 1 AND NO. 2 CARGO DOORS WITH SB 757-52-0093

CONTROL CIRCUIT334

APPENDIX B: PART DEMAND INTENT337

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: May 05, 2016 757-52-0093Revision 2: November 14, 2017 6 of 337 BOEING SERVICE BULLETIN 757-52-0093

Commercial Airplanes 757 Service Bulletin

SPECIAL ATTENTION Revision Transmittal SheetNumber: 757-52-0093Original Issue: May 05, 2016 Revision 2: November 14, 2017 ATA System: 5234 SUBJECT: DOORS - No. 1 and 2 Cargo Door - Cargo Door Arm Switch and Relay Installation This revision includes all pages of the service bulletin.

COMPLIANCE INFORMATION RELATED TO THIS REVISION Federal Aviation Administration (FAA) Notice of Proposed Rule Making 2017-NM-090-AD, is related to this service bulletin.

Airplanes NP901 - NP904 were added to new Group 51 of this service bulletin effectivity.

Effects of this Revision on airplanes on which the Original Issue or Revision 1 was previously done:

None.

REASON FOR REVISION This revision is sent to add airplanes to the service bulletin effectivity and add work instructions for new Group

51.

These sections were changed:

1. Summary, Action, added new Group 51 to the applicability.

2. Paragraph 1.A., Effectivity, added airplanes NP901 - NP904 in Group 51.

3. Paragraph 1.C., Reason, added statement for Revision 2.

4. Paragraph 1.D., Description, added new Group 51 to the applicability and added statement for Revision

2.

5. Paragraph 1.E., Compliance, added Notice of Proposed Rule Making.

6. Paragraph 1.G., Manpower, corrected figure reference for Group 14, added table for new Group 51 and added group applicability for optional work.

7. Paragraph 1.H., Weight and Balance Changes, added new Group 51 to the applicability.

8. Paragraph 1.J.1., Existing Data, added references.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: May 05, 2016 757-52-0093Revision 2: November 14, 2017 7 of 337

9. Paragraph 1.J.3., Installation Drawings Used in the Preparation of this Service Bulletin, added drawing reference and corrected drawing references.

10. Paragraph 1.K.1., Publications Affected, changed publications affected.

11. Paragraph 2.A., Material Price and Availability, added group applicability and new Group 51 to the applicability.

12. Paragraph 2.C.1., Kits/Parts, added Group 51 to the applicability.

13. Paragraph 2.C.2., Parts and Materials Supplied by the Operator, added information for Alodine replacement.

14. Paragraph 3.A., General Information, added note.

15. Paragraph 3.B., Work Instructions, added work instructions for new Group 51 and added group applicability for optional work.

16. FIGURE 14, 17, 18, 23, 47, 50, 54, 65, 72, 74 and 81 added new Group 51 to the applicability.

17. FIGURE 29 through 43, corrected duplicate RBL.

18. FIGURE 21 through 26 and 61 through 66, corrected reference.

19. FIGURE 87 and 88, added group applicability.

20. FIGURE 89, 90, 91 and 92, new figures added for new Group 51.

Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity and format changes, to show the location of all content changes.

Pages with no vertical lines have no changes.

REVISION HISTORY May 05, 2016Original Issue:

April 21, 2017Revision 1:

November 14, 2017Revision 2:

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: May 05, 2016 757-52-0093Revision 2: November 14, 2017 8 of 337 BOEING SERVICE BULLETIN 757-52-0093

Commercial Airplanes 757 Service Bulletin

SPECIAL ATTENTION SummaryNumber: 757-52-0093Original Issue: May 05, 2016 Revision 2: November 14, 2017 ATA System: 5234 SUBJECT: DOORS - No. 1 and 2 Cargo Door - Cargo Door Arm Switch and Relay Installation BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS DOCUMENT IMMEDIATELY.

CONCURRENT REQUIREMENTS Refer to Paragraph 1.B., Concurrent Requirements.

BACKGROUND This service bulletin is sent to give instructions to install new switches, relays and related wiring to the forward and aft cargo compartment door control system. The internal contacts of the current cargo door control switch can stay in a closed position when the switch is released. This is caused by the internal contacts of the switch welding together. The safety intent of this service bulletin is to prevent failures of the cargo door control switch from allowing un-commanded movement of the cargo door, which if not corrected, could lead to personnel injury or death.

Operators have experienced cases where the cargo door has continued to move after the cargo door control switch has been released. The momentary cargo door control switch was released to stop the door. The cargo door control switch stuck in the close position and the door continued to move in the close direction resulting in an injury.

With the new cargo door control and arm switch configuration installed, the operator must manually move both switches to operate the cargo door. Both switches are spring loaded to the off position and releasing either switch will stop the door operation. The design change of the cargo door open/close circuitry by adding the cargo door arm switch in accordance with this service bulletin, will prevent failures that could lead to un-commanded movement of the cargo door. In addition, the periodic functional check of both cargo door control and arm switches required by this service bulletin, will provide a means to detect latent failures of either switch.

Boeing Service Related Problem (SRP) 757-SRP-52-0119 is related to this service bulletin.

Boeing Fleet Team Digest (FTD) 757 FTD 52-6001 is related to this service bulletin.

As a part of a service bulletin remote certification program, this change was completed on airplane NT976 by Service Bulletin 757-52-0093 RC01 before the Original Issue of this service bulletin. The change completed on airplane NT976 by Service Bulletin 757-52-0093 RC01 is equivalent to the Original Issue of this service bulletin.

Airplane NT976 has the configuration of a Group 12 airplane.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: May 05, 2016 757-52-0093Revision 2: November 14, 2017 9 of 337

This table is provided to operators for planning purposes only. Refer to the applicable sections for more information.

ReferenceAffectedPlanning Data Paragraph 1.A.2., Spares AffectedNoSpares Affected Paragraph 1.E., Compliance and Paragraph

1.F., Approval YesAD Related Paragraph 1.H., Weight and Balance ChangesYesWeight and Balance Change Paragraph 1.I., Electrical Load DataYesElectrical Load Changed Paragraph 1.K., Publications AffectedYesPublications Affected Paragraph 1.K., Publications AffectedNoAirplane Flight Operations Affected (Flight Crew Operations Manual and/or FAA Approved Airplane Flight Manual) Paragraph 2.C.1., Kits/PartsYesKits/Parts Required Paragraph 2.C.2., Parts and Materials Supplied by the Operator YesOperator Supplied Parts/Material Paragraph 2.F., Special Tooling Necessary to do this Service Bulletin NoSpecial Tooling Required ACTION Get access to the main electronics compartment and remove the floor panels. Get access to the forward and aft cargo compartments and remove the sidewall and ceiling linings. In the main electronics compartment, make a cutout in the P65 Panel, install a relay and ground block. At the P43 forward cargo compartment control panel make a cutout and install the cargo door control and arm switches. At the P44 aft cargo compartment control panel make a cutout and install the cargo door control and arm switches.

Group 1:

Between the P43 and P65 Panels, install wire bundles W0816 and W4104.

Group 2-20, 22-51:

Between the P43 and P65 Panels, install wire bundles W0816, W4104 and W4162.

Group 21:

Between the P43 and P65 Panels, install wire bundles W0816, W4162 and W6634.

At the P65 Panel, install relay K10433 and wire bundle W0808.

Group 1:

Between the P44 and P74 Panels, install wire bundles W1016 and W2632.

Group 2, 5, 50:

Between the P44 Panel and the E6 Rack, install wire bundles W1016, W2662 and W4106.

Group 3, 6-7, 9, 28:

Between the P44 Panel and the E6 Rack, install wire bundles W1016, W2662 and W2716.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: May 05, 2016 757-52-0093Revision 2: November 14, 2017 10 of 337 BOEING SERVICE BULLETIN 757-52-0093

Group 4, 8, 10-20, 22-27, 29-49, 51:

Between the P44 Panel and the E6 Rack, install wire bundles W1016, W2632 and W2662.

Group 21:

Between the P44 Panel and the E6 Rack, install wire bundles W1016, W2660 and W5910.

Group 1:

At the P74 Panel, install relay K10434 and wire bundle W1028.

Group 20, 23, 32, 41:

At the E6 Rack, install relay K10434 and wire bundle W1040.

Group 2-19, 21-22, 24-31, 33-40, 42-51:

At the E6 Rack, install relay K10434 and wire bundle W1024.

Do a continuity test of the new wires. Install the floor panels, sidewall and ceiling linings. Do the tests to make sure the No. 1 and No 2 cargo doors work correctly.

EFFECTIVITY 757-200, 757-200CB, 757-200PF, 757-300 Airplanes. Refer to Paragraph 1.A., Effectivity, Airplanes, for the list of affected airplanes.

COMPLIANCE Refer to Paragraph 1.E., Compliance.

INDUSTRY SUPPORT INFORMATION Boeing warranty remedies are not available for the configuration changes given in this service bulletin.

MANPOWER Refer to Paragraph 1.G., Manpower.

MATERIAL INFORMATION Boeing Supplied Kits/Parts.

Refer to Paragraph 2.A., Material - Price and Availability.

Operators are encouraged to complete the survey provided in APPENDIX B of this service bulletin to help Boeing predict the quantity and timing of the Boeing Supplied Kits/Parts.

Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.

Original Issue: May 05, 2016 757-52-0093Revision 2: November 14, 2017 11 of 337 BOEING SERVICE BULLETIN 757-52-0093

Page 12OCROpen in PDF

BOEING SERVICE BULLETIN 757-52-0093 AT THE P65 PANEL:

-MAKE A CHANGE TO A PANEL ASSEMBLY,

MAKE A WIRING CHANGE, INSTALL A RELAY.

P43 CONTROL PANEL:

- REPLACE ONE SWITCH

AND ADD ONE SWITCH P44 CONTROL PANEL:

-REPLACE ONE SWITCH AND ADD ONE SWITCH.

AT THE E6 RACK (TYPICAL):

-MAKE A WIRING CHANGE, INSTALL A RELAY.

2461054 Original Issue: May 05, 2016 Revision 2: November 14, 2017 PROPRIETARY - Copyright © Unpublished Export Controlled ECCN: 9E991 - BOEING 757-52-0093 Work - See page 1 for details. 12 of 337

Pages 13–24 of 337